Probability Distribution for Benefit/Cost Ratio and Net Benefit
Publication: Journal of Water Resources Planning and Management
Volume 118, Issue 2
Abstract
Benefit/cost ratio and net benefit are the two most commonly used criteria for evaluating the economic merit of public development projects. Due to the existence of uncertainty in cost and benefit estimations, the benefit/cost ratio and net benefit cannot be quantified with absolute certainty. In most probabilistic benefit/cost analysis the probability distributions of the benefit/cost ratio are chosen arbitrarily. The intent of this paper is to present the results from a numerical experiment in attempting to identify the appropriateness of various commonly used probability distributions in describing the random behavior of the benefit/cost ratio and net benefit of an economic development project.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Abramowitz, M., and Stegun, I. A., ed. (1972). Handbook of mathematical functions with formulas, graphs and mathematical tables. 9th Ed., Dover Publications, Inc., New York, N.Y.
2.
Benjamin, J. R., and Cornell, C. A. (1870). Probability, statistics, and decisions for civil engineers. McGraw‐Hill, Inc., New York, N.Y.
3.
Curtis, J. H. (1941). “On the distribution of the quotient of two chance variables.” Annals of Mathematical Statistics, 29, 563–578.
4.
Dandy, G. C. (1985). “An approximate method for the analysis of uncertainty in benefit‐cost ratios.” Water Resour. Res., 21(3), 267–271.
5.
Fisher, R. A., and Cornish, E. A. (1960). “The percentile points of distributions having known cumulants.” Technometrics, 2(2), 209–225.
6.
Goicoechea, A., Krouse, M. R., and Antle, L. G. (1982). “An approach to risk and uncertainty in benefit‐cost analysis of water resources projects.” Water Resour. Res., 18(4), 791–799.
7.
Hastings, N. A. J., and Peacock, J. B. (1974). Statistical distributions. John Wiley and Sons, Inc., New York, N.Y.
8.
Hayya, J., Armstrong, D., and Gressis, N. (1975). “Note on the ratio of two normally distributed variables.” Mgmt. Sci., 12(11), 1338–1341.
9.
Hillier, F. S., and Lieberman, G. J. (1986). Introduction to operations research, 4th Ed., Holden‐Day, Inc., San Francisco, Calif.
10.
Hinkley, D. V. (1969). “On the ratio of two correlated normal random variables.” Biometrika, 56(3), 635.
11.
Howe, C. W. (1971). “Benefit‐cost analysis for water system planning.” Water Resources Monograph Series, 2, American Geophysical Union, Washington, D.C.
12.
James, L. D., and Lee, R. R. (1971). Economics of water resources planning. McGraw‐Hill, New York, N.Y.
13.
Marsaglia, G. (1965). “Ratios of normal variables and ratios of sums of uniform variables.” Journal of American Statistical Association, 60(309), 193–204.
14.
Mercer, L. J., and Morgan, W. D. (1975). “Evaluation of a probability approach to uncertainty in benefit‐cost analysis.” Technical Report, Contribution No. 149, California Water Resource. Ctr., Univ. of California, Davis, Calif.
15.
Park, C. S. (1984). “Probabilistic benefit‐cost analysis.” Engrg. Economists, 29(2), 83–100.
16.
Patel, J. K., Kapadia, C. H., and Owen, D. B. (1976). Handbook of statistical distributions. John Wiley and Sons, Inc., New York, N.Y.
17.
Taha, H. A. (1987). Operations research: An introduction. 2nd Ed., MacMillan Publishing Co., Inc., New York, N.Y.
Information & Authors
Information
Published In
Copyright
Copyright © 1992 ASCE.
History
Published online: Mar 1, 1992
Published in print: Mar 1992
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.