TECHNICAL PAPERS
Oct 1, 2006

Lean Processes for Sustainable Project Delivery

Publication: Journal of Construction Engineering and Management
Volume 132, Issue 10

Abstract

Facility owners and project teams often struggle to engage “green” or “sustainable” requirements on building projects and can incur additional project costs as a result. Although “investments” in high performance building features can be paid back through operational savings, the project delivery methods currently adopted by most teams are laden with process waste. Lean production principles have been proven to reduce waste and improve process performance in highly complex development and production environments. Adopting these lean principles, this paper reports a study that identified the presence of value and waste in a sustainable building project. Through an empirical investigation of the Real Estate and Facilities Division of Toyota Motor Sales, Toyota’s capital facility delivery process was mapped to identify both the steps in project delivery critical for success (value) and those that are waste. The investigation focused on the South Campus Facility, which received U.S. Green Building Council’s Leadership in Energy and Environmental Design Gold certification at a project cost equivalent to a conventional facility. Through post hoc process-based analysis, insight about what added value and waste in sustainable project delivery at Toyota was obtained. The results also identify further improvement opportunities to Toyota’s delivery process. For corporate facility owners and the Architecture Engineering Construction industry, the results unearth insights about how to successfully and economically deliver sustainable facilities.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The writers of this paper wish to thank Toyota Motor Sales Real Estate and Facilities, and the Lean and Green Research Initiative and the Partnership for Achieving Construction Excellence (PACE) at Penn State for their support of this research.

