Materials Handling System Simulation in Precast Viaduct Construction: Modeling, Analysis, and Implementation

Publication: Journal of Construction Engineering and Management
Volume 134, Issue 4

Abstract

The interactive, complicated system environment of a construction site renders conventional site layout planning and scheduling techniques to be inadequate in coping with materials handling system design in construction. In this paper, we present a university-industry joint endeavor for improving the effectiveness of the materials handling system on a precast viaduct construction project in Hong Kong by implementing the simplified discrete-event simulation approach (SDESA) along with its computer platform resulting from recent research. How to apply the simulation methodology of SDESA is elaborated step by step. Particular emphasis is placed on procedures of establishing a simulation model, validation of the simulation model, design of simulation experiments, and analysis of simulation results. With process flowchart, site layout plan, and process animation produced in a view-centric simulation environment, it is straightforward to establish, validate, and communicate the operations simulation. The research team convinced the project director, as well as field managers, of the functionality and effectiveness of operations simulation. The knowledge derived from simulation added to experiences of site managers in materials handling system design. With the aid of simulation, even junior engineers would be capable and confident to draw up an actionable construction plan that would lead to enhancement of cost effectiveness and productivity in the field.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The research presented in this paper was funded by Hong Kong Research Grants Council (Project No. UNSPECIFIEDPolyU 5141/04E). The writers also acknowledge the following management staff of Gammon Construction Ltd. (Hong Kong) for their support to this research: Mr. Thomas O. S. Ho, Executive Director and Chief Operating Officer, Mr. Philco N. K. Wong, Executive Director, Mr. R. Dean Wilson, Director of Human Resources, Mr. Rayland Lee, Projects Director, and Mr. Vincent Li, Project Manager of the Deep Bay Link (North) project.

References

Elbeltagi, E., Hegazy, T., and Eldosouky, A. (2004). “Dynamic layout of construction temporary facilities considering safety.” J. Constr. Eng. Manage., 130(4), 534–541.
Gonzales-Quevedo, A. A., AbouRizk, S. M., Iseley, D. T., and Halpin, D. W. (1993). “Comparison of two simulation methodologies in construction.” J. Constr. Eng. Manage., 119(3), 573–589.
Guo, S. J. (2002). “Identification and resolution of work space conflicts in building construction.” J. Constr. Eng. Manage., 128(4), 287–295.
Hajjar, D., and AbouRizk, S. M. (2003). “Unified modeling methodology for construction simulation.” J. Constr. Eng. Manage., 128(2), 174–185.
Halpin, D., and Woodhead, R. (1998). Construction management, 2nd Ed., Wiley, New York.
Halpin, D. W. (1977). “CYCLONE—Method for modeling job site processes.” J. Constr. Div., 103(3), 489–499.
Halpin, D. W. (1998). “Construction simulation: A status report.” Proc., 5th Canadian Construction Research Forum, Edmonton, Alberta, 35–40.
Horman, M. J., and Thomas, H. R. (2005). “Role of inventory buffers in construction labor performance.” J. Constr. Eng. Manage., 131(7), 834–843.
Li, Z., Anson, M., and Li, G. (2001). “A procedure for quantitatively evaluating site layout alternatives.” Constr. Manage. Econom., 19, 459–467.
Low, S. P., and Chuan, J. C. (2001). “Just-in-time management of precast concrete components.” J. Constr. Eng. Manage., 127(6), 494–501.
Lu, M. (2003). “Simplified discrete-event simulation approach for construction simulation.” J. Constr. Eng. Manage., 129(5), 537–546.
Lu, M., Anson, M., Tang, S. L., and Ying, K. C. (2003). “HKCONSIM: A practical simulation approach to planning Hong Kong’s concrete plant operations.” J. Constr. Eng. Manage., 129(5), 547–554.
Lu, M., and Chan, W. H. (2004). “Modeling concurrent operational delays in construction activities with simplified discrete event simulation approach.” Proc., Winter Simulation Conf. 2004, WSC Foundation, Washington, D.C., December, 1260–1267.
Lu, M., Chan, W. H., Zhang, J. P., and Cao, M. (2007). “Generic process mapping and simulation methodology for integrating site layout and operations planning in construction.” J. Comput. Civ. Eng., 121(4), 453–462.
Lu, M., and Wong, L. C. (2007). “Comparison of two simulation methodologies in modeling construction systems: Manufacturing-oriented PROMODEL vs. construction-oriented SDESA.” Autom. Constr., 16, 86-95.
Martinez, J. C. (1996). “STROBOSCOPE: State and resource based simulation of construction processes.” Ph.D. thesis, Univ. of Michigan, Ann Arbor, Mich.
O’Brien, J. J., and Plotnick, F. L. (2006). CPM in construction management, 6th Ed., McGraw-Hill, New York.
Oloufa, A. A., Ikeda, M., and Nguyen, T. H. (1998). “Resource-based simulation libraries for construction.” Autom. Constr., 7, 315–326.
Riley, D. R., and Sanvido, V. E. (1995). “Patterns of construction-space use in multistory buildings.” J. Constr. Eng. Manage., 121(4), 464–473.
Riley, D. R., and Sanvido, V. E. (1997). “Space planning method for multistory building construction.” J. Constr. Eng. Manage., 123(2), 171–180.
Shi, J. (1999). “Activity-based construction (ABC) modeling and simulation method.” J. Constr. Eng. Manage., 125(5), 354–360.
Shi, J., and AbouRizk, S. M. (1997). “Resource-based modeling for construction simulation.” J. Constr. Eng. Manage., 123(1), 26–33.
Tam, C. M., Tong, K. L., Leung, W. T., and Chiu, W. C. (2002). “Site layout planning using nonstructural fuzzy decision support system.” J. Constr. Eng. Manage., 128(3), 220–231.
Thomas, H. R., Riley, D. R., and Messner, J. I. (2005). “Fundamental principles of site material management.” J. Constr. Eng. Manage., 131(7), 808–815.
Thomas, H. R., Riley, D. R., and Sanvido, V. E. (1999). “Loss of labor productivity due to delivery methods and weather.” J. Constr. Eng. Manage., 125(1), 39–46.
Thomas, H. R., Sanvido, V. E., and Sanders, S. R. (1989). “Impact of material management on productivity—A case study.” J. Constr. Eng. Manage., 115(3), 370–384.
Tommelein, I. D. (1999). “Travel-time simulation to locate and staff temporary facilities under changing construction demand.” Proc., 1999 Winter Simulation Conf., WSC Foundation, 978–984.
Tommelein, I. D., Castillo, J. G., and Zouein, P. P. (1992). “Space-time characterization for resource management on construction sites.” Proc., 8th Conf. on Computing in Civil Engineering, 623–630.
Tommelein, I. D., and Zouein, P. P. (1993). “Interactive dynamic layout planning.” J. Constr. Eng. Manage., 119(2), 266–287.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 134Issue 4April 2008
Pages: 300 - 310

History

Received: Sep 11, 2006
Accepted: Sep 24, 2007
Published online: Apr 1, 2008
Published in print: Apr 2008

Permissions

Request permissions for this article.

Authors

Affiliations

Wah-Ho Chan
Graduate Engineer, Maunsell Consultants Asia Limited, 8/F Grand Central Plaza, Shatin, Hong Kong; formerly, MPhil Candidate, Dept. of Civil and Structural Engineering, Hong Kong Polytechnic Univ., Hong Kong, China.
Ming Lu, M.ASCE
Assistant Professor, Dept. of Civil and Structural Engineering, Hong Kong Polytechnic Univ., Hong Kong, China (corresponding author). E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share