Effects of Schedule Pressure on Construction Performance
Publication: Journal of Construction Engineering and Management
Volume 132, Issue 2
Abstract
Accelerating a project can be rewarding. The consequences, however, can be troublesome if productivity and quality are sacrificed for the sake of remaining ahead of schedule, such that the actual schedule benefits are often barely worth the effort. The tradeoffs and paths of schedule pressure—and its causes and effects—are often overlooked when schedule decisions are being made. This paper analyzes the effects that schedule pressure has on construction performance, and focuses on tradeoffs in scheduling. A research framework has been developed using a causal diagram to illustrate the cause-and-effect analysis of schedule pressure. An empirical investigation has been performed by using survey data collected from 102 construction practitioners working in 38 construction sites in Singapore. The results of this survey data analysis indicate that advantages of increasing the pace of work—by working under schedule pressure—can be offset by losses in productivity and quality. The negative effects of schedule pressure arise mainly by working out of sequence, generating work defects, cutting corners, and losing the motivation to work. The adverse effects of schedule pressure can be minimized by scheduling construction activities realistically and planning them proactively, motivating workers, and by establishing an effective project coordination and communication mechanism.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
This research was sponsored by the Department of Building, National University of Singapore (Academic Research Grant No. R-296-000-081-112). The support obtained from Mr. Sangjin Han, Project Manager, Samsung Corporation Singapore, is gratefully acknowledged. The writers acknowledge the assistance of the two anonymous reviewers for their insightful, thorough, and constructive comments and suggestions. Finally, they thank all of the respondents who participated in their survey.
References
Alfeld, L. E. (1988). Construction productivity: On-site measurement and management, McGraw-Hill, New York.
Ballard, G., and Howell, G. (1998). “Shielding production: Essential step in production control.” J. Constr. Eng. Manage., 124(1), 11–17.
Bertrand, J. W. M., and Van Ooijen, H. P. G. (2002). “Workload based order release and productivity: A missing link.” Prod. Plan. Control, 13(7), 665–678.
Bronner, R. (1982). Decision making under time pressure, Lexington Books, Lexington, Mass.
Construction Industry Institute (CII). (1989). “Concepts and methods of schedule compression.” Construction Industry Institute Publication No. 6-7, The University of Texas at Austin, Austin, Tex.
Cooper, K. G. (1994). “The : How managers influence project performance through the rework cycle.” IEEE Eng. Manage. Rev., 22(4), 12–23.
Eden, C., Williams, T., and Howick, S. (2000). “The role of feedback dynamics in disruption and delay on the nature of disruption and delay in major projects.” J. Oper. Res. Soc., 51(3), 291–300.
Hadavi, A., and Krizek, R. J. (1993). “Short-term goal setting for construction.” J. Constr. Eng. Manage., 119(3), 622–630.
Halligan, D. W., Demsetz, L. A., Brown, J. D., and Pace, C. B. (1994). “Action-response model and loss of productivity in construction.” J. Constr. Eng. Manage., 120(1), 47–64.
Hopp, W. J., and Spearman, M. L. (1996). Factory physics: Foundations of manufacturing management, Irwin, Chicago.
Horner, R. M. W., and Talhouni, B. T. (1995). Effects of accelerated working, delays and disruption on labor productivity, The Chartered Institute of Building, Ascot, U.K.
Howes, R. (2000). “Making governance mechanisms effective in a coordinated industry: The case of construction in the United Kingdom.” Int. J. Technol. Manage., 20(1), 194–213.
Laufer, A., and Jenkins, D. G. (1982). “Motivating construction workers.” J. Constr. Div., Am. Soc. Civ. Eng., 108(4), 531–545.
Locke, E. A., and Latham, G. P. (1984). Goal setting for individuals, groups, and organizations, Science, Research Associates, Chicago.
Loosemore, M., and Lee, P. (2002). “Communication problems with ethnic minorities in the construction industry.” Int. J. Proj. Manage. 20(7), 517–524.
Michalak, C. F. (1997). “The cost of chasing unrealistic project schedules.” Transactions of the American Association of Cost Engineers, PC.02.1–PC.02.6.
Norušis, M. J. (2002). SPSS 11.0 guide to data analysis, Prentice Hall, Upper Saddle River, N.J.
Pallant, J. (2001). SPSS survival manual: A step by step guide to data analysis using SPSS for Windows (version 10), Open University Press, Buckingham, U.K.
Pena-Mora, F., and Park, M. (2001). “Dynamic planning for fast-tracking building construction projects.” J. Constr. Eng. Manage., 127(6), 445–456.
Rastegary, H., and Landy, F. J. (1991). “The interactions among time urgency, uncertainty, and time pressure.” Time pressure and stress in human judgment and decision making, O. Svenson and A. J. Maule, eds., Plenum, New York, 217–239.
Sterman, J. (2000). Business dynamics: System thinking and modeling for a complex world, McGraw-Hill, New York.
Svenson, O., and Benson, L. (1991). “On experimental instructions and the inducement of time pressure behavior.” Time pressure and stress in human judgment and decision making, O. Svenson and A. J. Maule, eds., Plenum, New York, 157–165.
Thomas, H. R. (2000). “Schedule acceleration, work flow, and labor productivity.” J. Constr. Eng. Manage., 126(4), 261–267.
Wickens, C. D., and Hollands, J. G. (2000). Engineering psychology and human performance, 3rd Ed., Prentice Hall, Upper Saddle River, N.J.
Information & Authors
Information
Published In
Copyright
© 2006 ASCE.
History
Received: Jun 28, 2004
Accepted: Jul 1, 2005
Published online: Feb 1, 2006
Published in print: Feb 2006
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.