A method is developed for evaluating a hydro‐system schedule for a large power system that has both hydro and thermal resources. The method computes thermal costs that accrue while meeting hourly generation requirements by hydro plants, a thermal system, and a pumped‐storage plant. The uncertainties associated with thermal‐unit operations are dealt with by considering the thermal system as a sum of independent random variables and then computing their expected generation levels. One pumped‐storage plant is modeled in detail, with complete chronological accounting of reservoir levels and corresponding pump/generation capabilities. The conventional hydro‐system minimizes the variation in the hydro‐reduced loads. Constraints on the permissible hour‐to‐hour variation in a thermal unit's generation are also satisfied. The method allocates all power resources so as to approximate their most economical operation while meeting a weekly sequence of hourly power demands. It is designed to rapidly evaluate hydro schedules in models that use a power objective function. An example of the method is given for a week's projected hourly demands.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Baleriaux, H. E. J., and de Guertechin, L. (1967) “Simulation de l'exploitation du'n pare de machines thermiques de production d'electricite couple a des stations de pumpage.” Revue E, ed. SRBE, 24, V(7), Brussells, Belgium, 3–23.
2.
Giles, J. E. (1985). “Chronological*hydropower representation.” Report No. WR28‐1‐500‐162, Tennessee Valley Authority, Norris, Tenn.
3.
Forsythe, G. E., Malcolm, M. A., and Moler, C. B. (1977). Computer methods for mathematical computations. Prentice‐Hall, Englewood Cliffs, N.J.
4.
“Evaluation of weekly hydropower benefits.” (1974). Report A‐6, Tennessee Valley Authority, Water Resource Management Methods, Knoxville, Tenn.
5.
Wunderlich, W. O. (1982). “Method for calculating hydro plant characteristics for a main river project (Chickamauga).” Report No. WR28‐2‐500‐145, Water Resource Management Methods, Tennessee Valley Authority, Norris, Tenn.
Information & Authors
Information
Published In
Copyright
Copyright © 1988 ASCE.
History
Published online: Sep 1, 1988
Published in print: Sep 1988
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.