Crew Production Rates for Contract Time Estimation: Beam Erection, Deck, and Rail of Highway Bridges

Publication: Journal of Construction Engineering and Management
Volume 132, Issue 4

Abstract

Both the importance and process of estimating highway construction time have increased in significance as roadway user costs themselves have become more significant. In estimating construction time, few parameters are more significant than work item crew production rates and factors significantly affecting those rates. A standardized data collection tool was used to acquire a total of 67 data points from 25 ongoing Texas highway projects between February 2002 and May 2004, for three selected critical work items: beam erection, bridge deck, and bridge rail. With the data, several hypothesized drivers of the crew production rates were analyzed. While the factor of shape of deck (straight versus curved) was identified as a statistically significant driver of bridge deck crew production rate, no statistically significant drivers were found for work items of beam erection and bridge rail. The study also found that both formwork and rebarwork crew sizes have significant relationships with bridge deck production rate. Findings from this study will enable highway agencies to enhance accuracy of contract time estimation for highway bridge construction. The methodology for obtaining field-based production rates will also be beneficial for future researchers.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

This paper is written based on a research project sponsored by the Texas Department of Transportation, and special thanks are extended to the inspectors and contractors who helped with data collection for this study.

References

Allmon, E., Haas, C. T., Borcherding, J. D., and Goodrum, P. M. (2000). “U.S. construction labor productivity trends, 1970–1998.” J. Constr. Eng. Manage., 126(2), 97–104.
Business Roundtable. (1974). “Effect of scheduled overtime on construction projects in coming to grips with some major problems in the construction industry.” Project Rep., New York.
Business Roundtable. (1980). “Scheduled overtime effect on construction projects.” C-2 Rep., Construction Industry Cost Effectiveness Project, New York.
Construction Industry Institute (CII). (1988). “The effects of scheduled overtime and shift schedule on construction craft productivity.” Source Document 43, Austin, Tex.
Construction Industry Institute (CII). (1994). “Effects of scheduled overtime on labor productivity: A quantitative analysis.” Source Document 98, Austin, Tex.
Everett, J. G., and Farghal, S. H. (1997). “Data representation for predicting performance with learning curves.” J. Constr. Eng. Manage., 123(1), 46–52.
Goodrum, P. M., and Haas, C. T. (2002). “Partial factor productivity and equipment technology change at activity level in U.S. construction industry.” J. Constr. Eng. Manage., 128(6), 463–472.
Hanna, A. S., Peterson, P., and Lee, M. (2002). “Benchmarking productivity indicators for electrical/mechanical projects.” J. Constr. Eng. Manage., 128(4), 331–337.
Herbsman, Z. J., and Ellis, R. (1995). Synthesis of Highway Practice 215: Determination of contract time for highway construction projects, Transportation Research Board, Washington, D.C.
Huh, Y. (2004). “Highway bridge construction production rates for contract time estimation.” Ph.D. thesis, Dept. of Civil Engineering, University of Texas at Austin, Austin, Tex.
Koehn, E., and Brown, G. (1985). “Climatic effects on construction.” J. Constr. Eng. Manage., 111(2), 129–137.
Koch, J. A., and Moavenzadeh, F. (1979). “Productivity and technology in construction.” J. Constr. Div., Am. Soc. Civ. Eng., 105(4), 351–366.
Sanders, S. R., and Thomas, H. R. (1991). “Factors affecting masonry-labor productivity.” J. Constr. Eng. Manage., 117(4), 626–644.
Sanders, S. R., and Thomas, H. R. (1993). “Masonry productivity forecasting model.” J. Constr. Eng. Manage., 119(1), 163–179.
Sanders, S. R., Thomas, H. R., and Smith, G. R. (1989). “An analysis of factors affecting labor productivity in masonry construction.” PTI Rep. 9003, Pennsylvania Transportation Institute, University Park, Pa.
Smith, S. D. (1999). “Earthmoving productivity estimation using linear regression techniques.” J. Constr. Eng. Manage., 125(3), 133–141.
Sonmez, R. (1996). “Construction labor productivity modeling with neural networks and regression analysis.” Ph.D. thesis, Dept. of Civil Engineering, Iowa State University, Ames, Iowa.
Stevens, J. (2002). “Applied multivariate statistics for the social sciences.” eBook: Lawrence Erlbaum Associates Inc., ⟨http://www.netlibrary.com⟩ (Mar. 30, 2004).
Thomas, H. R., and Raynar, K. A. (1997). “Scheduled overtime and labor productivity: A quantitative analysis.” J. Constr. Eng. Manage., 123(2), 181–188.
Thomas, H. R., and Smith, G. R. (1990). “Loss of construction labor productivity due to inefficiencies and disruptions: The weight of expert opinion.” PTI Rep. 9019, Pennsylvania Transportation Institute, University Park, Pa.
Thomas, H. R., Smith, G. R., and Sanders, S. R. (1989). “An exploratory study of productivity forecasting using the factor model for masonry.” PTI Rep. 9005, Pennsylvania Transportation Institute, University Park, Pa.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 132Issue 4April 2006
Pages: 408 - 415

History

Received: Aug 17, 2004
Accepted: Jul 1, 2005
Published online: Apr 1, 2006
Published in print: Apr 2006

Permissions

Request permissions for this article.

Authors

Affiliations

James T. O’Connor, M.ASCE [email protected]
C. T. Wells Professor of Project Management and Professor of Civil Engineering, Dept. of Civil Engineering, Univ. of Texas, Austin, TX 78712-1076. E-mail: [email protected]
Youngki Huh [email protected]
Assistant Professor, School of Architecture, Pusan National Univ., 30 Jangieon-Dong, Geumjeong-Gu, Busan 609-735, Republic of Korea. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share