Cost Impacts, Scheduling Impacts, and the Claims Process during Construction
Publication: Journal of Construction Engineering and Management
Volume 131, Issue 1
Abstract
Construction mismanagement results in multiple problems that can cascade throughout the work force chain, affecting the schedule and leading to damages to multiple parties. Although the problem may start with a single subcontractor, it can result in all contractors feeling some impact to their work. In this paper, a case study is presented of a project with seven different mismanagement scenarios. A description of each scenario is provided as well as a quantification of the damages that result from the problem. A construction claims section is also included that addresses many of the issues that could result from a claim for each of the seven scenarios. A discussion is presented outlining possible preventative steps to minimize the damages from the problems presented.
Get full access to this article
View all available purchase options and get full access to this article.
References
Akpan, E. O. P., and Igwe, O. (2001). “A methodology for determining price variation in project execution.” J. Constr. Eng. Manage., 127(5), 367–373.
Asem, M., Abdul-Malak, U., El-Saadi, M. M. H., and Abou-Zeid, M. G. (2002). “Process model for administrating construction claims.” J. Manage. Eng., 18(2), 84–94.
Brunies, R., and Eng, Z. E. (2003). “Calculating loss of productivity due to overtime using published charts-Fact or fiction.” Technical Rep., Revay and Associates Limited, Montréal.
Chang, A. (2002). “Reasons for cost and schedule increase for engineering design projects.” J. Manage. Eng., 18(1), 29–36.
Chester, M. (2003). “Microsoft project files of base case and scenarios.” ⟨http:∕∕www.ce.cmu.edu∕∼cth∕chester-paper∕⟩ (August 15, 2003).
Finke, M. (1998). “A better way to estimate and mitigate disruption.” J. Constr. Eng. Manage., 124(6), 490–497.
Guo, S.-J. (2002). “Identification and resolution of work space conflicts in building construction.” J. Constr. Eng. Manage., 128(4), 287–295.
Hanna, A. S., Russell, J. S., Nordheim, E. V., and Bruggink, M. J. (1999). “Impact of change orders on labor efficiency for electrical construction.” J. Constr. Eng. Manage., 125(4), 224–232.
Ibbs, C. W., and Allen, W. E. (1995). “Quantitative impacts of project change.” Source Document 108, Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
Kartam, S. (1999). “Generic methodology for analyzing delay claims.” J. Constr. Eng. Manage., 125(6), 409–419.
Kululanga, G. K., Kuotcha, W., McCaffer, R., and Edum-Fotwe, F. (2001). “Construction contractors claim process framework.” J. Constr. Eng. Manage., 127(4), 309–314.
Leonard, C., Moselhi, O., and Fazio, P. (1991). “Impact of change orders on construction productivity.” Can. J. Civ. Eng., 18, 484–492.
Pittsburgh Business Times (2002). “Pittsburgh office market still a bit weak.” ⟨http:∕∕www.bizjournals.com∕pittsburgh∕stories∕2002∕07∕15∕daily48.html⟩ (July 19, 2002).
Thomas, H. R. (2000). “Schedule acceleration, work flow, and labor productivity.” J. Constr. Eng. Manage., 126(4), 261–267.
Thomas, H. R., and Napolitan, C. L. (1995). “Quantitative effects of construction changes on labor productivity.” J. Constr. Eng. Manage., 121(3), 290–296.
U.S. Army Corps of Engineers (1979). “Modification impact evaluation guide.” Technical Rep. EP 415-1-3, Washington, D.C.
Information & Authors
Information
Published In
Copyright
© 2004 ASCE.
History
Received: Mar 20, 2003
Accepted: Jan 12, 2004
Published online: Jan 1, 2005
Published in print: Jan 2005
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.