Analytical Model for Analyzing Construction Claims and Opportunistic Bidding
Publication: Journal of Construction Engineering and Management
Volume 130, Issue 1
Abstract
Construction claims are considered by many project participants to be one of the most disruptive and unpleasant events of a project. Construction claims occur for various reasons. There is a need to understand the dynamic nature between construction claims and opportunistic bidding. An analytical model, the Claims Decision Model (CDM), based on “game theory,” was developed to study opportunistic bidding and construction claims. This model explains (1) how people behave during a potential or existing claiming situation, (2) how different claiming situations are related to opportunistic bidding behavior, and (3) what situations encourage or discourage opportunistic behavior. The results of this pilot study indicate that the equilibrium solution of a construction claim is to negotiate and settle, which concurs with most of the claim cases in the industry. The possible range of a negotiation settlement is obtained in this paper. The model provides the rationale for recent innovations to manage disputes. The model can also help project owners identify the possibility of opportunistic bidding, and can assist the project participants in analyzing construction claims.
Get full access to this article
View all available purchase options and get full access to this article.
References
Adrian, J. J. (1993). Construction claims: A quantitative approach, Stipes, Champaign, Ill.
Binmore, K. (1992). Fun and games: A text on game theory, D. C. Heath and Company, Lexington, Mass.
Clemen, R. T. (1991). Making hard decisions—An introduction to decision analysis, PWS-KENT, Boston.
Gibbons, R. (1992). Game theory for applied economists, Princeton University Press, Princeton, N.J.
Ioannou, P. G., and Leu, S.(1993). “Average-bid method—Competitive bidding strategy.” J. Constr. Eng. Manage., 119(1), 131–147.
Jergeas, G. F., and Hartman, F. T.(1994). “Contractor’s construction-claims avoidance.” J. Constr. Eng. Manage., 120(3), 553–560.
Kangari, R.(1995). “Construction documentation in arbitration.” J. Constr. Eng. Manage., 121(2), 201–208.
Kumaraswamy, M. M., and Yogeswaran, K.(1998). “Significant sources of construction claims.” Int. Constr. Law Review, 15(1), 144–160.
Levin, P. (1998). Construction contract claims, changes and dispute resolution, 2nd Ed., ASCE, Reston, Va.
Maher, M. (1997). Cost accounting: Creating value for management, 5th Ed., Irwin/McGraw-Hill, New York.
Myerson, R. B. (1991). Game theory: Analysis of conflict, Harvard University Press, Cambridge, Mass.
Rubin, R. A., Guy, S. D., Maevis, A. C., and Fairweather, V. (1983). Construction claims, Van Nostrand Reinhold, New York.
Semple, C., Hartman, F. T., and Jergeas, G.(1994). “Construction claims and disputes: Causes and cost/time overruns.” J. Constr. Eng. Manage., 120(4), 785–795.
Simon, M. S. (1979). Construction contracts and claims, McGraw-Hill, New York.
Zack, J. G., Jr.(1993). “‘Claimsmanship’: Current perspective.” J. Constr. Eng. Manage., 119(3), 480–497.
Information & Authors
Information
Published In
Copyright
Copyright © 2004 American Society of Civil Engineers.
History
Received: Mar 19, 2002
Accepted: Aug 9, 2002
Published online: Jan 16, 2004
Published in print: Feb 2004
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.