TECHNICAL PAPERS
Nov 1, 1989

Considerations for Capping Subaqueous Dredged Material Deposits

Publication: Journal of Waterway, Port, Coastal, and Ocean Engineering
Volume 115, Issue 6

Abstract

Capping is the controlled, accurate placement of contaminated dredged material at a disposal site which is covered by a cap of clean isolating material. Capping projects are typically categorized as either level‐bottom placement or contained aquatic disposal. Field experience with subaqueous capping is limited, but 11 sites have been identified where the technique has been applied. Site selection considerations for capping projects are similar to those for any open‐water disposal. The influences of several site characteristics on capping have been identified and discussed. Modeling methods are available to aid in evaluating sites and designs. Additional information on cap materials, placement, and monitoring techniques are provided.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Bokuniewicz, H. J., et al. (1978). “Field study of the mechanics of the placement of dredged material at open‐water sites.” Technical Report D‐78‐7, U.S. Army Engineer Waterways Experiment Station, Vicksburg, Miss.
2.
Brannon, J. M., et al. (1985). “Effectiveness of capping in isolating contaminated dredged material from a biota and the overlying water.” Technical Report D‐85‐10, U.S. Army Engineer Waterways Experiment Station, Vicksburg, Miss.
3.
Brooks, N. H. (1973). Dispersion in hydrologic and coastal environments. Pacific Northwest Water Quality Laboratory, Northwest Region, U.S. Environmental Protection Agency, Corvallis, Ore.
4.
Clausner, J. E., and Truitt, C. L. (1987). “Propeller wash effects on protective armor layer design for contained aquatic disposal sites.” Bull. Permanent Int. Assoc. Navigation Congress, 58, 121–128.
5.
Coastal Engineering Research Center. (1984). Shore protection manual. Prepared by the U.S. Army Engineer Waterways Experiment Station, available for purchase from Superintendent of Documents, U.S. Government Printing Office, Washington, D.C.
6.
d'Angremond, K., de Jong, A. J., and de Waard, C. P. (1986). “Dredging of polluted sediment in the 1st petroleum harbor, Rotterdam.” Proc., Third United States/The Netherlands Meeting on Dredging and Related Technology, prepared for the U.S. Army Corps of Engineers Water Resources Support Center by the U.S. Army Engineer Waterways Experiment Station, Vicksburg, Miss.
7.
Dortch, M. S. (1989). “Methods for determining the long‐term fate of dredged material at aquatic disposal sites.” Technical Report, U.S. Army Engineer Waterways Experiment Station, Vicksburg, Miss. (in preparation).
8.
Edgar, C. E., and Engler, R. M. (1984). “An update on the London Dumping Convention and its application to dredged materials.” Proc., Dredging '84, ASCE, Clearwater Beach, Fla.
9.
Environmental Laboratory. (1987). “Disposal alternatives for PCB‐contaminated sediments from Indiana Harbor, Indiana; Vol. I: Main report.” Misc. Paper EL‐87‐9, U.S. Army Engineer Waterways Experiment Station, Vicksburg, Miss.
10.
Fredette, T. J., et al. “Guidelines for physical/biological monitoring of aquatic dredged material disposal sties.” Technical Report, U.S. Army Engineering Waterways Experiment Station, Vicksburg, Miss. (in preparation).
11.
Freeland, G. L., et al. (1983). “Sediment cap stability study of New York dredged material dump site.” Support Agreement No. NYD 80‐124CC, Atlantic Oceanographic and Meteorological Laboratory, National Oceanic and Atmospheric Administration, Miami, Fla.
12.
Gordon, R. (1974). “Dispersion of dredged spoil dumped in near‐shore waters.” Estuarine Coastal Marine Sci., 2, 348–358.
13.
JBF Scientific Corp. (1975). “Dredging technology study, San Francisco Bay and Estuary.” Report under Contract DACW 07‐75‐C‐0045, U.S. Army Engineer District, San Francisco, Calif.
14.
Johanson, E. E., Bowen, S. P., and Henry, G. (1976). “State‐of‐the‐art survey and evaluation of open‐water dredged material placement methodology.” Contract Report D‐76‐3, prepared by JBF Scientific Corporation for U.S. Army Engineer Waterways Experiment Station, Vicksburg, Miss.
15.
Johnson, B. H. (1989). “User's guide for dredged material disposal models for computing the short‐term physical fate at open‐water sites.” Instructional Report, U.S. Army Engineer Waterways Experiment Station, Vicksburg, Miss. (in preparation).
16.
Kikegawa, K. (1983). “Sand overlaying for bottom sediment improvement by sand spreader.” Management of bottom sediments containing toxic substances: Proc., 7th US/Japan Experts Meeting, prepared for the U.S. Army Corps of Engineers Water Resources Support Center by the U.S. Army Engineer Waterways Experiment Station, Vicksburg, Miss., 79–103.
17.
