TECHNICAL PAPERS
Jun 1, 2005

Interface Management for China’s Build–Operate–Transfer Projects

Publication: Journal of Construction Engineering and Management
Volume 131, Issue 6

Abstract

Stringent pressure on public finances has made China’s infrastructure development a “bottleneck” in its bid to sustain rapid economic growth. As a result, many modalities have been developed to utilize the resources and skills of the private sector to supply essential infrastructure products and services, as well as to improve the efficiency in government procurement of the same. The build–operate–transfer (BOT) approach is an important example of these innovative modalities. The BOT approach in China is still in its infancy; many pitfalls await the unwary and obstacles impede more extensive application of this modality. The pitfalls are attributable to the complexities in the BOT approach, particularly when attempted in China’s transition economy emerging from decades of central planning to become one that is more market driven and globally integrated. This paper proposes two systems concepts to help manage this complexity: (1) a process modeling approach that maps key functions, parameters and interfaces in the project delivery process, and (2) the use of interface management involving specific measures that have contributed towards project success in Chinese BOT projects. The process modeling approach has led to the development of China’s BOT generic process model (CBGPM). Expert opinion was elicited on the criticality of the interfaces identified in CBGPM as well as the effectiveness of selected interface management measures. Finally, an interface management framework consisting of five key steps is suggested for China’s BOT projects.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The writers are grateful to all respondents of the interviews and questionnaire surveys for their valuable opinions and contributions. The writers are especially grateful to the Chengdu Générale des Eaux-Marubeni Waterworks Co., Ltd. (Vivendi-Marubeni) for giving interviews and providing related information.

References

Archibald, R. D. (2003). Managing high-technology programs and projects, Wiley, New York.
Baker, S. K. (1992). On time/on budget, Prentice Hall, Englewood Cliffs, N.J.
Chen, C. (2002). “Challenges and opportunities for BOT application in China,” MEng thesis, The National Univ. of Singapore, Singapore.
Cho, H. C. (1999). “Study on concession models for private sector involvement in Asian infrastructure development.” PhD thesis, Univ. of Tokyo, Tokyo.
Delmon, J. (2000). BOO/BOT projects: A commercial and contractual guide, Sweet & Maxwell, London.
Flanagan, R., and Li, S. R. (1997). International construction: A perspective of China, The Chartered Institute of Building, U.K.
Huang, Y. L. (1995). “Project and policy analysis of build–operate–transfer infrastructure development,” PhD thesis, Univ. of California at Berkeley, Berkeley, Calif.
Lock, D. (1996). Project management, Brookfield, Vt., Gower, Hampshire, U.K.
Meredith, J. R., and Mantel, S. J. (1989). Project management: A managerial approach, Wiley, New York.
Morris, P. W. G. (1983). “Managing project interfaces—Key points for project success.” Project management handbook, D. I. Cleland and W. R. King, eds., Van Nostrand Reinhold, New York.
Orr, D. (1997). “China’s new rules.” Infrastructure Finance, 5(9), 36–39.
Patrick, H. P. (1997). “Interface.” Project management: Getting the job done on time and in budget, Butterworth-Heinemann, Newton, Mass.
Pavitt, T. C., and Gibb, A. G. F. (2003). “Interface management within construction: In particular, building facade.” J. Constr. Eng. Manage., 129(1), 8–15.
Qiao, L., Wang, S. Q., Tiong, L. K. R., and Chan, T. S. (2001). “Framework for critical success factors of BOT projects in China.” J. Structured Project Finance, 7(1), 53–61.
Sanvido, V. E., et al. (1990). “An integrated building process model.” Tech. Rep. No. 1, Computer Integrated Construction Research Program, The Pennsylvania State Univ., University Park, Pa.
Shen, L. Y., Lee, R. K. H., and Zhang, Z. H. (1996). “Application of BOT system for infrastructure projects in China.” J. Constr. Eng. Manage., 122(4), 319–323.
Stuckenbruck, L. C. (1983). “Project integration in the matrix organization.” Project management handbook, Van Nostrand Reinhold, New York, 37–58.
Tiong, L. K. R. (1992). The structuring of build-operate-transfer construction projects, Center for Advanced Construction Studies, NTU, Singapore.
Tiong, L. K. R. (1996). “CSFs in competitive tendering and negotiation model for BOT projects.” J. Constr. Eng. Manage., 122(3), 205–211.
UNIDO. (1996). Guidelines for infrastructure development through build-operate-transfer (BOT) projects, UNIDO, Vienna, Austria.
Wang, S. Q., and Tiong, L. K. R. (2000). “Case study of government initiatives for PRC’s BOT power plant projects.” Int. J. Proj. Manage., 18(1), 69–78.
Wideman Comparative Glossary of Project Management Terms V3.1. (2003). ⟨http://www.maxwideman.com/pmglossary/PMG̱I03.htm⟩ (August 6, 2003).
Yaworsky, R. A., (1994). “Risk planning for large and BOT projects: A holistic framework.” PhD thesis, The Univ. of British Columbia, B.C., Canada.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 131Issue 6June 2005
Pages: 645 - 655

History

Received: Sep 9, 2003
Accepted: Mar 15, 2004
Published online: Jun 1, 2005
Published in print: Jun 2005

Permissions

Request permissions for this article.

Authors

Affiliations

Weng Tat Chan [email protected]
Associate Professor, Dept. of Civil Engineering, National Univ. of Singapore, Singapore 119260. E-mail: [email protected]
Graduate Research Assistant, Dept. of Architectural Engineering, The Pennsylvania State Univ., University Park, PA 16802. E-mail: [email protected]
John I. Messner [email protected]
Assistant Professor, Dept. of Architectural Engineering, The Pennsylvania State Univ., University Park, PA 16802. E-mail: [email protected]
David Kim Chua [email protected]
Associate Professor, Dept. of Civil Engineering, National Univ. of Singapore, Singapore 119260. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share