Ship‐Berth Link as Bulk Queueing System in Ports
Publication: Journal of Waterway, Port, Coastal, and Ocean Engineering
Volume 118, Issue 5
Abstract
The differing kinds of cargo ships with variable loads arrive in seaports and river ports. Single ships are predominant in seaports and they arrive with differing sizes of loads in some time periods. Moreover, these variable groups of loads require single service. However, in the river ports, the kinds of arriving cargo ships can be in the form of the single ships and in groups as pushed or pulled convoys or tows of barges. Also, every barge requires single service in a wharf or within a harbor. In both cases there is an analogy between the arrivals in variable groups of loads and the number of barges in convoys. Therefore, in this study, an analytical methodology, with the help of bulk queueing systems, to analyze and to plan berth requirements in the ports, is developed and convenient graphs are presented. Stated methodology may apply for determining the optimum number and the capacity of berths within seaports and river ports.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Agerschou, H., Lundgren, H., Sørensen, J., Ernst, J., Korsgaard, J., Schmidt, L. R., and Wee, K. C. (1983). Planning and design of ports and marine terminals. John Wiley and Sons, Inc., New York, N.Y.
2.
Bruun, P. (1976). Port engineering. Gulf Publishing Co., Houston, Texas, 207–255.
3.
Chaudhry, M. L., and Templeton, T. G. C. (1983). A first course in bulk queues, John Wiley & Sons, Inc., New York, N.Y.
4.
Frankel, E. G. (1977). Criteria and requirements for port development and operations—Models and analytical techniques, Massachusetts Inst. of Tech., Cambridge, Mass.
5.
Kabak, I. W. (1968). “Blocking and delays in bulk queueing systems.” Operation Res., 16(4), 830–840.
6.
Kabak, I. W. (1970). “Blocking and delays in bulk arrival queueing systems.” Mgmt. Sci., 17(1), 112–115.
7.
Mettam, J. D. (1967). “Forecasting delays to ships in port.” The Dock and Harbor Authority, 47, Apr., 380–382.
8.
Nicolaou, S. N. (1967). “Berth planning by evaluation of congestion and cost.” J. Wtwys. and Harb. Div., ASCE, 93(4), 107–132.
9.
Noritake, M., and Kimura, S. (1983). “Optimum number and capacity of seaport berths.” J. Wtwy. Port, Coast. Oc. Engrg., ASCE, 109(3), 323–339.
10.
Plumlee, C. H. (1966). “Optimum size seaport.” J. Wtwys. Harb. Div., ASCE, 92(3), 1–24.
11.
Radmilovich, Z. R. (1980). Port planning—Part of project—Factors reducing the capacities in ports, The Norwegian Inst. of Tech., Trondheim, Norway.
12.
“Port development—A handbook for planners in developing countries.” (1978). TD/B/C.4/238/Rev. 1, United Nations, New York, N.Y.
13.
Wanhill, S. R. C. (1974). “Further analysis of optimum size seaport.” J. Wtrwys., Harb. Coast. Div., ASCE, 100(4), 377–383.
14.
Williamson, E. (1976). “Berth throughput, berth occupancy and ship turn‐round time,” Manual on port management, Part three: Port operations, United Nations, New York, N.Y., 73–85.
15.
Yu, A. T. (1979). “U.S. barging: Design, terminal and operations.” Bulk Handling and Transport, 1, 171–180.
Information & Authors
Information
Published In
Copyright
Copyright © 1992 ASCE.
History
Published online: Sep 1, 1992
Published in print: Sep 1992
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.