Mansky, J. M. (1984). “Underwater capping of contaminated dredged material in New York Bight apex,” Environment effects of dredging, Information Exchange Bulletin, Vol. D‐84‐4, 2‐5, U.S. Army Engineer Waterways Experiment Station, Vicksburg, Miss., 2–5.
18.
McLellan, T. N., and Truitt, C. L. (1986). “Demonstration of a submerged diffuser for dredged material disposal.” Proc., Conf. Oceans '86, MTS, Washington, D.C.
19.
Morton, R. W. (1987). “Recent studies concerning the capping of contaminated dredged material.” Management of bottom sediments containing toxic substances: Proc. 13th US/Japan Experts Meeting, Baltimore, Md.
20.
Morton, R. W., Parker, J. H., Richmond, W. H., eds. (1984). “Disposal area monitoring system: Summary of program results 1981–1984.” DAMOS Contribution #46, report by Science Applications International Corporation to U.S. Army Engineer Division, Waltham, Mass.
21.
Neal, R. W., Henry, G., and Greene, S. H. (1978). “Evaluation of the submerged discharge of dredged material slurry during pipeline dredge operations.” Technical Report D‐78‐44, by JBF Scientific Corp. for U.S. Army Engineer Waterways Experiment Station, Vicksburg, Miss.
22.
O'Connor, J. M., and O'Connor, S. G. (1983). “Evaluation of the 1980 capping operations at the experimental mud dump site, New York Bight apex.” Technical Report D83‐3, prepared by the New York University Medical Center, New York, N.Y., and Valley Ecosystems, Warwick, N.Y., for the U.S. Army Engineer Waterways Experiment Station, Vicksburg, Miss.
23.
Randall, R. E. (1989). “Synthesis of procedures for evaluating site capacity for openwater disposal of dredged material.” Miscellaneous Paper, U.S. Army Engineer Waterways Experiment Station, Vicksburg, Miss, (in preparation).
24.
Science Applications International Corp. (1988). “A summary of DAMOS physical monitoring of dredged material disposal activities.” Contribution #71, SAIC Ocean Science and Technology Division, Newport, R.I.
25.
Shields, F. D., and Montgomery, R. L. (1984). “Fundamentals of capping contaminated dredged material.” Proc., Conf. Dredging '84, ASCE, New York, N.Y., 446–460.
26.
Sumeri, A. (1984). “Capped in‐water disposal of contaminated dredged material.” Proc., Conf. Dredging '84, ASCE, New York, N.Y., 644–653.
27.
Suszkowski, D. J. (1983). “Studies on capping of contaminated dredged material by the New York District, Corps of Engineers.” Management of bottom sediments containing toxic substances: Proc., 7th US/Japan Experts Meeting, prepared for the U.S. Army Engineer Waterways Experiment Station, Vicksburg, Miss., 134—145.
28.
Tavolaro, J. F. (1984). “A sediment budget study of clamshell dredging and ocean disposal activities in the New York Bight.” Envir. Geol. Water Sci., 6(3), 133–140.
29.
Togashi, H. (1983). “Sand overlaying for sea bottom sediment improvement by conveyor barge.” Management of bottom sediments containing toxic substances: Proc., 7th US/Japan Experts Meeting, prepared for the U.S. Army Corps of Engineers Water Resources Support Center by the U.S. Army Engineer Waterways Experiment Station, Vicksburg, Miss., 59–78.
30.
Trawle, M. J., and Johnson, B. H. (1986). “Alcatraz disposal site investigations.” Miscellaneous Paper HL‐86‐1, U.S. Army Engineer Waterways Experiment Station, Vicksburg, Miss.
31.
Truitt, C. L. (1986a). “Fate of dredged material during open‐water disposal.” Environmental effects of dredging technical note EEDP‐01‐2, U.S. Army Engineer Waterways Experiment Station, Vicksburg, Miss.
32.
Truitt, C. L. (1986b). “The Duwamish Waterway capping demonstration project: Engineering analysis and results of physical monitoring.” Technical Report D‐86‐2, U.S. Army Engineer Waterways Experiment Station, Vicksburg, Miss.
33.
U.S. Army Corps of Engineers. (1984). General approach to designation studies for ocean dredged material disposal sites. Water Resources Support Center, Washington, D.C.
34.
Williams, D. T. (1983). “Tampa Bay dredged material disposal site analysis.” Miscallaneous Paper HL‐83‐8, U.S. Army Engineer Waterways Experiment Station, Vicksburg, Miss.

Information & Authors

Information

Published In

Go to Journal of Waterway, Port, Coastal, and Ocean Engineering
Journal of Waterway, Port, Coastal, and Ocean Engineering
Volume 115Issue 6November 1989
Pages: 741 - 759

History

Published online: Nov 1, 1989
Published in print: Nov 1989

Permissions

Request permissions for this article.

Authors

Affiliations

Clifford L. Truitt
Dir. Engrg. Services, Coastal Planning and Engrg., Inc., 1605 Main St., Sarasota, FL 33577
James E. Clausner, Members, ASCE
Hydr. Engr., U.S. Army Engr. Waterways Experiment Station, Vicksburg, MS 39180‐6199
T. Neil McLellan, Associate Member, ASCE
Hydr. Engr., U.S. Army Engr., Waterways Experiment Station, Vicksburg, MS

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share