TECHNICAL PAPERS
Jul 1, 2007

LEAPCON: Simulation of Lean Construction of High-Rise Apartment Buildings

Publication: Journal of Construction Engineering and Management
Volume 133, Issue 7

Abstract

A lean model has been proposed for the construction management of high-rise apartment buildings with customized apartment designs. It incorporates a number of changes to traditional management practice, including single-piece flow with pull scheduling, work restructuring, and multiskilling. A simulated construction process scenario was devised for experimental evaluation of the model. The simulation was first implemented as a live management game, in which participants played the roles of the clients, general contractor, and subcontractors. Eleven runs with different teams indicated that the lean model increased throughput, improved cash flow, and reduced apartment delivery cycle time. However, the limitations of the live simulation led the writers to implement a discrete event computer simulation of the same process. The computer simulation reinforced the findings of the live simulation and emphasized the specific beneficial effect of single-piece flow under pull scheduling. The lean model may be of immediate interest to construction planners and managers because it enables full customization with minimal waste and no additional resources. The demonstrative clarity of the lean model simulation, both live and computerized, makes it a powerful tool for education and research.

Get full access to this article

View all available purchase options and get full access to this article.

References

Arditi, D., Sikangwan, P., and Tokdemir, O. B. (2002). “Scheduling system for high-rise building construction.” Constr. Manage. Econom., 20(4), 353–364.
Arditi, D., Tokdemir, O. B., and Suh, K. (2001). “Scheduling system for repetitive unit construction using line-of-balance technology.” Eng., Constr., Archit. Manage., 8(2), 90–103.
Back, W. E., and Bell, L. C. (1995). “Monte Carlo simulation as a tool for process reengineering.” J. Management in Engineering, 11(5), 46–53.
Ballard, G. (2001). “Cycle time reduction in home building.” 9th Int. Group for Lean Construction, D. Chua and G. Ballard, eds., National Univ. of Singapore, Singapore, 1–9.
Ballard, G., Harper, N., and Zabelle, T. (2003). “Learning to see work flow: An application of lean concepts to precast concrete fabrication.” Eng., Constr., Archit. Manage., 10(1), 6–14.
Ballard, G., and Howell, G. (1998). “Shielding production: Essential step in production control.” J. Constr. Eng. Manage., 124(1), 11–17.
Bashford, H. H., Walsh, K., and Sawhney, A. (2005). “Production system loading: Cycle time relationship in residential construction.” J. Constr. Eng. Manage., 131(1), 15–22.
Edwards, D. J. (2003). “Accident trends involving construction plant: An exploratory analysis.” J. Constr. Res., 4(2), 161–173.
Egan, J. (1998). Rethinking construction. U.K. Department of Trade and Industry, ⟨http://www.constructingexcellence.org.uk/pdf/rethinking%20construction/rethinking_construction_report.pdf⟩.
El-Rayes, K., and Moselhi, O. (1998). “Resource-driven scheduling of repetitive activities.” Constr. Manage. Econom., 16, 433–446.
Farrar, J. M., AbouRizk, S. M., and Mao, X. (2004). “Generic implementation of lean concepts in simulation models.” Lean Construction J., 1(1), 1–23.
Frutos, J. D., and Borenstein, D. (2003). “Object-oriented model for customer-building company interaction in mass customization environment.” J. Constr. Eng. Manage., 129(3), 302–313.
Gann, D. M. (1996). “Construction as a manufacturing process? Similarities and differences between industrialized housing and car production in Japan.” Constr. Manage. Econom., 14(5), 437–450.
Gil, N., Tommelein, I. D., and Ballard, G. (2004). “Theoretical comparison of alternative delivery systems for projects in unpredictable environments.” Constr. Manage. Econom., 22(5), 495–508.
Goldratt, E. M. (1997). Critical chain, North River Press, Great Barrington, Mass.
Halpin, D. W. (1977). “CYCLONE: Method for modeling job site processes.” J. Constr. Div., 103(3), 489–499.
Hanna, A. S., Russell, J. S., Gotzion, T. W., and Nordheim, E. V. (1999). “Impact of change orders on labor efficiency for mechanical construction.” J. Constr. Eng. Manage., 125(3), 176–184.
Hinze, J., and Tracey, A. (1994). “The contractor–subcontractor relationship: The subcontractor’s view.” J. Constr. Eng. Manage., 120(2), 274–287.
Hopp, W. J., and Spearman, M. L. (1996). Factory physics, Irwin, Chicago.
Hsieh, T. (1998). “Impact of subcontracting on site productivity: Lessons learned in Taiwan.” J. Constr. Eng. Manage., 124(2), 91–100.