References

Arbulu, R., and Tommelein, I. (2002). “Value stream analysis of construction supply chains: Case study on pipe supports used in power plants.” Proc., 10th Annual Conf. of Lean Construction, August 6–8, Gramado, Brazil, Universidade Federal do Rio Grande do Sul, Brazil.
Ballard, G. (2000). “Lean project delivery system.” Lean Construction Institute White Paper No. 8, Lean Construction Institute, Ketchum, Id.
Ballard, G., and Howell, G. (1998). “Shielding production: Essential step in production control.” J. Constr. Eng. Manage., 124(1), 11–17.
Ballard, G., and Zabelle, T. R. (2000). “Lean design: Process, tools, and techniques.” Lean Construction Institute White Paper No. 10, Lean Construction Institute, Ketchum, Id.
Bremner, B., Dawson, C., Kerwin, K., Palmeri, C., and Magnusson, P. (2003). “Can anything stop Toyota?” Business Week Online, ⟨http://businessweek.com/magazine/content/03_46/b3858001_mz001.htm⟩ (June 9, 2005).
Hawken, P., Lovins, A., and Lovins, L. (1999). Natural capitalism: Creating the next industrial revolution, Little, Brown, and Company, Boston.
Hines, P., and Taylor, D. (2000). Going lean, Lean Enterprise Research Centre, Cardiff, U.K.
Horman, M., and Kenley, R. (2005). “Quantifying levels of wasted time in construction with meta-analysis.” J. Constr. Eng. Manage., 131(1), 52–61.
Horman, M., Riley, D., Lapinski, A., Korkmaz, S., Pulaski, M., Magent, C., Luo, Y., Harding, N., and Dahl, P. (2006). “Delivering green building project: Process improvements for sustainable construction.” Journal of Green Building, 1(1), 123–140.
Horman, M. J., Riley, D. R., Pulaski, M. H., and Leyenberger, C. (2004). “Lean and green: Integrating sustainability and lean construction,” CIB World Building Congress, May 2–7, Toronto, International Council for Research and Innovation in Building and Construction (CIB), Rotterdam, The Netherlands.
Huovila, P., and Koskela, L. (1998). “Contribution of the principles of lean construction to meet the challenges of sustainable development,” Proc., 6th Annual Conf. on Lean Construction, August 13–15, Guarujá, Brazil.
Koskela, L. (1992). “Application of the new production philosophy to construction.” Technical Rep. No. 72, Center for Integrated Facilities Engineering, Stanford Univ., Stanford, Calif.
Lapinski, A. R. (2005). “Delivering sustainability: Mapping Toyota Motor Sales’ corporate facility delivery process.” MS thesis, Architectural Engineering, The Pennsylvania State University, University Park, Pa.
Lapinski, A., Horman, M., and Riley, D. (2005). “Delivering sustainability: Lean principles for green projects,” ASCE Construction Research Congress (CRC), April 5–7, San Diego, ASCE, Reston, Va., 136–140.
Liker, J. K. (2004). The Toyota way, McGraw-Hill, New York.
Ohno, T. (1988). Toytota production system: Beyond large-scale production, Productivity Press, Portland, Ore.
Pristin, T. (2003). “Toyota’s new main campus: Green goes mainstream.” The New York Times, New York, C6.
Pulaski, M., Pohlman, T., Horman, M., and Riley, D. (2003). “Synergies between sustainable design and constructability at the Pentagon.” ASCE Construction Research Congress (CRC), March 18–20, Honolulu, ASCE, Reston, Va.
Riley, D., Magent, C., and Horman, M. (2004). “Sustainable metrics: A design process model for high performance buildings,” CIB World Building Congress, May 2–7, Toronto, CIB, The Netherlands.
Rother, M., and Harris, R. (2002). Creating continuous flow, Lean Enterprise Institute, Brookline, Mass.
Rother, M., and Shook, J. (1999). Learning to see, Lean Enterprise Institute, Brookline, Mass.
Sanvido, V. E. (1990). “An integrated building process model.” Construction Research Program Technical Rep. No. 1. The Pennsylvania State University, University Park, Pa.
Shingo, S., and Dillon, A. P. (1989). A Study of the Toyota production system from an industrial engineering viewpoint, Productivity Press, Cambridge, Mass.
Smith, A. (2003). “Building momentum: National trends and prospects for high-performance green buildings.” Rep. by the U.S. Green Building Council for the U.S. Senate Committee on Environment and Public Works, USGBC, Washington, D.C.
Spear, S. J. (2004). “Learning to lead at Toyota.” Harvard Bus. Rev., 82(5), 78–91.
Spear, S. J., and Bowen, H. K. (1999). “Decoding the DNA of the Toyota production system.” Harvard Bus. Rev., 77(5), 96–106.
Stalk, G., Jr., and Hout, T. M. (1989). Competing against time, Free Press, New York.
Tommelein, I. D., and Li, A. E. Y. (1999). “Just-in-time concrete delivery: Mapping alternatives for vertical supply chain integration,” Proc., 7th Annual Conf. on Lean Construction, July 26–28, Berkeley, Calif., University of California-Berkeley, Berkeley, Calif.
Tommelein, I. D., and Weissenberger, M. (1999). “More just-in-time: Location of buffers in structural steel supply and construction processes,” Proc., 7th Annual Conf. on Lean Construction, July 26–28, Berkeley, Calif., University of California-Berkeley, Berkeley, Calif.
U.S. General Services Administration (GSA). (2004). “GSA LEED cost study: Final report,” Rep. No. GS-11P-99-MAD-0565, GSA, Washington, D.C.
Womack, J. P., Jones, D. T., and Roos, D. (1990). The machine that changed the world: The story of lean production, HarperPerennial, New York.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 132Issue 10October 2006
Pages: 1083 - 1091

History

Received: Jul 25, 2005
Accepted: Mar 20, 2006
Published online: Oct 1, 2006
Published in print: Oct 2006

Permissions

Request permissions for this article.

Authors

Affiliations

Anthony R. Lapinski
Formerly, Graduate Student, Dept. of Architectural Engineering, Penn State Univ., 203 Engineering Unit A, University Park, PA 16802.
Michael J. Horman [email protected]
Associate Professor of Architectural Engineering, Penn State Univ., 211 Engineering Unit A, University Park, PA 16802. E-mail: [email protected]
David R. Riley [email protected]
Associate Professor of Architectural Engineering, Penn State Univ., 220 Engineering Unit A, University Park, PA 16802. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share