Optimal Work Zone Lengths for Four-Lane Highways
Publication: Journal of Transportation Engineering
Volume 127, Issue 2
Abstract
Highway pavement maintenance is very expensive not only in terms of costs to the responsible agencies but also in terms of disruptive delays to users. Construction and maintenance activities on four-lane highways (with two lanes in each direction) often require the closure of one of the two travel lanes. Longer work zones tend to increase the user delay costs. Maintenance work can be performed more efficiently, i.e., with fewer repeated setups, in longer zones. A relatively simple mathematical model is developed to optimize work zone lengths on four-lane highways where one lane in one direction at a time is closed. The objective is to minimize the total cost, including the agency cost, the accident cost, and the user delay cost. The optimized variable (e.g., work zone length) and the sensitivity results generated from a numerical example are presented in this study. With user-specified input parameters, this model can be used to optimize work zones on four-lane highways for a wide variety of circumstances.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Cassidy, M. J., and Han, L. D. ( 1992). “Predicting vehicle delays and queue lengths on two-lane highways during maintenance activity.” Proc., TRB 71st Ann. Mtg., Transportation Research Board, Washington, D.C.
2.
Dudek, C. L., and Richard, S. H. ( 1982). “Traffic capacity through urban freeway work zones in Texas.” Transp. Res. Rec. 869, Transportation Research Board, Washington, D.C., 14–18.
3.
Dudek, C. L., Richard, S. H., and Buffington, J. L. ( 1986). “Some effects of traffic control on four-lane divided highways.” Transp. Res. Rec. 1086, Transportation Research Board, Washington, D.C., 20–30.
4.
Janson, B. N., Anderson, R. B., and Cummings, A. ( 1987). “Mitigating corridor travel impacts during reconstruction: An overview of literature, experiences, and current research.” Transp. Res. Rec. 1132, Transportation Research Board, Washington, D.C., 34–41.
5.
Krammes, R. A., and Lopez, G. O. ( 1994). “Updated capacity values for short-term freeway work zone lane closures.” Proc., TRB 73rd Ann. Mtg., Transportation Research Board, Washington, D.C.
6.
Martinelli, D. R., and Xu, D. (1996). “Delay estimation and optimal length for four-lane divided freeway workzones.”J. Transp. Engrg., ASCE, 122(2), 114–122.
7.
McCoy, P. T., Pang, M., and Post, E. R. ( 1980). “Optimum length of two-lane two-way no-passing traffic operation in construction and maintenance zones on rural four-lane divided highways.” Transp. Res. Rec. 773, Transportation Research Board, Washington, D.C., 20–24.
8.
McCoy, P. T., and Peterson, D. J. ( 1987). “Safety effects of two-lane two-way segment length through work zones on normally four-lane divided highways.” Transp. Res. Rec. 1163, Transportation Research Board, Washington, D.C., 15–21.
9.
Memmott, J. L., and Dudek, C. L. ( 1984). “Queue and cost evaluation of work zones (QUEWZ).” Transp. Res. Rec. 979, Transportation Research Board, Washington, D.C., 12–19.
10.
Pain, R. F., McGee, H. W., and Knapp, B. G. ( 1981). “Evaluation of traffic control for highway work zones.” NCHRP Rep. 236, Transportation Research Board, Washington, D.C.
11.
Pigman, J. G., and Agent, K. R. ( 1990). “Highway accidents in construction and maintenance work zones.” Transp. Res. Rec. 1270, Transportation Research Board, Washington, D.C., 12–21.
12.
Richard, S. H., and Dudek, C. L. ( 1986). “Implementation of work-zone speed control measures.” Transp. Res. Rec. 1086, Transportation Research Board, Washington, D.C., 36–42.
13.
Rouphail, N. M., and Tiwari, G. ( 1985). “Flow characteristics at freeway lane closures.” Transp. Res. Rec. 1035, Transportation Research Board, Washington, D.C., 50–58.
14.
Rouphail, N. M., Yang, Z. S., and Fazio, J. ( 1988). “Comparative study of short and long term urban freeway work zones.” Transp. Res. Rec. 1163, Transportation Research Board, Washington, D.C., 4–14.
15.
Schonfeld, P. M., and Chien, I. J. (1999). “Optimal work zone lengths for two-lane highways.”J. Transp. Engrg., ASCE, 125(1), 21–29.
16.
Underwood, C. ( 1994). “Time to re-cast the 1994/5 structure maintenance programme.” Hwy. and Transp., 14–15.
17.
Zhou, G.-C. ( 1996). “Combined costs of vehicle user and maintenance operation in four-lane divided highways by simulation analysis.” Transp. Studies Ctr. Scholarly Paper, Civil Engineering Dept., University of Maryland, College Park, Md.
Information & Authors
Information
Published In
History
Received: May 21, 1998
Published online: Apr 1, 2001
Published in print: Apr 2001
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.