Effect of Delivery Methods on Design Performance in Multifamily Housing Projects

Publication: Journal of Construction Engineering and Management
Volume 134, Issue 7

Abstract

Existing studies on the performance evaluation by the delivery method generally indicate that the design build (DB) method is superior to the design-bid-build (DBB) method in terms of construction duration, cost, and quality. As opposed to the performance of construction duration and cost, where quantitative evaluation is relatively possible, most performance evaluations of quality are based on interviews with the owners. Therefore, this paper aimed at evaluating the level of design performance to conduct a quantitative evaluation on the performance of quality. To achieve this goal, this paper analyzed the impact of delivery methods on design performance in terms of the quantitative evaluation based on the case studies analyzing construction drawings and specifications of public multifamily housing projects delivered through the DB and DBB methods since 2000. The Delphi and analytic hierarchy process methods were used to develop objective standards and contents for evaluating the design performance. An analysis of variance test was conducted to analyze which delivery methods would have an effect on the design performance. Construction industry practitioners can use the results of this study in selecting a delivery method appropriate to the project characteristics.

Get full access to this article

View all available purchase options and get full access to this article.

References

Bennett, J., Pothecary, E., and Robinson, G. (1996). Design and building a world class industry: Reading design-build forum, Center for Strategic Studies in Construction, Univ. of Reading, Reading, U.K.
Chan, A. P. C., Scott, D., and Lam, E. W. M. (2002). “Framework of success criteria for design/build projects.” J. Manage. Eng., 18(3), 120–128.
Chan, A. P. C., Yung, E. H. K., Lam, P. T. I., Tam, C. M., and Cheung, S. O. (2001). “Application of Delphi method in selection of procurement systems for construction projects.” Constr. Manage. Econom., 19(7), 699–718.
Debella, D. C., and Ries, R. (2006). “Construction delivery systems: A comparative analysis of their performance within school districts.” J. Constr. Eng. Manage., 132(11), 1131–1138.
Dell’losa, A. J., and Kirk, S. J. (2003). Life cycle costing for facilities, RSMeams, Kingston.
Goldstein, N. (1975). “A Delphi on the future of the steel and ferroalloy industries.” In the Delphi techniques and applications, Addison Wesley, Reading, Mass., 210–226.
Goodrum, P. M., and Haas, C. T. (2002). “Partial factor productivity and equipment technology change at activity level in U.S. construction industry.” J. Constr. Eng. Manage., 128(6), 463–472.
Irizarry, J., Simonsen, K. L., and Abraham, D. M. (2005). “Effect of safety and environmental variables on task durations in steel erection.” J. Constr. Eng. Manage., 131(12), 1310–1319.
Khasnabis, S., Alsaidi, E., Liu, L., and Ellis, R. D. (2002). “Comparative study of two techniques of transit performance assessment: AHP and GAT.” J. Transp. Eng., 128(6), 499–508.
Konchar, M., and Sanvido, V. (1998). “Comparison of U.S. project delivery systems.” J. Constr. Eng. Manage., 124(6), 435–444.
McCabe, B., AbouRizk, S., and Gavin, J. (1999). “Sample size analysis for asphalt pavement quality control.” J. Infrastruct. Syst., 5(4), 118–123.
McCabe, B., AbouRizk, S., and Gavin, J. (2002). “Time of sampling strategies for asphalt pavement quality assurance.” J. Constr. Eng. Manage., 128(1), 85–89.
Ministry of Construction and Transportation (MOCT). (2006). “A research for evaluating the performance of design-build delivery method.” R&D/05 0A16-01, South Korea.
Robinson, J. B. L. (1991). “Delphi technology for economic impact assessment.” J. Transp. Eng., 117(3), 531–549.
Satty, T. L. (1980). The analytic hierarchy process, McGraw-Hill, London.
Satty, T. L. (1990). “How to make a decision: The analytical hierarchy process.” Eur. J. Oper. Res., 48, 9–26.
Shapira, A., and Goldenberg, M. (2005). “AHP-Based equipment selection model for construction projects.” J. Constr. Eng. Manage., 130(12), 1263–1273.
Songer, A. D., and Molenaar, K. R. (1997). “Project characteristics for successful public-sector design-build.” J. Constr. Eng. Manage., 123(1), 34–40.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 134Issue 7July 2008
Pages: 468 - 482

History

Received: Feb 28, 2007
Accepted: Nov 28, 2007
Published online: Jul 1, 2008
Published in print: Jul 2008

Permissions

Request permissions for this article.

Authors

Affiliations

ChangTaek Hyun, M.ASCE
Professor, Dept. of Architectural Engineering, Univ. of Seoul, Seoul 130-743, Korea.
KyuMan Cho
Ph.D. Candidate, Dept. of Architectural Engineering, Univ. of Seoul, Seoul 130-743, Korea.
KyoJin Koo
Associate Professor, Dept. of Architectural Engineering, Univ. of Seoul, Seoul 130-743, Korea.
TaeHoon Hong, A.M.ASCE
Assistant Professor, Dept. of Architectural Engineering, Univ. of Seoul, Seoul 130-743, Korea (corresponding author). E-mail: [email protected]
HyunSeok Moon
Ph.D. Student, Dept. of Architectural Engineering, Univ. of Seoul, Seoul 130-743, Korea.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share