TECHNICAL PAPERS
May 15, 2003

Implications of Even Flow Production Methodology for U.S. Housing Industry

Publication: Journal of Construction Engineering and Management
Volume 129, Issue 3

Abstract

Production building in the residential sector is often described as the portion of the construction industry that is most like the manufacturing sector. In modern tract construction in the United States, a small number of models are generally repeated several times in a relatively confined area, using specialized trade contractors to complete each phase of each home. Management of the handoffs between predecessor and successor trade contractors is therefore a critical component in the successful completion of a residential project. In order to bring more reliable planning to this process, a workflow-leveling strategy known as even flow production has come into use in the industry in recent years. Even flow production is a strategy intended to reduce the variability in the workflow for trade contractors in the process, thereby gaining production efficiencies. In practice, different operational definitions are in use. This paper describes a series of simulation experiments to identify the management implications of two common strategies (activity-based versus start-based). A special-purpose simulation template was built for the Simphony environment for this purpose. The pace chosen for the flow of activities was found to significantly affect the speed at which the subdivision was completed. The even flow strategy was found to affect the subdivision completion time only slightly, but to have a significant impact on workflow variability and management effort. Control of the pace of starts of only the first activity exhibited nearly the same degree of variability as if the pace of starts were matched to a sales pace.

Get full access to this article

View all available purchase options and get full access to this article.

References

AbouRizk, S. M., and Hajjar, D.(1998). “A framework for applying simulation in the construction industry.” Can. J. Civ. Eng., 25(3), 604–617.
AbouRizk, S. M., Ruwanpura, J. Y., Er, K. C., and Fernando, S. (1999). “Special purpose simulation template for utility tunnel construction.” Proc., Winter Simulation Conf., Institute of Electrical and Electronics Engineers, Piscataway, N.J., 948–955.
Caldeira, E.(1999). “Even flow construction.” Professional Builder, 64(16), 40.
Chrzanowski, Jr., E. N., and Johnston, D. W.(1986). “Application of linear scheduling.” J. Constr. Eng. Manage., 112(4), 476–491.
Goldratt, E. (1992). The goal, 2nd Ed., revised, North River, Great Barrington, Mass.
Hajjar, D., and AbouRizk, S. M. (1999). “Simphony: An environment for building special purpose construction simulation tools.” Proc., Winter Simulation Conf., Institute of Electrical and Electronics Engineers, Piscataway, N.J.
Halpin, D. W., and Riggs, L. S. (1992). Planning and analysis of construction operations, Wiley Interscience, New York.
Harmelink, D. J., and Rowings, J. E.(1998). “Linear scheduling model: Development of controlling activity path.” J. Constr. Eng. Manage., 124(4), 263–268.
Howell, G. A. (1999). “What is lean construction?” Proc., 7th Annual Conf., International Group for Lean Construction, Univ. of California, Berkeley, Calif., 1–10.
Johnston, D. W.(1981). “Linear scheduling method for highway construction.” J. Constr. Div., Am. Soc. Civ. Eng., 107(2), 247–261.
Joines, J. (1999). “Work flow variability.” MS thesis, Arizona State Univ., Tempe, Ariz.
Miles, R. S. (1998). “Alliance lean design/construct on a small high-tech project.” Proc., 6th Annual Conf., International Group for Lean Construction, Univ. of California, Berkeley, Calif., 1–27.
National Association of Home Builders Research Center (NAHBRC). (2000). “Even flow construction: The wave of the future.” Toolbase News, 5(1), 4.
Rappaport, B. A., and Cole, T. A. (2000). “1997 Economic census—Construction sector, special study, housing start statistics—A profile of the homebuilding industry.” U.S. Census Bureau, Manufacturing and Construction Division, 〈http://www.census.gov/const/www/index.html〉 (March 3, 2001).
Tommelein, I. D.(1998). “Pull-driven scheduling for pipe spool installation: Simulation of lean construction techniques.” J. Comput. Civ. Eng., 124(4), 279–288.
Tommelein, I. D., Riley, D., and Howell, G. A.(1999). “Parade game: Impact of work flow variability on trade performance.” J. Constr. Eng. Manage., 125(5), 304–310.
Willenbrock, J. H. (1998). Residential building design and construction, Prentice-Hall, Upper Saddle River, N.J.
Womack, J. P. (1992). The machine that changed the world: The story of lean production, Simon and Schuster, New York.
Womack, J. P. (1996). Lean thinking: Banish waste and create wealth in your corporation, Simon and Schuster, New York.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 129Issue 3June 2003
Pages: 330 - 337

History

Received: Jun 15, 2001
Accepted: Mar 19, 2002
Published online: May 15, 2003
Published in print: Jun 2003

Permissions

Request permissions for this article.

Authors

Affiliations

Howard H. Bashford
Associate Professor, Del E. Webb School of Construction, Arizona State Univ., P.O. Box 870204, Tempe, AZ 85287-0204.
Anil Sawhney
Associate Professor, Del E. Webb School of Construction, Arizona State Univ., P.O. Box 870204, Tempe, AZ 85287-0204.
Kenneth D. Walsh
AGC–Paul S. Roel Chair for Construction Engineering and Management, Dept. of Civil and Environmental Engineering, San Diego State Univ., 5500 Campanile Dr., San Diego, CA 92182-1324.
Kunal Kot
Graduate Student, Del E. Webb School of Construction, Arizona State Univ., P.O. Box 870204, Tempe, AZ 85287-0204.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share