State Increment Method of Life-Cycle Cost Analysis for Highway Management
Publication: Journal of Infrastructure Systems
Volume 1, Issue 3
Abstract
A state increment method of life-cycle cost analysis (SILCCA) is presented for project-level evaluation of highway infrastructure maintenance options. The method involves: (1) Characterization of facility's physical and functional characteristics into discrete states; (2) specification of treatment alternatives for each state; (3) prediction of facility life-cycle performance as a series of state transitions; and (4) application of dynamic programming for life-cycle cost analysis. Four important advantages of SILCCA are: (1) A systematic procedure is used to identify treatment alternatives based on assessed condition; (2) engineering expertise is used to capture the effect of treatments on pavement condition and in turn improve the accuracy of prediction; (3) analytical and computational efficiency over traditional, Markov, and semi-Markov methods; and (4) a convenient framework for integration with network-level optimization methods. Based on the findings of a case study, it is concluded that SILCCA is systematic, accurate, and efficient.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Carnahan, J. V., Davis, W. J., Shahin, M. Y., Keane, P. L., and Wu, M. I. (1987). “Optimal maintenance decisions for pavement management.”J. Transp. Engrg., ASCE, 113(5).
2.
Feighan, K. J., Shahin, M. Y., and Sinha, K. C. (1987). “A dynamic programming approach to optimization for pavement management systems.”Proc., 2nd North Am. Conf. on Managing Pavements, Transp. Res. Board (TRB), Washington, D.C., 2, 196–206.
3.
Grivas, D. A., Ravirala, V., and Schultz, B. C. (1991). “Guidelines for life-cycle cost analysis of Thruway pavements.”Rep. No. RPI.NYSTA-9a.1, Rensselaer Polytech. Inst., Troy, N.Y.
4.
Grivas, D. A., Ravirala, V., and Schultz, B. C. (1993). “State increment optimization methodology for network-level pavement management.”Transp. Res. Record No. 1397, Transp. Res. Board (TRB), Washington, D.C.
5.
Jiang, Y., and Sinha, K. C. (1989). “Bridge service life prediction model using the Markov chain.”Transp. Res. Record No. 1223, Transp. Res. Board (TRB), Washington, D.C.
6.
Larson, R. E. (1968). State increment dynamic programming. Am. Elsevier Publishing Co., Inc., N.Y.
7.
Nesbitt, D. M., and Sparks, G. A. (1987). “A computationally efficient system for infrastructure management with application to pavement management.”Proc., 2nd North Am. Conf. on Managing Pavements, Transp. Res. Board (TRB), Washington, D.C., Vol. 2, 219–239.
8.
Novak, E. C. Jr., and Kuo, W. (1992). “Life-cycle cost versus network analysis.”Transp. Res. Record No. 1344, Transp. Res. Board (TRB), Washington, D.C.
9.
O'Brien, S. K. (1989). Turbo Pascal 5.5 : the complete reference. Borland Osborne/McGraw-Hill Programming Ser., Calif.
10.
Peterson, D. E. (1985). “Life-cycle cost analysis of pavements.”NCHRP—synthesis of highway practice, 122, Transp. Res. Board (TRB), Washington, D.C.
11.
Ravirala, V. (1994). “Multi-criteria optimization methodologies for highway program development,” PhD thesis, Rensselaer Polytechnic Inst., Troy, N.Y.
12.
Ravirala, V., and Grivas, D. A. (1994). “A non-preemptive goal programming methodology for developing an annual pavement program.”Transp. Res. Record No. 1455, Transp. Res. Board (TRB), Washington, D.C.
13.
Saraf, C. L., Kennedy, J. C. Jr., Majidzadeh, K., and Dudley, S. W. (1991). “Life-cycle analysis of the Ohio pavement rehabilitation demonstration projects.”Preprint No. 910313, Transp. Res. Board (TRB), Washington, D.C.
14.
Shapiro, J. F. (1979). Mathematical programming : structures and algorithms. John Wiley & Sons, New York, N.Y.
15.
Thompson, P. D., Neumann, L. A., Miettinen, M., and Talvitie, A. (1987). “A micro-computer Markov dynamic programming system for pavement management in Finland.”Proc., 2nd North Am. Conf. on Managing Pavements, Transp. Res. Board (TRB), Washington, D.C., Vol. 2, 241–252.
16.
Uddin, W., Carmichael, R. F. III, and Hudson, W. R. (1985). “Life-cycle analysis for pavement management decision making—state of the art review.”Rep. No. LCC/1, Texas Res. and Development Found., Austin, Tex.
17.
Uddin, W., Carmichael, R. F. III, and Hudson, W. R. (1985). “Life-cycle analysis for pavement management decision making—methodology development.”Rep. No. LCC/2, Texas Res. and Development Found., Austin, Tex.
18.
Vyce, J. M. (1985). “A life-cycle cost analysis for asphalt and concrete pavements.”Rep. FHWA/NY/SR-85/82, Engrg. Res. and Development Bureau, New York State Dept. of Transp., Albany, N.Y.
19.
Wang, K. C. P., Zaniewski, J., Way, G., and Delton, J. (1993). “Revisions to Arizona Department of Transportation pavement management system.”Transp. Res. Record No. 1397, Transp. Res. Board (TRB), Washington, D.C.
Information & Authors
Information
Published In
Copyright
Copyright © 1995 American Society of Civil Engineers.
History
Published online: Sep 1, 1995
Published in print: Sep 1995
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.