TECHNICAL PAPERS
Mar 1, 2005

Critical Path Method with Multiple Calendars

This article has a reply.
VIEW THE REPLY
This article has a reply.
VIEW THE REPLY
This article has a reply.
VIEW THE REPLY
Publication: Journal of Construction Engineering and Management
Volume 131, Issue 3

Abstract

This paper presents the critical path method forward and backward passes with multiple calendars. Multiple calendars are required in many construction projects to effectively represent various project conditions such as work properties, resource availabilities, weather conditions, etc. For this reason, major project management software packages such as P3 and MS-Project provide functions to handle multiple calendars. However, the background theory of handling multiple calendars has not been disclosed, so users of those software packages simply assume without clear knowledge that the time data generated by them are correct. This paper provides how multiple calendars should be handled in scheduling. Applying the theory presented herein, it has been noticed that the P3 operations with two calendars may generate a wrong answer for a start-to-finish with zero lag and inconsistent results in all negative lags when nonworking days are involved. The theory covers all four relationships in the precedence diagramming method with lags of zero, positive, and negative values. This study should be of considerable benefit to the construction industry and academics because it details and advances the theory for scheduling with multiple calendars, which is real scheduling in practice.

Get full access to this article

View all available purchase options and get full access to this article.

References

Ahuja, H. N., and Nandakumar, V. (1985). “Calendar date scheduling on microcomputers.” Cost Eng., 27(2), 21–27.
Battersby, A. (1967). Network analysis for planning and scheduling, St. Martin’s Press, New York.
Callahan, M. T., Quackenbush, D. G., and Rowings, J. E. (1992). Construction project scheduling, McGraw-Hill, New York.
Clough, R. H., Sears, G. A., and Sears, S. K. (2000). Construction project management, 4th Ed., Wiley, New York.
Knutson, J. (2001). Project management for business professionals: a comprehensive guide, Wiley, New York.
Korman, R., and Daniels, S. H. (2003). “Critics can’t find the logic in many of today’s CPM schedules.” ENR, 250(20), 30–33.
Liberatore, M. J., Pollack-Johnson, B., and Smith, C. A. (2001). “Project management in construction: Software use and research directions.” J. Constr. Eng. Manage., 127(2), 101–107.
Lock, D. (2000). Project management, 7th Ed., Gower.
Melin, J. W., and Whiteaker, B. (1981). “Fencing a bar chart.” J. Constr. Div., Am. Soc. Civ. Eng., 107(3), 497–507.
Wallwork, J. W. (2002). “Standards for a Critical Path Method Schedule” Cost Eng., 44(6), 13.
Wickwire, J. M., Driscoll, T. J., Hurlbut, S. B., and Hillman, S. B. (2003). Construction Scheduling: Preparation, liability, and claims, 2nd Ed., Aspen, New York.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 131Issue 3March 2005
Pages: 330 - 342

History

Received: Jun 23, 2003
Accepted: Jun 10, 2004
Published online: Mar 1, 2005
Published in print: Mar 2005

Permissions

Request permissions for this article.

Authors

Affiliations

Research Scientist, Construction Research Institute, Hanyang Univ., Seoul, 133-791, Korea. E-mail: [email protected]
Jesús M. de la Garza, A.M.ASCE E-mail: [email protected]
Vecellio Professor, The Charles E. Via, Jr. Dept. of Civil and Environmental Engineering, Virginia Polytechnic Institute and State Univ., Blacksburg, VA 24061-0105. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share