Contractors’ Views of the Potential Causes of Inconsistencies between Design and Construction in Saudi Arabia
Publication: Journal of Performance of Constructed Facilities
Volume 20, Issue 1
Abstract
The study identifies the causes of inconsistencies between the design and construction of large building projects. To achieve the study objectives, a questionnaire survey was carried out to collect information on potential causes of inconsistencies at the project design and construction interface. Responses from 27 contractors were analyzed. The results suggest that the involvement of designer as consultant, communication gap between constructor and designer, insufficient working drawing details, lack of coordination between parties, lack of human resources in design firm, lack of designer’s knowledge of available materials and equipment, and incomplete plans and specifications were considered as the most important causes of the project design and construction interface inconsistencies. On the other hand, project management as a professional service, weather conditions, nationalities of participants, involvement of the contractor in design conceptual phase, unforeseen problems, involvement of the contractor in design development phase, and government regulations were the least important causes of inconsistencies between professionals at the project design and construction interface in large building projects.
Get full access to this article
View all available purchase options and get full access to this article.
References
Adrian, J. J. (1983). Building construction handbook, Reston Publication Co., Reston, Va.
Al-Dubaisi, A. H. (2000). “Change orders in construction projects in Saudi Arabia.” MS thesis, King Fahd Univ. of Petroleum and Minerals, Dhahran, Saudi Arabia.
Al-Ghamdi, A. (1999). “An overview of construction industry in the Kingdom of Saudi Arabia.” MS thesis, King Fahd Univ. of Petroleum and Minerals, Dhahran, Saudi Arabia.
Al-Hammad, A. M. (2000). “Common interface problems among various construction parties.” J. Perform. Constr. Facil., 14(2), 71–74.
Al-Hammad, A. M., and Assaf, S. A. (1992). “Design-construction interface problems in Saudi Arabia.” Build. Res. Inf., 20(1), 60–63.
Al-Hazmi, M. H. S. (1987). “Causes of delays in large building construction projects.” MS thesis, King Fahd Univ. of Petroleum and Minerals, Dhahran, Saudi Arabia.
Al-Mansouri, O. H. (1988). “The relationship between the designer and the contractor in Saudi Arabia.” PhD thesis, Univ. of Reading, England.
Al-Yousif, F. A. (2001). “Assessment of constructability practices among general contractors in the eastern province of Saudi Arabia.” MS thesis, King Fahd Univ. of Petroleum and Minerals, Dhahran, Saudi Arabia.
Arain, F. M. (2002). “Design-construction interface dissonances.” MS thesis, King Fahd Univ. of Petroleum and Minerals, Dhahran, Saudi Arabia.
Assaf, S. A., and Al-Hammad, A. M. (1988). “The effect of economic changes on construction cost.” American Association of Cost Engineers Transactions, Morgantown, W. Va., 63–67.
Assaf, S. A., Al-Hammad, A. M., and Al-Shihah, M. (1996). “Effects of faulty design and construction on building maintenance.” J. Perform. Constr. Facil., 10(4), 171–174.
Chappell, D., and Willis, A. (1996). The architect in practice, 8th Ed., Blackwell Science Ltd., Malden, Mass.
Clough, R. H., and Sears, G. A. (1994). Construction contracting, 6th Ed., Wiley, New York.
Construction Industry Institute (CII). (1986). “Impact of various construction contract types and clauses on project performance.” Publication 5-1, Univ.of Texas at Austin, Austin, Tex.
Cox, S., and Hamilton, A. (1995). Architect’s job book, 6th Ed., RIBA Publications, Royal Institute of British Architects, U.K.
Fisk, E. R. (1997). Construction project administration, 5th Ed., Prentice-Hall, Englewood Cliff, N. J.
Fredrickson, K. (1998). “Design guidelines for design-build projects.” J. Manage. Eng., 14(1), 77–80.
Gambatese, J. A., and McManus, J. F. (1999). “Discussion of ‘The constructability review process: A constructor’s perspective,’ by R. Mendelsohn.” J. Manage. Eng., 15(1), 93–94.
Halpin, D. W., and Woodhead, R. W. (1980). Construction management, McGraw-Hill, New York.
Kostoff, S. (1977). The architect: Chapters in the history of the profession, Oxford University Press, New York.
Mendelsohn, R. (1997). “The constructability review process: A constructor’s perspective.” J. Manage. Eng., 13(3), 17–19.
O’Brien, J. J. (1998). Construction change orders, McGraw-Hill, New York.
Puddicombe, M. S. (1997). “Designer and contractors: Impediments to integration.” J. Constr. Eng. Manage., 123(3), 245–252.
Wang, Y. (2000). “Coordination issues in Chinese large building projects.” J. Manage. Eng., 16(6), 54–61.
Information & Authors
Information
Published In
Copyright
© 2006 ASCE.
History
Received: Sep 7, 2004
Accepted: Jan 18, 2005
Published online: Feb 1, 2006
Published in print: Feb 2006
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.