TECHNICAL PAPERS
May 1, 2009

Modular Assembly with Postponement to Improve Health, Safety, and Productivity in Construction

Publication: Practice Periodical on Structural Design and Construction
Volume 14, Issue 2

Abstract

This paper presents the outcome of an engineering study as part of the design and development of a lean and agile construction system and in particular its supply chain component. This combines modular assembly with a postponement function to be tested on a case study project (not reported here), the objective of which is to improve health, safety, and productivity for the company sponsoring the research. The contribution to research is the combination of countermeasures described in this paper that have been developed and incorporated into a wider construction system, in the same way that manufacturing has used this strategy with great success. A further output is the development and use of an innovative method for assembling, transporting, and installing mechanical and electrical modules, whereby modularization can be achieved with or without offsite manufacturing capability. The research forecasts a reduction of onsite labor of 35% compared to using traditional methods of construction, with less onsite operatives at risk of injury carrying out simpler assembly tasks within ergonomic mobile work cells. Further research is proposed to measure the benefits of the construction system following its implementation on a case study project.

Get full access to this article

View all available purchase options and get full access to this article.

References

Ballard, G., and Matthews, O. (2004). “Championship—Prefabrication and assembly.” Proc., Twelfth Annual Conf. of the Int. Group for Lean Construction (IGLC-12), 625–628.
Bertelsen, S., Koskela, L., Henrich, G., and Rooke, J. (2006). “Critical flow—Towards a construction flow theory.” Proc., 14th Annual Conf. of the Int. Group for Lean Construction (IGLC-14), 31–40.
Burbidge, J. L. (1996). Period batch control, Oxford University Press, New York.
Court, P., Pasquire, C., Gibb, A. G. F., and Bower, D. (2005). “Lean as an antidote to labour cost escalation on complex mechanical and electrical projects.” Proc., 13th Annual Conf. of the Int. Group for Lean Construction (IGLC-13), 3–11.
Court, P., Pasquire, C., Gibb, A. G. F., and Bower, D. (2006). “Design of a lean and agile construction system for a large and complex mechanical and electrical project.” Proc., Fourteenth Annual Conf. of the Int. Group for Lean Construction (IGLC-14), 151–164.
Court, P., Pasquire, C., Gibb, A. G. F., and Bower, D. (2007). “Transforming traditional construction into a modern process of assembly using construction physics.” Proc., 15th Annual Conf. of the Int. Group for Lean Construction (IGLC-15), 345–356.
Court, P., Pasquire, C., Gibb, A. G. F., and Bower, D. (2008). “Modular assembly in healthcare construction—A mechanical and electrical case study.” Proc., Sixteenth Annual Conf. of the Int. Group for Lean Construction (IGLC-16), 521–531.
Forza, C. (1996). “Work organisation in lean production and traditional plants—What are the differences?” Int. J. Operat. Product. Manage., 16(2), 42–62.
Fredriksson, P. (2006). “Mechanisms and rationales for the coordination of a modular assembly system—The case of Volvo cars.” Int. J. Operat. Product. Manage., 26(4), 350–370.
Gibb, A. G. F. (2006). “Occupational health: Slow accidents need solutions fast.” Global Unity for Safety and Health in Construction, Proc., CIBW99 Int. Conf., D. Fang, R. M. Choudry, and J. W. Hinze, eds., Tsinghua Univ. Press, Beijing, 22–33.
Goodier, C. I., and Gibb, A. G. F. (2005). “Barriers and opportunities for offsite in the UK.” Systematic Innovation in the Management of Projects and Processes, Proc., Helsinki Int. Joint Symp., A. S. Kazi, ed., 148–158.
