Latent Structures of the Factors Affecting Construction Labor Productivity
Publication: Journal of Construction Engineering and Management
Volume 135, Issue 5
Abstract
At any moment in time, a multitude of factors simultaneously impact construction productivity. Utilizing the knowledge of thousands of construction craft workers, the writers quantitatively analyzed the underlying structure of the factors affecting construction productivity and identified which factors the craft workers consider to be more relatively important as well. This research identified 83 factors affecting construction labor productivity through 18 focus groups with craft workers and their immediate supervisors on nine jobsites throughout the U.S. Next, a nationwide survey was administered to 1,996 craft workers to assess the impact of these factors on construction labor productivity. Principal factor analyses identified 10 latent factors to represent the underlying structure of 83 productivity factors. In addition, the relative importance of the factors’ impact on construction productivity was examined based on the crafts’ union status, trade, and position (craft worker versus foreman). The writers also compared their results to similar previous efforts, and more importantly, identified significant differences that may impact future productivity improvement strategies. This research will help industry and the research community better understand the factors affecting construction labor productivity and more effectively direct future efforts to improve its performance.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
Thanks are due to thousands of craft workers and foremen who participated in the focus group sessions and survey efforts. Without their input, this research would not have been possible. The financial support of the Construction Industry Institute and input from its member companies is also gratefully acknowledged.
References
Borcherding, J., and Garner, D. (1981). “Work force motivation and productivity on large jobs.” J. Constr. Div., 107(3), 443–453.
Borcherding, J., and Oglesby, C. (1974). “Construction productivity and job satisfaction.” J. Constr. Div., 100(3), 413–431.
Borcherding, J., Sebastian, S., and Samelson, N. (1980). “Improving motivation and productivity on large projects.” J. Constr. Div., 106(1), 73–89.
Business Roundtable (BRT). (1980). “Scheduled overtime effect on construction projects.” Construction Industry Cost Effectiveness Task Force Rep. No. C-2, Business Roundtable, New York.
Dai, J., Goodrum, P. M., Maloney, W. F., and Sayers, C. (2005). “Analysis of focus group data regarding construction craft workers’ perspective of the factors affecting their productivity.” 2005 Construction Research Congress, ASCE, San Diego.
Diekmann, J., and Heinz, J. (2001). “Determinants of jobsite productivity.” Construction Industry Institute Research Rep. No. 143–11, Univ. of Texas at Austin.
Economist. (2007). “Atomic renaissance.” Economist Magazine, Sept. 6.
Halligan, D., Demsetz, L., and Brown, J. (1994). “Action-response model and loss of productivity in construction.” J. Constr. Eng. Manage., 120(1), 47–64.
Hanna, A. S., Russell, J. S., Gotzion, T. W., and Nordheim, E. V. (1999). “Impact of change orders on labor efficiency for mechanical construction.” J. Constr. Eng. Manage., 125(3), 176–184.
Herbsman, Z., and Ellis, R. (1990). “Research of factors influencing construction productivity.” Constr. Manage. Econom., 8(1), 49–61.
Horman, M. J., and Thomas, H. R. (2005). “Role of inventory buffers in construction labor performance.” J. Constr. Eng. Manage., 131(7), 834–843.
Kellogg, J., Howell, G., and Taylor, D. (1981). “Hierarchy model of construction productivity.” J. Constr. Div., 107(1), 137–152.
Liberda, M., Ruwanpura, J., and Jergeas, G. (2003). “Construction productivity improvement: A study of human, management and external issues.” 2003 Construction Research Congress, ASCE, Reston, Va.
Loehlin, J. D. (1998). Latent variable models: An introduction to factor, path, structural analysis, 3rd Ed., Lawrence Erlbaum Associates, Mahwah, N.J.
Maloney, W. F. (1981). “Motivation in construction: A review.” J. Constr. Div., 101(4), 641–647.
Maloney, W. F. (1983). “Productivity improvement: The influence of labour.” J. Constr. Eng. Manage., 109(3), 321–334.
Maloney, W. F., and McFillen, J. O. (1987). “Motivational impact of work crews.” J. Constr. Eng. Manage., 113(2), 208–221.
Oglesby, C., Parker, H., and Howell, G. (1989). Productivity improvement in construction, McGraw-Hill, New York.
Olomolaiye, P. O., Jayawardane, A. K. W., and Harris, F. C. (1998). Construction productivity management, Addison Wesley Longman, U.K.
Olson, R. C. (1982). “Planning, scheduling, and communicating effects on crew productivity.” J. Constr. Div., 108(1), 121–127.
Rojas, M., and Aramvareekul, P. (2003). “Labor productivity drivers and opportunities in the construction industry.” J. Constr. Eng. Manage., 129(2), 78–82.
Sanvido, V. (1988). “Conceptual construction process model.” J. Constr. Eng. Manage., 114(2), 294–310.
Thomas, H. R., Maloney, W. F., Horner, R. M. W., Smith, G. R., Handa, V. K., and Sanders, S. R. (1990). “Modeling construction labor productivity.” J. Constr. Eng. Manage., 116(4), 705–726.
Thomas, H. R., and Napolitan, C. (1995). “Quantitative effects of construction changes on labor productivity.” J. Constr. Eng. Manage., 121(3), 290–296.
Thomas, H. R., and Raynar, K. A. (1997). “Scheduled overtime and labor productivity: A quantitative analysis.” J. Constr. Eng. Manage., 123(2), 181–188.
Thomas, H. R., Riley, D., and Sanvido, V. (1999). “Loss of labor productivity due to delivery methods and weather.” J. Constr. Eng. Manage., 125(1), 39–46.
Thomas, H. R., and Sakarcan, A. (1994). “Forecasting labor productivity using factor model.” J. Constr. Eng. Manage., 120(1), 228–239.
Thomas, H. R., and Sanvido, V. (2000). “Role of the fabricator in labor productivity.” J. Constr. Eng. Manage., 126(5), 358–365.
Thomas, H. R., Sanvido, V., and Sanders, S. (1989). “Impact of material management on productivity—A case study.” J. Constr. Eng. Manage., 115(3), 370–384.
United Nations Committee on Housing, Building, and Planning (United Nations). (1965). Effect of repetition on building operations and processes on site, United Nations, New York.
Information & Authors
Information
Published In
Copyright
© 2009 ASCE.
History
Received: Jun 5, 2007
Accepted: Oct 28, 2008
Published online: May 1, 2009
Published in print: May 2009
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.