Transportation Agency Use of Owner-Controlled Insurance Programs
Publication: Journal of Construction Engineering and Management
Volume 130, Issue 4
Abstract
Controlled insurance programs are highly efficient risk control mechanisms. With a controlled insurance program, the interest of the owner, designer, construction manager, contractors, and consultants are covered by one insurance arrangement. This paper describes the current state of practice regarding the use of owner-controlled insurance programs by transportation agencies. Departments of transportation that have used controlled insurance programs for their major projects (construction costs greater than $100 million) report that they were satisfied with the results. But contractors are cautious because, when an owner’s controlled insurance program administrator fails to perform, it is the contractor who incurs the residual consequences of increased business cost, and those consequences can extend far into the future.
Get full access to this article
View all available purchase options and get full access to this article.
References
Arizona Department of Transportation (ADOT). (2000). “Use of owner controlled insurance program on US60, Superstition Freeway, Project No. 060-C-1(B).” ADOT Office Memo, Dated May 19, 2000, Phoenix.
Associated General Contractors of America (AGC). (2001). “OCIPs look before you leap! A contractor’s guide to owner controlled insurance programs.” 〈http://www.agc.org/Safety_Info/ocips.asp〉 (Dec. 1, 2001).
Bird, G. E. (2000). The wrap-up guide, 3rd Ed., International Risk Management Institute, Dallas.
Decampi-Stewart, M. L. (1992). “Construction insurance wrap-up programs: Big savings, but not for everybody.” Government Finance Review, February, 11–16.
Donovan, D. (1999). “Programs reduce construction project risk.” Houston Business Journal, Nov. 15.
Fisher, D. J., Anderson, S. D., and Rahman, S. P.(2000). “Integrating constructability tools into constructability review process.” J. Constr. Eng. Manage., 126(2), 89–96.
General Accounting Office (GAO). (1999). “Advantages and disadvantages of wrap-up insurance for large construction projects.” Rep. GAO/RCED-99-155 Prepared for Subcommittee on Transportation, Committee on Appropriations, U.S. Senate, Washington, D.C.
“Insurance—Construction firms bracing for soaring cost and risk.” (2001). ENR, Nov. 12.
Owner-controlled insurance program (OCIP) manual; I-15 Reconstruction Project. (1997). Willis Corroon, Salt Lake City, Utah.
Parsons Brinckerhoff, Inc. (undated). “Application of an owner controlled insurance plan (OCIP) to Florida’s turnpike construction.” Rep. Prepared for Florida Dept. of Transportation, Columbia, S.C.
Project insurance manual (New Mexico 44 Project). (1999). Willis Corroon–Construction Group, Dallas.
Project insurance manual; T-REX Project Partner Controlled Insurance Program. (2001). Lockton Companies, Denver.
Schexnayder, C. J., and Weber, S. L. (2002). “Owner controlled insurance programs.” NCHRP Synthesis 308, National Cooperative Highway Research Program, Transportation Research Board, Washington, D.C.
Wrap-up insurance manual. (1996). Massachusetts Highway Department Central Artery/Tunnel Project, Boston.
Information & Authors
Information
Published In
Copyright
Copyright © 2004 American Society of Civil Engineers.
History
Received: Jul 15, 2002
Accepted: May 20, 2003
Published online: Jul 15, 2004
Published in print: Aug 2004
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.