Predicting Release of PCBs at Point of Dredging
Publication: Journal of Environmental Engineering
Volume 119, Issue 1
Abstract
A simple laboratory test, referred to here as the dredging elutriate test (DRET), was sought to predict the concentration of contaminants in the water column at the point of dredging. The DRET is procedurally similar to the modified elutriate test developed by the U.S. Army Corps of Engineers to predict concentrations of contaminants at the point of disposal of dredge material. The objective of experimentation was to investigate the release of dissolved and suspended polychlorinated biphenyls (PCBs) as a function of initial concentration of sediment, aeration time, and settling time in the DRET. Settling time was found most important. Field data from a pilot dredging project in New Bedford Harbor, Mass. compared well to results of the DRET. Most of the PCB in the field and DRET were sorbed to small particles rather than dissolved. A good correlation was obtained between total PCB and total suspended solids. A sorption equilibrium model based on available partition coefficients described the sorbed‐dissolved PCB distribution. Particle size distribution analysis showed that the mean diameter was less than 10 μm after just 0.5 h of settling and decreased very little with further settling. These particles and their PCB burden have the potential to be transported away from a dredging site.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Burkhard, L. P. (1987). “Determination of polychlorinated biphenyls using multiple regression with outlier detection and elimination.” Anal. Chem., 59(8), 1187–1190.
2.
Coates, J. T., and Elzerman, A. W. (1986). “Desorption kinetics for selected PCB congeners from river sediments.” J. Contam. Hydro., 1(1/2), 191–210.
3.
DiGiano, F. A., Miller, C. T., and Yoon, J. (1990). Development of an elutriate test to predict release of contaminants from sediment resuspended material at the point of dredging. Waterways Experiment Station, Corps of Engineers, Vicksburg, Miss.
4.
Erickson, M. D. (1986). Analytical chemistry of PCB. Butterworth Publishers, Boston, Mass.
5.
Hayes, D. F. (1987). “Guide to selecting a dredge for minimizing resuspension of sediment.” Envir. Effects of Dredging Tech. Notes, EEDP‐09‐1, Waterways Experiment Station, Corps of Engineers, Vicksburg, Miss.
6.
Jones, R. A., and Lee, G. F. (1978). Evaluation of the elutriate test as a method of predicting contaminant release during open‐water disposal of dredged sediments and environmental impact of open‐water dredged material disposal. Waterways Experiment Station, Corps of Engineers, Vicksburg, Miss.
7.
Karickhoff, S. W., Brown, D. S., and Scott, T. A. (1979). “Sorption of hydrophobic pollutants in sediment suspensions.” Water Res., 13(3), 241–248.
8.
Lal, D. (1977). “The oceanic microcosm of particles.” Science, 198(4231), 997–1009.
9.
Lawler, D. F., O'Melia, C. R., and Tobiason, J. E. (1980). “Use of particle size integral water treatment plant design from particle size to plant performance.” ACS Advances in Chem. Ser., 189, 353–388.
10.
Lee, G. F., Richardson, J. S., Piwoni, M. D., Homer, D. H., Lopez, J. M., Saleh, F., and Mariani, G. M. (1975). “Research study for the development of dredged material disposal criteria.” Contract Rep. D‐75‐4, Waterways Experiment Station, Corps of Engineers, Vicksburg, Miss.
11.
Ludwig, D. D., Sherrard, J. H., and Amende, R. A. (1989). “Evaluation of the standard elutriate test as an estimator of contaminant release at dredging sites.” J. Water Pollution Control Fed., 61(11/12), 1666–1672.
12.
Miller, C. T., and Weber, W. J., Jr. (1988). “Modeling the sorption of hydrophobic compounds by aquifer materials—II. Column reactors studies.” Water Res., 22(4), 465–474.
13.
Onuska, F. I., Kominar, R. J., and Terry, K. A. (1983). “Identification and determination of polychlorinated biphenyl by high resolution gas chromatography.” J. Chromatogr., 279, 111–118.
14.
Palermo, M. R., and Thackston, E. L. (1988a). “Flocculent settling above zone settling interface.” J. Envir. Engrg., ASCE, 114(4), 770–783.
15.
Palermo, M. R., and Thackston, E. L. (1988b). “Test for dredged material effluent quality.” J. Envir. Engrg., ASCE, 114(6), 1295–1309.
16.
Palermo, M. R., and Thackston, E. L. (1988c). “Verification of predictions of dredged material effluent quality.” J. Envir. Engrg., ASCE, 114(6), 1310–1330.
17.
Stumm, W., and Morgan, J. J. (1981). Aquatic chemistry: Introduction emphasizing in natural waters. 2nd Ed., Wiley‐Interscience Publications, New York, N.Y.
18.
Weaver, G. (1983). “PCB contamination in and around New Bedford, Mass.” Envir. Sci. and Tech., 18(1), 20A–27A.
19.
Weber, W. J., Jr. (1972). Physicochemical processes for water quality control. Wiley Interscience Publication, New York, N.Y.
20.
Weber, W. J., Jr. and Miller, C. T. (1988). “Modeling the sorption of hydrophobic compounds by aquifer materials—I. Rates and equilibria.” Water Res., 22(4), 457–464.
Information & Authors
Information
Published In
Copyright
Copyright © 1993 American Society of Civil Engineers.
History
Received: Oct 1, 1991
Published online: Jan 1, 1993
Published in print: Jan 1993
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.