Hydropower Planning in Developing Countries
Publication: Journal of Energy Engineering
Volume 114, Issue 1
Abstract
The 1960's and 1970's saw the development in the U.S. and Europe of a number of useful mathematical planning tools for electric power systems. Utilization of these tools in practical application, however, appears more significant in some of the developing countries than in the industrialized countries where they originated. It is not uncommon to find electric power utilities in third world countries that are using and indeed developing state of the art planning techniques in long‐range generation planning. This is particularly so for systems with large amounts of existing and/or potential hydroelectric power. Despite the approximations that are necessary, these techniques furnish planners and decision makers with valuable insights on the range of possible long‐term consequences of near‐term decisions. This paper highlights several computer models that have been found useful in long‐range planning in nations with high hydro potential.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Bellman, R. (1957). Dynamic programming. Princeton University Press, Princeton, N.J.
2.
Consorcio IECO‐Lahmeyer. (1981). Plan maestro do desarrollo electrico, 1977–2000 Nicaragua. Instituto Nicaraguense de Energia, Managua, Nicaragua.
3.
Covarrubias, A. J., Heindrich, P., and Molina, P. E. (1981). “Development of the WASP‐III computer program at the International Atomic Energy Agency. Proc., on Electric Generation System Analysis, Mechanical Engineering Department of Ohio State University, March.
4.
Fahlbusch, F. E., and Drabik. (1978). PESO‐power system expansion by seasonal optimization. Lahmeyer International, Gmbh, Frankfurt, West Germany.
5.
Grimstud, G. P., et al. (1980). Assessment of system models for hydro project evaluation. Systems Control, Inc., Palo Alto, Calif.
6.
Jenkins, R. T., and Joy, D. S. (1974). “Wein automatic system planning package (WASP)—An electric utility optimal generation expansion planning computer code.” ORNL‐4945, Oak Ridge National Lab., Oak Ridge, Tenn., July.
7.
Jenkins, R. (1982). TARANTULA, Version 0.0: Methods used and features available in the first implementation. Tennessee Valley Authority, Chattanooga, Tenn.
8.
Kerr, J. A. (1982). “Key features of IECO water and energy computer package IPA.” Technical Note No. 9, Planning Department, Int. Engrg. Co., Inc., San Francisco, Calif.
9.
Larson, R. T. (1968). State increment dynamic programming. Elsevier Publishing Company, New York, N.Y.
10.
Matsumoto, J., and Mays, L. W. (1982). “Development of models for the planning of large‐scale water energy systems.” Proc., Water and Energy Tech. and Policy Issues, ASCE Hydraulic Division Specialty Conference, June.
11.
Morariu, S. (1981, 1982). “Computer‐aided evaluation of Peru's hydropower.”
12.
Nakamura, S., et al. (1981). “CERES: Capacity expansion and reliability evaluation system.” The National Regulatory Research Institute, Columbus, Ohio, 43210, Nov.
13.
Turvey, R., and Anderson, D. (1977). Electricity economics essays and case studies. World Bank, Johns Hopkins Press, Baltimore, Md.
Information & Authors
Information
Published In
Copyright
Copyright © 1988 ASCE.
History
Published online: Apr 1, 1988
Published in print: Apr 1988
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.