Josephson, P. E., and Hammarlund, Y. (1999). “The causes and costs of defects in construction: A study of seven building projects.” Autom. Constr., 8, 681–687.
Koskela, L. (2004). “Making do: The eighth category of waste.” 12th Conf. of the Int. Group for Lean Construction, S. Bertelsen and C. Formoso, eds., Elsinore, Denmark, 3–12.
Koskela, L., and Howell, G. (2002). “The underlying theory of project management is obsolete.” PMI Research Conf., Seattle, D. P. Slevin, D. I. Cleland, and J. K. Pinto, eds., Project Management Institute, 293–302.
Koushki, P. A., Al-Rashid, K., and Kartam, N. (2005). “Delays and cost increases in the construction of private residential projects in Kuwait.” Constr. Manage. Econom., 23, 285–294.
Laufer, A. (1996). Simultaneous management, American Management Association, New York.
LCI. (2004). Lean Construction Institute, ⟨http://www.leanconstruction.org/⟩ (March 26, 2005).
LEAPCON. (2005). Technion LEAPCON management simulation game, ⟨http://www.technion.ac.il/~cvsacks/tech-leap.htm⟩ (November 21, 2005).
Love, P. E. D., Mandal, P., Smith, J., and Li, H. (2000). “Modeling the dynamics of design error induced rework in construction projects.” Constr. Manage. Econom., 18(5), 567–574.
Martinez, J. C., and Ioannou, P. G. (1999). “General purpose systems for effective construction simulation.” J. Constr. Eng. Manage., 125(4), 265–276.
Moselhi, O., Assem, I., and El-Rayes, K. (2005). “Change orders impact on labor productivity.” J. Constr. Eng. Manage., 131(3), 354–359.
Naim, M., and Barlow, J. (2003). “An innovative supply chain strategy for customized housing.” Constr. Manage. Econom., 21, 593–602.
Peer, S. (1974). “Network analysis and construction planning.” J. Constr. Div., 100(3), 203–210.
Rosenfeld, Y., and Paciuk, M. (2000). “Characterization of apartment client change orders and their impact on construction efficiency.” Rep. 69.008, National Building Research Institute, Haifa (in Hebrew).
Sacks, R., and Goldin, M. (2007). “Lean management model for construction of high-rise apartment buildings.” J. Constr. Eng. Manage., 133(5), 374–384.
Seppanen, O., and Aalto, E. (2005). “A case study of line-of-balance based schedule planning and control system.” 13th Conf. of the Int. Group for Lean Construction, R. Kenley, ed., Univ. of New South Wales, Sydney, Australia, 271–279.
Serpell, A., Venturi, A., and Contreras, J. (1995). “Characterization of waste in building construction products.” 3rd Annual Conf. of the Int. Group for Lean Construction, G. Howell, ed., Univ. of New Mexico, Albuquerque, New Mexico.
Shaked, O., and Warszawski, A. (1995). “Knowledge-based system for construction planning of high-rise buildings.” J. Constr. Eng. Manage., 121(2), 172–182.
Tommelein, I. D. (1998). “Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique.” J. Constr. Eng. Manage., 124(4), 279–288.
Tommelein, I. D., Riley, D., and Howell, G. A. (1999). “Parade game: Impact of work flow variability on trade performance.” J. Constr. Eng. Manage., 125(5), 304–310.
Verma, A. K. (2003). “Simulation tools and training programs in lean manufacturing: Current status.” NSRP- ASE–0301-11, National Shipbuilding Research Program, Advanced Shipbuilding Enterprise.
Walsh, K. D., Sawhney, A., and Bashford, H. H. (2003). “Cycle-time contributions of hyperspecialization and time-gating strategies in US residential construction.” 11th Annual Conf. on Lean Construction, J. Martinez and C. Formoso, eds., Virginia Polytechnic Institute and State Univ., Blacksburg.
Warszawski, A., and Sacks, R. (2003). “A practical multi-factor approach to evaluating the risk of investment in engineering projects.” J. Constr. Eng. Manage., 130(3), 357–367.
Womack, J. P., and Jones, D. T. (2003). Lean thinking: Banish waste and create wealth in your corporation, Simon & Schuster, New York.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 133Issue 7July 2007
Pages: 529 - 539

History

Received: Dec 16, 2005
Accepted: Dec 28, 2006
Published online: Jul 1, 2007
Published in print: Jul 2007

Permissions

Request permissions for this article.

Authors

Affiliations

R. Sacks
Senior Lecturer, Faculty of Civil and Environmental Engineering, Technion—Israel Institute of Technology, 840 Rabin Bldg., Technion Campus, Haifa 32000, Israel. E-mail: [email protected]
A. Esquenazi
Graduate Student, Faculty of Civil and Environmental Engineering, Technion—Israel Institute of Technology. E-mail: [email protected]
M. Goldin
Graduate Student, Faculty of Civil and Environmental Engineering, Technion—Israel Institute of Technology. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share