TECHNICAL PAPERS
Aug 1, 1995

Monitoring Completed Coastal Projects

Publication: Journal of Performance of Constructed Facilities
Volume 9, Issue 3

Abstract

A U.S. Army Corps of Engineers program has been established to monitor completed coastal projects. Reports have been made to date for 12 projects, evaluating their functional and structural performance. Projects monitored are located on the Atlantic, Pacific, Gulf, and Great Lakes coastlines. Project monitoring includes: jettied inlets, including inlet hydraulics and sedimentation, and evaluation of jetty structures; harbors, including harbor waves, currents, and resonance; breakwaters, including wave and shoreline interaction and structural stability; and beach fills, including longshore and cross-shore sediment motion. Major conclusions from the monitoring efforts are enumerated. In addition to functional and structural performance, there are several findings related to modeling inlets and harbors. The program has proved effective in identifying improvements to design criteria and methodology, construction practices, and maintenance techniques.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Bass, G. P., Fulford, E. T., Underwood, S. G., and Parson, L. E. (1994). “Rehabilitation of the South Jetty—Ocean City, Maryland.”Rep., TR-CERC-94-6, U.S. Army Engr. Wtrwy. Experiment Station, Vicksburg, Miss.
2.
Dean, R. G. (1984). “Principles of beach nourishment.”CRC handbook of coastal processes and erosion, P. D. Komar, ed., CRC Press, Boca Raton, Fla. 217–231.
3.
FitzGerald, D. M. (1988). “Shoreline erosional-depositional processes associated with tidal inlets.”Lecture notes on coastal and estuarine studies, D. G. Aubrey and L. Weishar, eds., Springer-Verlag, New York, N.Y. 186–225.
4.
Gebert, J. A., and Hemsley, J. M. (1991). “Monitoring of jetty rehabilitation at Manasquan Inlet, New Jersey.”Rep., MP CERC-91-8, U.S. Army Engr. Wtrwy. Experiment Station, Vicksburg, Miss.
5.
Hemsley, J. M.(1990). “Monitoring completed coastal projects—status of a program.”J. Coast. Res., 6(2), 253–263.
6.
Hemsley, J. M., Bottin Jr., R. R., and Mohr, M. C. (1991). “Monitoring of completed breakwaters at Cattaraugus Creek Harbor, New York.”Rep., MP CERC-91-10, U.S. Army Engrs. Wtrwy. Experiment Station, Vicksburg, Miss.
7.
Herndon, H. D., Andrew, M. E., Hemsley, J. M., and Bottin Jr., R. R. (1992). “Monitoring of jetty improvements at Umpqua River, Oregon.”Rep., MP CERC-92-1, U.S. Army Engrs. Wtrwy. Experiment Station, Vicksburg, Miss.
8.
Jarrett, J. T., and Hemsley, J. M. (1988). “Beach fill and sediment trap at Carolina Beach, North Carolina.”Rep., TR CERC-88-7, U.S. Army Engrs. Wtrwy. Experiment Station, Vicksburg, Miss.
9.
Kendall, T. R., and Melby, J. A. (1989). “Continued monitoring of 42-ton dolos movements and static stresses at Crescent City.”Stresses in concrete armor units, D. D. Davidson and O. T. Magoon, eds., ASCE, New York, N.Y.
10.
Larson, M., and Kraus, N. C.(1991). “Mathematical modelling of the fate of beach fill.”Coast. Engrg., 16(1), 83–114.
11.
LeBlanc, C., and Bottin Jr., R. R. (1992). “Monitoring of the beach erosion control project at Oakland Beach, Rhode Island.”Rep., MP-CERC-92-7, U.S. Army Engrs. Waterways Experiment Station, Vicksburg, Miss.
12.
Ledbetter, R. H. (1993). “Seismic risk for rubble mound structures.”Proc., 1992 Coast. Engrg. Workshop; EC 1110-2-276, U.S. Army Corps of Engrs., Washington, D.C.
13.
Lillycrop, L. S., Okihiro, M. S., Briggs, M. J., Harkins, G. S., and Boc, S. J. (1993). “Barbers Point Harbor, Oahu, HI, monitoring study.”Rep., TR-CERC-93-18, U.S. Army Engrs. Wtrwy. Experiment Station, Vicksburg, Miss.
14.
Lott, J. W. (1991). “Spud Point Marina Breakwater, Bodega Bay, Sonoma County, California.”Rep., MP-CERC-91-5, U.S. Army Engrs. Wtrwy. Experiment Station, Vicksburg, Miss.
15.
Lott, J. (1994). “Fisherman's Wharf Breakwater, San Francisco, California.”Rep., MP-CERC-94-8, U.S. Army Engrs. Wtrwy. Experiment Station, Vicksburg, Miss.
16.
Morang, A. (1992). “A study of geologic and hydraulic processes at East Pass, Destin, Florida.”Rep., TR-CERC-92-5, Vol. 1 and 2, U.S. Army Engrs. Wtrwy. Experiment Station, Vicksburg, Miss.
17.
“Movement and static stresses in dolosse.” (1993). Coast. Engrg. Tech. Note III-42, U.S. Army Engrs. Wtrwy. Experiment Station, Vicksburg, Miss.
18.
Nelson, E. E., and Hemsley, J. M. (1988). “Monitoring completed coastal projects: operational assessment of floating breakwaters, Puget Sound, Washington.”Rep., MP CERC-88-6, U.S. Army Engrs. Wtrwy. Experiment Station, Vicksburg, Miss.
19.
Pope, J., Bottin Jr., R. R., and Rowan, D. (1993). “Monitoring of east breakwater rehabilitation at Cleveland Harbor, Ohio.”Rep., MP-CERC-93-5, U.S. Army Engrs. Wtrwy. Experiment Station, Vicksburg, Miss.
20.
Shore protection manual. (1984). Coast. Engrg. Res. Ctr., U.S. Army Engrs. Wtrwy. Experiment Station, U.S. Government Printing Ofc., Washington, D.C.

Information & Authors

Information

Published In

Go to Journal of Performance of Constructed Facilities
Journal of Performance of Constructed Facilities
Volume 9Issue 3August 1995
Pages: 161 - 171

History

Published online: Aug 1, 1995
Published in print: Aug 1995

Permissions

Request permissions for this article.

Authors

Affiliations

Fred E. Camfield, Fellow, ASCE
Res. Hydr. Engr., Coast. Engrg. Res. Ctr., U.S. Army Engr. Wtrwy. Experiment Station, 3909 Halls Ferry Rd., Vicksburg, MS 39180–6199.
Carolyn M. Holmes
Program Mgr., Coast. Engrg. Res. Ctr., U.S. Army Engr. Wtrwy. Experiment Station, 3909 Halls Ferry Rd., Vicksburg, MS.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share