New Method for Meander-Loop Cutoffs
Publication: Journal of Hydraulic Engineering
Volume 128, Issue 3
Abstract
When a reach of a meandering river becomes very sinuous, and thereby causes significant problems for navigation and flood discharge, cutoff works in the narrow-neck portion of the river bend may be carried out. It is common practice to excavate a small slightly bending cutoff channel, referred to as pilot channel, which is gradually scoured and enlarged toward the concave bank by the river flow. In the design of the Wujiadu cutoff in the Caoe River (already constructed in 1998), the authors proposed a new method for constructing meander-loop cutoffs. Using this technique, the new cutoff channel on the concave bank side and the flood protection embankments are formed during construction, allowing the nonprotected convex bank and the bed of the new cutoff channel to be scoured and be enlarged by flood. Thus, the amount of excavation of the cutoff works can be significantly reduced and the construction period can be largely shortened. In this way, the lines of the new cutoff channel may be unified with the overall river alignment. This paper presents the design philosophy and major points of the method for meander-loop cutoffs.
Get full access to this article
View all available purchase options and get full access to this article.
References
Ferguson, H. B. (1940). History of improvement of the low Mississippi river for flood control and navigation, Mississippi River Commission, M.R.C. print 500.1–40.
Hu, B., Pan, Q. X., and Liang, Z. X. (1978). “Experimental conclusion of new cutoff channel shore protection for Xiajingjiang Zhongzhouzhi cutoff works.” Selected works of shore protection experiment for middle and lower reach of Yangtze River, Science, China (in Chinese).
Pan, Q. X., Yuan, J. D., Zeng, J. X., and Liang, Z. X. (1978). “Project conclusion of Xiajingjiang cutoff works,” Renmin Changjiang (1), China (in Chinese).
Pinkard, C. F., Jr. (1987). “Red River pilot channel design and development,” Proc., National Conference on Hydraulic Engineering, ASCE.
Pinkard, C. F., Jr. (1995). “Red River waterway project: General design,” Proc., First International Conference Sponsored by the Water Resources Engineering Division, ASCE.
Tuttle, J. R., and Pinner, W. (1982). “Analysis of major parameters affecting the behavior of the Mississippi river,” Potamology Rep. No. 4, Corps of Engineers, Lower Mississippi Valley Division.
Xie, J. H., Ding, J. S., and Wang, Y. H. (1990). Evolution and regulation of river course, Water Resources and Electric Power, China (in Chinese).
Xiong, S. L., Chen, S. M., Wang, W. J., Zhou, F. W., Qiu, X. H., Chen, L., and Sun, Q. Y.(1997). “Basically formed method for river cutoff design,” J. Hydraul. Eng., (9) Beijing, China (in Chinese).
Xiong, S. L., and Qiu, X. H. (1995). Preliminary design of Wujiadu cutoff works in the Caoe River, Investigation and Design Institute of Qiantang River Administration, Investigation and Design Institute of Hydraulic Engineering of Shangyu City, Zhejiang Province, China (in Chinese).
Information & Authors
Information
Published In
Copyright
Copyright © 2002 American Society of Civil Engineers.
History
Received: Apr 15, 1998
Accepted: Oct 17, 2001
Published online: Mar 1, 2002
Published in print: Mar 2002
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.