Production Process for Manufactured Housing
Publication: Journal of Construction Engineering and Management
Volume 130, Issue 5
Abstract
A manufactured home is completely built in a controlled factory environment. Despite a large share of the market, the manufactured housing industry has a long way to go towards streamlining its production process. The objective of this paper is to map the production process of a manufactured housing factory and to demonstrate via simulation how the process can be improved. The production process including assembly, feeder, and storage stations were mapped using data from several manufactured housing plants and in-depth case studies at two plants in northern Indiana. The case study plants were also used for collecting cycle-time data for developing the simulation model for the roofing process. Subsequently, four “what if” scenarios were conducted to illustrate potential improvements to the production process. The efforts presented in this paper are part of on-going research sponsored by the National Science Foundation under the Partnership for Advancement of Technology in Housing (PATH) initiative.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Aft, L.S. ( 1992). Productivity measurement and improvement, (Prentice-Hall, Englewood Cliffs, N.J.
2.
Halpin, D.W., and Riggs, L.S. ( 1992). Planning and analysis of construction operations, Wiley, New York.
3.
Harrington, H.J. ( 1991). Business process improvement, McGraw-Hill, New York.
4.
Housing and Urban Development (HUD). (1995). Manufactured home construction and safety standards, part 3280: Interpretative bulletins to the standards 1995, HUD-U.S. Department of Housing and Urban Development, Washington, D.C.
5.
Housing and Urban Development (HUD). (1998). Factory and site-built housing: A comparison for the 21st century, U.S. Department of Housing and Urban Development, Washington, D.C.
6.
Manufactured Housing Institute (MHI). (2000). Quick facts 1999–2000, MHI, Arlington, Va.
7.
Martinez, J.C. ( 1996). “STROBOSCOPE–State and resource based simulation of construction processes.” Doctoral dissertation, Department of Civil and Environmental Engineering, University of Michigan, Ann Arbor, Mich.
8.
Martinez, J.C. ( 1998). “EZSTROBE-Introductory general-purpose simulation system based on activity cycle diagrams.” EZSTROBE Software Tutorial, Civil & Environmental Engineering Department, Virginia Tech, Blacksburg, Va.
9.
Mehrotra, N., Syal, M., and Senghore, O. ( 2002). “Manufactured housing trends and regulations in michigan, vol. 1.” Project Report, Michigan State University, Construction Management Program, East Lansing, Mich.
10.
Michigan Manufactured Housing Association (MMHA). (2000). Fact sheets, Okemos, Mich.
11.
Oglesby, C.H., Parker, H.W., and Howell, G.A. ( 1989). Productivity improvement in construction, McGraw-Hill, New York.
12.
Paulson, B. C., Jr. ( 1995). Computer applications in construction, McGraw-Hill, New York.
15.
Pritsker, A. ( 1986).Introduction to Simulation and SLAMII, A. Halsted Press BookWiley, New York.
13.
Sawhney, A., and AbouRizk, S.M. ( 1993). “An overview of construction simulation and its applications.” J. Constr. Manage. VIII, (II), 93–100.
14.
Senghore, O. ( 2001). “Production and material flow process model for manufactured housing.” Master thesis, Construction Management Program, Michigan State University, East Lansing, Mich.
Information & Authors
Information
Published In
Copyright
Copyright © 2004 ASCE.
History
Published online: Oct 1, 2004
Published in print: Oct 2004
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.