Granath, J. A. (1998). “Torslanda to Uddevalla via Kalmar: A journey in production practice in Volvo.” Proc., Seminário Internacional Reestruturaçã Productiva, Flexibilidade do Trabalho e Novas Comp-etências Profissionais, COPPE/UFRJ, 1–15, ⟨http://www.design4change.com/LinkedDocuments/Torslanda%20to%20Uddevalla%20via%20Kalmar.pdf⟩ (Feb. 12, 2009).
Hawkins, G. (1997). “Improving M&E site productivity.” BSRIA Technical Note No. TN 14/97, Building Services Research and Information Association, Bracknell, U.K.
Hawkins, G. (2002). “Site productivity—2002: A guide to the uptake of improvements.” BSRIA Technical Note No. TN 13/2002, Building Services Research and Information Association, Bracknell, U.K.
Health and Safety Executive (HSE). (2000). Backs for the future: Safe manual handling in construction, HSE Books, Norwich, U.K.
Health and Safety Executive (HSE). (2007a). “Better backs in construction.” ⟨http://www.hse.gov.uk/construction/backs/index.htm⟩ (Mar. 4, 2007).
Health and Safety Executive (HSE). (2007b). “Health and safety in the construction industry.” ⟨http://www.hse.gov.uk/construction/index.htm⟩ (Mar. 4, 2007).
Health and Safety Executive (HSE). (2007c). “Musculoskeletal disorders—HSE and MSD’s.” ⟨http://www.hse.gov.uk/msd/hsemsd.htm⟩ (Mar. 4, 2007).
Hopp, W. J., and Spearman, M. L. (2001). “The MRP crusade.” Factory physics, 2nd Ed., Irwin/McGraw-Hill, New York, 109–150.
Horman, M. J., Orosz, M. P., and Riley, D. R. (2006). “Sequence planning for electrical construction.” J. Constr. Eng. Manage., 132(4), 363–372.
Liker, J. K. (2004). The Toyota way: 14 management principles from the world’s greatest manufacturer, McGraw-Hill, New York.
Pasquire, C. L., and Connolly, G. E. (2002). “Leaner construction through off-site manufacturing.” Proc., Tenth Annual Conf. of the Int. Group for Lean Construction (IGLC-10), 263–275.
Pasquire, C. L., and Connolly, G. E. (2003). “Design for manufacture and assembly.” Proc., Eleventh Annual Conf. of the Int. Group for Lean Construction (IGLC-11), 184–194.
Skipworth, H., and Harrison, A. (2004). “Implications of form postponement to manufacturing: A case study.” Int. J. Prod. Res., 42(10), 2063–2081.
Thomas, H. R., Horman, M. J., and de Souza, U. E. L. (2004). “Symbiotic crew relationships and labor flow.” J. Constr. Eng. Manage., 130(6), 908–917.
Ulrich, K. T., and Eppinger, S. D. (2004). “Product architecture.” Product design and development, 3rd Ed., McGraw-Hill, New York, 163–186.
Wilson, D. (2000). “Innovative M&E installation.” BSRIA ACT No. 9/2000, Building Services Research and Information Association, Bracknell, U.K.
Winch, G. M., and North, S. (2006). “Critical space analysis.” J. Constr. Eng. Manage., 132(5), 473–481.
Yang, B., and Burns, N. (2003). “Implications of postponement for the supply chain.” Int. J. Prod. Res., 41(9), 2075–2090.

Information & Authors

Information

Published In

Go to Practice Periodical on Structural Design and Construction
Practice Periodical on Structural Design and Construction
Volume 14Issue 2May 2009
Pages: 81 - 89

History

Received: Jan 10, 2008
Accepted: Aug 11, 2008
Published online: May 1, 2009
Published in print: May 2009

Permissions

Request permissions for this article.

Authors

Affiliations

Peter F. Court [email protected]
Research Engineer, Dept. of Civil and Building Engineering, Loughborough Univ., U.K. E-mail: [email protected]
Christine L. Pasquire [email protected]
Dept. of Civil and Building Engineering, Loughborough Univ., U.K. E-mail: [email protected]
Dept. of Civil and Building Engineering, Loughborough Univ., U.K. E-mail: [email protected]
David Bower [email protected]
Principal Fellow, Warwick Manufacturing Group, Univ. of Warwick, U.K. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share