TECHNICAL PAPERS
Mar 1, 2007

Management of Daily Progress in a Construction Project of Multiple Apartment Buildings

Publication: Journal of Construction Engineering and Management
Volume 133, Issue 3

Abstract

This paper presents the methods used and a case study of a project management system (PMS) to manage daily progress in the construction of multiple apartment buildings in South Korea. A dilemma encountered in previous research in the field of progress management is that efforts to enhance data accuracy cause the data handling workload to soar. A main feature of the method presented by the writers for calculating the budgeted cost work schedule is to allocate the project budget into control attributes, activities, and tasks that are defined in a work-packaging model, according to daily weight value. The method offers enhanced practicability by reducing data-handling workloads while not sacrificing the rationale of progress management. The work-packaging model is designed to enable project managers to acquire and process data for progress management at various levels of detail. The budgeted cost of work performed is measured daily at the tasks level using the earning percentage rate from daily work reports. The implementation of PMS focuses on functions to distribute the budget according to daily weight values and acquire the earning percentage from the daily work report. The PMS was applied to a construction project of 54 apartment buildings in South Korea. The case study of its use shows that company headquarters and managers in the field can acquire data for progress management without additional data-handling workloads, and can analyze the progress daily at various levels of detail.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

This work was part of the research (R11-2005-056-03001-0) supported by the Research Center for Technological Innovation on Sustainable Buildings, an Engineering Research Center (ERC) supported by the Korea Science and Engineering Foundation (KOSEF).

References

Barrie, D. S., and Paulson, B. C. (1992). Professional construction management, McGraw-Hill, New York, 252–274.
Carr, R. I. (1993). “Cost, schedule, and time variance and integration,” J. Constr. Eng. Manage., 119(2), 245–265.
Clark, F. D., and Lorenzoni, A. B. (1978). Applied cost engineering, Marcel Dekker, New York.
Eldin, N. N. (1989). “Measurement of work progress: Quantitative technique,” J. Constr. Eng. Manage., 115(3), 462–474.
Hendrickson, C. T., and Au, T. (1989). Project management for construction: Fundamental concepts for owners, engineers, architects, and builders, Prentice Hall, Englewood Cliffs, N.J.
Ministry of Construction and Transportation. (2005). Annual statistics Rep. 2005, Seoul, Republic of Korea.
Moder, J. J., Phillips, C. R., and Davis, E. W. (1983). Management with CPM, PERT, and precedence diagramming, Van Nostrand Reinhold, New York.
Rasdorf, W. J., and Abudayyeh, O. Y. (1991). “Cost and schedule control integration: Issues and needs,” J. Constr. Eng. Manage., 117(3), 486–502.
Stevens, W. M. (1986). “Cost control: Integrated cost/schedule performance,” J. Manage. Eng., 2(3), 157–164.
Teicholz, P. M. (1987). “Current needs for cost control systems.” Proc., Project controls: Needs and solutions, C. W. Ibbs and D. B. Ashrey, eds., ASCE, New York, 47–57.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 133Issue 3March 2007
Pages: 242 - 253

History

Received: Jun 28, 2005
Accepted: Oct 30, 2006
Published online: Mar 1, 2007
Published in print: Mar 2007

Permissions

Request permissions for this article.

Authors

Affiliations

Yong-Cheol Yang [email protected]
Researcher, Research Center, GS Engineering and Construction Company, GS Yeokjoen Tower 537 Namdaemun-ro 5-ga Joong-gu, Seoul, Korea. E-mail; [email protected]
Chan-Jung Park [email protected]
Researcher, Research Center, GS Engineering and Construction Company, GS Yeokjoen Tower 537 Namdaemun-ro 5-ga Joong-gu, Seoul, Korea. E-mail; [email protected]
Ju-Hyung Kim [email protected]
Assistant Professor, Dept. of Architectural Engineering, Tongmyoung Univ., 535 Yongdang-dong Nam-gu, Busan, Korea (corresponding author). E-mail; [email protected]
Jae-Jun Kim [email protected]
Professor, School of Architecture, Hanyang Univ., Haengdang-dong San 17 Seongdong-gu, Seoul, Korea. E-mail; [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share