Delay Estimation and Optimal Length for Four-Lane Divided Freeway Workzones
Publication: Journal of Transportation Engineering
Volume 122, Issue 2
Abstract
Vehicle delay is one of the most serious impacts of highway workzones on existing traffic operations. The present study provides a comprehensive and detailed estimation of traffic delay due to a freeway workzone where the roadway in one direction is closed and the traffic usually on the closed roadway is diverted to share the roadway in the opposite direction. The total delay was decomposed into speed reduction delay and congestion delay. Different procedures were developed to estimate speed reduction delay for several roadway conditions. A mathematical model was developed to find the length of the queue upstream of a workzone and a procedure was generated to estimate daily congestion delay under any given condition. Alternative roadway closure patterns along the length of a given project were evaluated in terms of traffic control cost and additional road user costs. The optimal workzone length for a given project was studied. Procedures were developed to determine the optimal workzone length.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Dudek, C. L., Richards, S. H., and Buffington, J. L. (1986). “Some effects of traffic control on four-lane divided highways.”Transp. Res. Rec. 1086, 20–30.
2.
Hillier, F. S., and Lieberman. (1991). Introduction to stochastic models in operations research . McGraw-Hill, New York, N.Y.
3.
Janson, B. N., Anderson, R. B., and Cummings, A. (1987). “Mitigating corridor travel impacts during reconstruction: an overview of literature, experiences, and current research.”Transp. Res. Rec. 1132, 34–41.
4.
May, A. D. (1990). Traffic flow fundamentals. Prentice Hall, Inc., Englewood Cliffs, N.J., 464.
5.
McCoy, P. T., Pang, L. M., and Post, E. R. (1980). “Optimum length of two-lane two-way no-passing traffic operation in construction and maintenance zones on rural four-lane divided highways.”Transp. Res. Rec. 773, 15–19.
6.
Means Building Construction Cost Data. (1993). 51st Annu. Ed., R. S. Means Company, Inc., Kingston, Mass.
7.
Transportation Research Board. (1985). Highway capacity manual ; TRB Special Rep. 209, Washington, D.C.
8.
U.S. Department of Transportation. (1987). Transportation safety information report—1987 annual summary . Res. and Spec. Program Admin., Washington, D.C., 1–26.
Information & Authors
Information
Published In
Copyright
Copyright © 1996 American Society of Civil Engineers.
History
Published online: Mar 1, 1996
Published in print: Mar 1996
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.