Perceptions of Contractual Risk Allocation in Construction Supply Chains
Publication: Journal of Professional Issues in Engineering Education and Practice
Volume 134, Issue 1
Abstract
Common perceptions of contractual risk allocation are the basis of a harmonious, effective and efficient construction project. This paper explores the extent to which common perceptions of risk allocation exist along the construction supply chain. The results of a survey indicate that differing perceptions are worryingly high in all relationships, but particularly further down the supply chain. The paper indicates the relationships in which this is most likely to occur and the types of risk it is most likely to affect. The results provide important lessons for project managers, negotiators and contract drafters. In particular, by providing a better understanding of where and how differences in risk perceptions are likely to emerge, they help those negotiating and drafting contracts focus their energies more effectively to help minimize the potential for unnecessary loss and dispute. Finally, our results indicate that the key to better managing perceptions of risk is fundamentally one of communication, consultation and involvement in contractual decision-making. The key point is that contractual allocations of risk have little meaning if they are separated from the social and behavioral context in which risk is experienced by those involved in a project.
Get full access to this article
View all available purchase options and get full access to this article.
References
Akintoye, A., Hardcastle, C., Chinyio, E., and Assenova, D. (2001). Framework for risk assessment and management of private finance initiative projects, Glasgow Caledonian University Press, Glasgow, Scotland, U.K.
Andi, S., and Minato, T. (2003). “Navigational measures for managing defective designs.” J. Manage. Eng., 21(1), 10–16.
Argyris, C. (1990). Overcoming organizational defenses, Allyn and Bacon, London.
Bea, R. G. (1994). The role of human error in design, construction, and reliability of marine structures, Ship Structure Committee SSC-378, U.S. Coastguard, Washington, D.C.
Benson, R. E. (2005). “Contractual management, allocation, and transfer of construction project risk.” Holland & Hart LLP, Colorado Springs, ⟨www.westernconstructionlaw.com⟩ (June 2006).
Booth, S. A. (1993). Crisis management strategy—Competition and change in modern enterprises, Routledge, London.
Boothroyd, C., and Emmett, J. (1996). Risk management—A practical guide for construction professionals, Witherby and Co., London.
Bult-Spiering, M., and Dewulf, G. (2006). Strategic issues in public-private partnerships, Blackwell, Oxford, U.K.
Cartlidge, D. (2006). Public private partnerships in construction, Taylor and Francis, London.
Chapman, C., and Ward, S. (2002). “Project risk management; the required transformations to become project uncertainty management.” Frontiers of project management research, D. Slevin and D. Cleland, eds., Project Management Institute, Newtown Square, Pa., 405–417.
Comfort, L. K. (1993). “Integrating information technology in to international crisis management and policy.” J. Contingen. Crisis Manage., 1(1), 15–27.
Edwards, L. (1995). Practical risk management in the construction industry, Thomas Telford, London.
Edwards, P. J., and Bowen, P. A. (2005). Risk management in project organisations, UNSW Press, Sydney.
Egan, M. (1998). Rethinking construction: The report of the construction task force, Department of the Environment, Transport and the Regions (DETR), London.
Emmerson, H. (1962). Survey of problems before the construction industry, HMSO, London.
Furmston, M. (2003). Construction contracts, Blackwell, Oxford, U.K.
Gambatese, J. A. (2000). “Safety in a designer’s hands.” Civ. Eng. (N.Y.), 5659.
Grimsey, D., and Lewis, M. (2004). Public private partnerships, Edward Elgar, Cheltenham, U.K.
Hartman, F. T., Snelgrove, P., and Ashrafi, R. (1998). “Appropriate risk allocation in lump sum contracts—Who should take the risks.” Cost Eng., 40(7), 21–26.
Hatem, D. (1997). “Owner as Additional Insured under Design Professionals Policy.” Zurich Insurance Company, Zurich, Switzerland, ⟨www.aecselect.com⟩.
Hodge, G., and Greve, C. (2005). The challenge of public private partnerships, Edward Elgar, Cheltenham, U.K.
ICE. (2000). Risk analysis and management for projects, ICE and Institute of Actuaries, London.
Kangari, R. (1995). “Risk Management Perceptions and Trends of U.S. Construction.” J. Constr. Eng. Manage., 121(4), 422–429.
Kelly, J., MacPherson, S., and Male, S. (1992). “The briefing process: A review and critique.” Paper Number 12, The Royal Institution of Chartered Surveyors, London.
Latham, M. (1994). Constructing the team, HMSO, London.
Loosemore, M. (1999). “Power, responsibility and construction conflict.” Constr. Manage. Econom., 17(6), 699–711.
Loosemore, M., Raftery, J., Reilly, C., and Higgon, D. (2005). Risk management in projects, Taylor and Francis, London.
McCallum, M. H. (2000). A quick primer on construction risks and contracting practices, Associated General Contractors of America, Arlington, Va.
National Audit Office (NAO). (2001). Managing the relationship to secure a successful partnership in PFI deals, HMSO, London.
National Economic Development Council (NEDC). (1988). Faster building for commerce, HMSO, London.
Richey, J. L., and Walulik, D. W. (2001). “Change orders can create unexpected costs.” Constr. Law Bus., 2(2), 1–6.
Smee, R. (2002). Construction risk, Presentation Services, London.
Smith, N. J. (1999). Managing risk in construction projects, Blackwell Science, Oxford, U.K.
Stockenberg, R. A. (2004). “Whose duty is the schedule?” Build. Des. Constr., 01–04(4), 9–10.
Trench, D. (1991). On Target—Design and manage cost procurement system, Thomas Telford, London.
Uff, J. (1995). “Contract documents and the division of risk.” Risk management and procurement in construction, J. Uff and A. M. Odams, eds., Centre for Construction Law and Management, Kings College, London, 49–69.
Wang, M.-T., and Chou, H.-Y. (2003). “Risk allocation and risk handling of highway projects in Taiwan.” J. Manage. Eng., 19(2), 60–68.
Yamaguchi, H. (2002). “Risk allocation in privately financed projects.” Thesis, The Univ. of New South Wales, Sydney, Australia.
Information & Authors
Information
Published In
Copyright
© 2008 ASCE.
History
Received: Mar 19, 2007
Accepted: Apr 19, 2007
Published online: Jan 1, 2008
Published in print: Jan 2008
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.