Predicting Performance of Design-Build and Design-Bid-Build Projects
Publication: Journal of Construction Engineering and Management
Volume 130, Issue 1
Abstract
Design-build (DB) and design-bid-build (DBB) are two principal project delivery systems used in many countries. This paper reports on models constructed to predict performance of DB and DBB projects on 11 areas, using project-specific data collected from 87 building projects. The study included collecting, checking, and validating industry data, and the statistical development of multivariate linear regression models for predicting project performance. Robust models are developed to predict construction and delivery speeds of DB and DBB projects. Gross floor area of the project is the most significant factor affecting speed. Besides this, for DBB projects, contractors’ design ability, and adequacy of plant and equipment would ensure speedy completion of the projects. For DB projects, if the contract period is allowed to vary during tender evaluation, this would slow down the project. Robust models to predict turnover and system quality of DB projects are also constructed. A DB contractor’s track record is an important variable. They must have completed past projects to acceptable quality and have ability in financial, health and safety management.
Get full access to this article
View all available purchase options and get full access to this article.
References
Bennett, J., Pothecary, E., and Robinson, G. (1996). Designing and building a world-class industry, Center for Strategic Studies in Construction, Reading, U.K.
Building and Construction Authority (BCA). (2002). “Singapore building and construction authority home page.” Building and Construction Authority, 〈http://www.bca.gov.sg〉 (Apr. 19, 2002).
Chan, A. P. C., Ho, D. C. K., and Tam, C. M.(2001). “Design and build project success factors: Multivariate analysis.” J. Constr. Eng. Manage., 127(2), 93–100.
Hammersley, M., and Atkinson, P. (1983). Ethnography principles in practice, Routledge, London.
Janssens, D. E. L. (1991). Design-build explained, Macmillan, London.
Kaming, P. F., Olomolaiye, P. O., Holt, G. D., and Harris, F. C.(1997). “Factors influencing construction time and cost overruns on high-rise projects in Indonesia.” Constr. Manage. Econom., 15(1), 82–94.
Konchar, M., and Sanvido, V.(1998). “Comparison of U.S. project delivery systems.” J. Constr. Eng. Manage., 124(6), 435–444.
Kumaraswamy, M. M., and Chan, W. M.(1995). “Determinants of construction duration.” Constr. Manage. Econom., 13(2), 209–217.
Mohsini, R. A., and Davidson, C. H.(1992). “Determinants of performance in the traditional building process.” Constr. Manage. Econom., 10(4), 343–359.
Molenaar, K. R., and Songer, A. D.(1998). “Model for public sector design-build project selection.” J. Constr. Eng. Manage., 124(6), 467–479.
Newbold, P. (1991). Statistics for business and economics, 3rd Ed., Prentice-Hall, Englewood Cliffs, N.J.
U.S. Census Bureau. (2002). “Annual value of construction put in place in the United States: 1996–2000.” USA: Census Bureau, 〈http://www.census.pub/const/C30/tab100.txt〉 (Apr. 19, 2002).
Information & Authors
Information
Published In
Copyright
Copyright © 2004 American Society of Civil Engineers.
History
Received: May 15, 2002
Accepted: Nov 7, 2002
Published online: Jan 16, 2004
Published in print: Feb 2004
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.