Field Performance of Structural Slurry Wall
Publication: Journal of Geotechnical Engineering
Volume 115, Issue 2
Abstract
Geotechnical instrumentation for both routine monitoring and research was conducted during construction of the new Harvard Square Station, part of expansion of a rapid transit line in metropolitan Boston. The cut‐and‐cover structure was designed with slurry walls (cast‐in‐place concrete diaphragm walls) that were used both for initial excavation support and as final structural walls. The purpose of the study was to develop a better understanding of slurry walls systems that will benefit future design and construction of slurry walls as permanent structures. In conjunction with analytical studies, the field measurements provided better understanding of slurry wall behavior both during construction and the long term. The field measurements summarized in this report focused on lateral movements, bending in the wall as measured by strain gauges, and settlement of the wall and adjacent structures. Field measurements showed movements to be small, and bending in the stiff wall to be less than design values. Design recommendations are given.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Abbott, E. L., Hansmire, W. H., and Rawnsley, R. P. (1985). “Slurry walls protect Harvard Square.” Civ. Engrg., ASCE, Dec., 44–47.
2.
Adams, M., Azzouz, A. S., and Einstein, H. H. (1984). “Evaluation of slurry wall construction and design, vol. 2, Case studies and application of finite element method.” Report No. FHWA/RD‐84/054, U.S. Department of Transportation, Federal Highway Administration.
3.
Azzouz, A. S., and Einstein, H. H. (1984). “Evaluation of slurry wall construction and design, vol. 4. Slurry trench stability.” Report No. FHWA/RD‐84/056, U.S. Department of Transporation, Federal Highway Administration.
4.
Goldberg, D. T., Jaworski, W. E., and Gordon, M. D. (1976). “Lateral support systems and underpinning.” FHWA‐RD‐75‐128, ‐129, ‐130, and ‐131, U.S. Department of Transportation, Federal Highway Administration.
5.
Hansmire, W. H., and Einstein, H. H. (1984). “Instrumentation and evaluation of slurry wall construction and design. Executive summary.” Report No. FHWA/RD‐84/052, U.S. Department of Transportation, Federal Highway Administration.
6.
Hansmire, W. H., et al. (1984). “Instrumentation and evaluation of slurry wall construction, vol. I. Interpretation of field measurements.” Report No. FHWA/RD‐84‐053, U.S. Department of Transportation, Federal Highway Administration.
7.
Hansmire, W. H., and Rawnsley, R. P. (1988). “Long‐term tieback monitoring at Harvard Square.” J. Geotech. Engrg., ASCE, 114(3), 344–348.
8.
Rawnsley, R. P., Russell, H. A., and Hansmire, W. H. (1985). “Instrumentation reliability at Harvard Square Station.” Transp. Res. Rec., No. 1004, 27–34.
9.
Schultz, M. S., Einstein, H. H., and Azzouz, A. S. (1984). “Evaluation of slurry wall construction and design, vol. 3. Empirical investigations of the behavior of diaphragm walls.” Report No. FHWA/RD‐84/055, U.S. Department of Transportation, Federal Highway Administration.
Information & Authors
Information
Published In
Copyright
Copyright © 1989 ASCE.
History
Published online: Feb 1, 1989
Published in print: Feb 1989
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.