Why Contracts: Evidence
Publication: Journal of Construction Engineering and Management
Volume 135, Issue 8
Abstract
Contracts are a ubiquitous part of the architecture, engineering, and construction industry. Despite this, they are poorly understood by practitioners and academics. This paper empirically tests a conceptual model of the contract that seeks to improve our understanding of contracts. This model argues that the contract should be viewed as a managerial tool that provides the structure within which we accomplish the project tasks. The choice of the appropriate contract facilitates a process that allows the parties to achieve superior performance. The model views the contract as a multidimensional instrument that addresses three critical questions: (1) what is the structure of the organizational relationship between firms; (2) what is the disposition of risk and reward for involvement in the project; and (3) how will conflicts between firms be resolved? This paper empirically examines the first two dimensions. In order to address these distinct but intertwined questions, theories from Transaction Cost Economics and Agency Theory are brought to bear. The results of the study suggest that the conceptual model explains some of the variation in project performance, and therefore holds promise as a strategic management tool.
Get full access to this article
View all available purchase options and get full access to this article.
References
AGC. 2009. “Contracts and construction law.” ⟨http://www.agc.org/cs/contracts⟩.
AIA. 2009. “Contract documents.” ⟨http://www.aia.org/contractdocs/index.htm⟩.
Baiman, S. (1990). “Agency research in managerial accounting: A second look.” Account., Organ., Soc., 15(4), 341–371.
Baker, G. P. (1992). “Incentive contracts and performance measurement.” J. Polit. Econ., 100(3), 598–614.
Bassioni, H., Price, A., and Hassan, T. (2004). “Performance measurement in construction.” J. Manage. Eng., 20(2), 42–50.
Bower, D., and Merna, A. (2002). “Finding the optimal contractual arrangements for projects on process job sites.” J. Manage. Eng., 18(1), 17–20.
Cheng, E., Li, H., Drew, D., and Yeung, N. (2001). “Infrastructure of partnering for construction projects.” J. Manage. Eng., 17(4), 229–237.
Cohen, J. (1988). Statistical power analysis for the behavioral sciences, LEA, Hillsdale, N.J.
Diekman, J., and Girard, M. (1995). “Are contract disputes predictable.” J. Constr. Eng. Manage., 121(4), 355–363.
Eccles, R. G. (1981). “The quasi-firm in the construction industry.” J. Econ. Behav. Organ., 2, 335–357.
Eisenhardt, K. M. (1989). “Agency theory: An assessment and review.” Acad. Manage. Rev., 14(1), 57–74.
EJCDC. (2009). “Quality contract documents for successful projects.” ⟨http://content.asce.org/ejcdc/⟩.
Galloway, P. (2004). “Engineers laugh at lawyers and legal issues, but should they?” ASCE News, 29(7), 6–8.
Gordon, C. (1994). “Choosing appropriate construction contracting methods.” J. Constr. Eng. Manage., 120(1), 196–210.
Jensen, M., and Meckling, W. (1976). “Theory of the firm: Managerial behavior, agency costs and ownership structure.” J. Financ. Econ., 3, 305–360.
Judd, C., Smith, E., and Kidder, L. (1991). Research methods in social science, Holt, Rinehart, and Winston, Fort Worth, Tex.
Korde, T., Li, M., and Russell, A. (2005). “State-of-the-art review of construction performance models and factors.” Proc., Construction Research Conf., ASCE, 156–162.
Kumaraswamy, M. (2006). “Exploring the legal aspects of relational contracting.” J. Profl. Issues Eng. Educ. Pract., 132(1), 42–43.
Llewellyn, K. (1931). “What price contract? An essay in perspective.” Yale Law J., 40(5), 704–751.
Martin, D., and Songer, A. (2004). “Contracts versus covenants in integrated project delivery systems.” Constr. Inf. Q., 6(2), 51–55.
Masten, S. (1984). “The organization of production: Evidence from the aerospace industry.” J. Law Econom., 27, 403–417.
Neter, J., Wasserman, W., and Kutner, M. (1990). Applied linear statistical models, Irwin, Homewood, Ill.
Oyentunji, A., and Anderson, S. (2006). “Relative effectiveness of project delivery and contract strategies.” J. Constr. Eng. Manage., 132(1), 3–13.
Puddicombe, M. (1997). “Designers and contractors: Impediments to integration.” J. Constr. Eng. Manage., 123(3), 245–252.
Puddicombe, M. (2005). “Contracts: A holistic perspective.” Proc., Construction Research Conf., ASCE, 396–401.
Puddicombe, M. (2006). “The limitations of planning: The importance of learning.” J. Constr. Eng. Manage., 132(9), 949–955.
Williamson, O. E. (1979). “Transaction-cost economics: The governance of contractual relations.” J. Law Econom., 12, 233–261.
Williamson, O. E. (1985). The economic institutions of capitalism, Free Press, New York.
Williamson, O. E. (1991). “Comparative economic organization: The analysis of discrete structural alternatives.” Adm. Sci. Q., 36, 269–296.
Yin, R. (1989). Case study research: Design and methods, Sage Publications, Newbury Park, Calif.
Information & Authors
Information
Published In
Copyright
© 2009 ASCE.
History
Received: Oct 3, 2006
Accepted: Mar 30, 2009
Published online: Jul 15, 2009
Published in print: Aug 2009
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.