Effectiveness of Preventative Maintenance Treatments Using Fourteen SPS-3 Sites in Texas
Publication: Journal of Performance of Constructed Facilities
Volume 17, Issue 3
Abstract
Fourteen Texas SPS-3 test sites were studied to determine the effectiveness of preventative maintenance treatments. These sections were built on four highway classifications (IH, US, SH, and FM) in different climates and with different levels of traffic and subgrade support. Almost all 14 SPS-3 sites were given preventative maintenance treatments (thin overlay, slurry seal, crack seal, and chip seal) in Fall 1990. The distress score concept used by the Texas Department of Transportation (TxDOT) was adopted in this study to judge the effectiveness of preventative maintenance treatments. TxDOT has used this concept since the early 1980s, though the utility factors have been revised few times. The distress score quantifies the visible surface wear due to traffic and environmental influences. Only very few sections experienced premature failures on the SPS-3 sites in Texas. In many cases, superior underlying pavement conditions have been found. The chip seal has the most sites in which it is rated the best performer. The chip seals performed well on a wide range of pavement conditions. In fact, chip seals have the highest distress score for both high and low traffic areas. When initial cost is considered, crack seal provides the best alternative for low traffic routes that have a sound underlying pavement structure. For high traffic routes, chip seal is a better choice. However, a thin overlay is the most effective for rut resistance. Since the thin overlay has the highest initial cost, it is best used on high traffic routes where rutting is a major concern. If rutting is not a concern, chip seal is the best choice for a high traffic area. The treatments applied to US84 sections were too late and did not reach seven years of life as normally was expected, which reconfirms that the timing for preventive maintenance treatment is very important.
Get full access to this article
View all available purchase options and get full access to this article.
References
Daleiden, J. F., and Eltahan, A. A. (2000). “Report on the SPS3-3 experiment of the Long Term Pavement Performance Project in the southern region.” FHWA-IF-00-026, Federal Highway Administration, Washington, D.C.
Fugro-BRE, Inc. (1991). SPS-3 construction report, Southern Regional Coordination Office,
Geoffroy, D. (1996). “Cost-effective preventive pavement maintenance.” NCHRP Synthesis 223, National Cooperative Highway Research Program,
Smith, R. T., Freeman, T., and Pendleton, O. (1993). “Pavement maintenance effectiveness.” SHRP H358, National Research Council, Washington, D.C.
Stampley, B. E., Miller, B., Smith, R., and Scullion, T. (1995). “Pave-ment management information system concepts, equations, and analysis pavements.” Research Rep. 1989-1, Texas Transportation Institute,
Strategic Highway Research Program (SHRP). (1993). “Distress identification manual for the Long-Term Pavement Performance Project.” SHRP-P-338, National Research Council, Washington, D.C.
Texas Department of Transportation (TxDOT). (2000). Pavement Management Information System (PMIS) technical manual, Austin, Tex.
Information & Authors
Information
Published In
Copyright
Copyright © 2003 American Society of Civil Engineers.
History
Received: Mar 29, 2002
Accepted: Jun 19, 2002
Published online: Jul 15, 2003
Published in print: Aug 2003
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.