TECHNICAL PAPERS
Mar 1, 1996

Alternative Strategies for Temporary Support during Structural Repair of Reinforced-Concrete Beams

Publication: Journal of Structural Engineering
Volume 122, Issue 3

Abstract

Repairs to reinforced concrete beams suffering from chloride-induced corrosion necessitate breaking out concrete around reinforcement. Reinforcement and concrete cannot act compositely where bars are exposed, and the pattern of strains in a beam under load is altered. The present study evaluates postrepair structural performance of reinforced-concrete beams repaired when relieved of load and when repaired under load and using a variety of alternative approaches to maintain structural stability during repair operations. Two series of four or five beams each were loaded and subjected to simulated repair in the laboratory. A reference “as-new” beam was also tested in each series for comparison. The ultimate strength of beams repaired under load was not reduced in comparison with “as-new” companion specimens, although ductility, deflection, crack widths, and flexural stiffness were all affected. However, results do not suggest significant benefits in postrepair performance will be obtained through relieving a structure of load or from application of temporary longitudinal prestress while repairs are carried out. For beams repaired under load, two stage repairs (in which only half the reinforcement at a section is exposed at any one time) offered little overall improvement over single-stage repairs in which all bars were exposed simultaneously.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
“Building code requirements for reinforced concrete.” (1988). ACI 318, American Concrete Institute (ACI), Detroit, Mich.
2.
Cairns, J. (1993a). “Relief of load during structural repairs to reinforced concrete beams.”Struct. Engrg. Rev., 5(3), 199–208, London, UK.
3.
Cairns, J. (1993b). “Load relief during structural repairs to reinforced concrete beams.”Proc., Inst. of Civ. Engrs., Vol. 99, Nov. 1993, Thomas Telford, Ltd., London, UK, 417–427.
4.
Cairns, J. (1995). “Strength in shear of concrete beams with exposed reinforcement.”Proc., Inst. of Civ. Engrs. Struct. & Build., Thomas Telford, Ltd., Vol. 110, May 1995, London, UK, 176–185.
5.
Cairns, J., and Rafeeqi, S. F. A. (1994). “External reinforcement for strengthening of concrete structures.”Proc., Conf. on Gestion des ouvrages d'art, Presses Ponts et Chaussees, Paris, France.
6.
Cairns, J., and Zhao, Z. (1993). “Structural behaviour of concrete beams with reinforcement exposed.”Proc., Inst. of Civ. Engrs.: Struct. & Build., Vol. 99, London, UK, 141–154
7.
Campbell-Allen, D., and Roper, H. (1991). Concrete structures: materials, maintenance and repair . Longman's, London, UK.
8.
“Crosshead repairs promise M4 chaos.” (1991). New Civil Engineer, 18 July, Thomas Telford, Ltd., London, UK.
9.
Department of Transport. (1988). “Repair and maintenance of the Midland Links viaducts.”Dept. of Transp. Working Party Rep., Birmingham, UK.
10.
Eyre, J. R., and Nokhasteh, M.-A. (1992). “Strength assessment of corrosion damaged reinforced-concrete slabs and beams.”Proc., Inst. of Civ. Engrs. Struct. & Build., Vol. 94, Thomas Telford, Ltd., London, UK, 197–203.
11.
Kay, E. A. (1989). “Concrete society working part on concrete repair.”Proc., 3rd Int. Conf. on Deterioration & Repair of Reinforced Concrete in the Arabian Gulf, Bahrain Society of Engineers, Manama, Bahrain.
12.
Morita, S., and Fuji, S. (1982). “Bond capacity of deformed bars due to splitting of surrounding concrete.”Bond in Concrete, P. Bartos, ed., Applied Science Publishers, London, UK, 331–341.
13.
Pullar-Strecker, P. (1987). Corrosion damaged concrete: assessment and repair . CIRIA/Butterworth's, London, UK.
14.
Schiessel, P. (1982). “Interaction between anchorage of bond, hooks and welded transverse bars; basis for the design in the German code DIN 1045 and CED-FIP model code.”Bond in Concrete, P. Bartos ed., Applied Science Publishers, London, UK, 424–433.
15.
“Structural use of concrete.” (1985). BS 8110, British Standards Institution, London, UK.
16.
Swamy, R. N., Andriopoulos, A., and Adepegaba, D.(1970). “Arch action and bond in concrete shear failures.”Proc., ASCE, J. Struct. Div., 96(6), 1069–1091.
17.
“Testing concrete; part 105, method for determination of flow.” (1984). BS 1881, British Standards Institution, London, UK.

Information & Authors

Information

Published In

Go to Journal of Structural Engineering
Journal of Structural Engineering
Volume 122Issue 3March 1996
Pages: 238 - 246

History

Published online: Mar 1, 1996
Published in print: Mar 1996

Permissions

Request permissions for this article.

Authors

Affiliations

John Cairns
Sr. Lect., Dept. of Civ. and Offshore Engrg., Heriot-Watt Univ., Edinburgh, EH14 4AS, UK.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share