Challenges in Line-of-Balance Scheduling

Publication: Journal of Construction Engineering and Management
Volume 128, Issue 6

Abstract

The line-of-balance (LOB) method of scheduling is well suited to projects that are composed of activities of a linear and repetitive nature. The objective of this study is to set down the basic principles that can be used in the development of a computerized LOB scheduling system that overcomes the problems associated with existing systems and creates solutions to problems encountered in the implementation of repetitive-unit construction. The challenges associated with LOB scheduling include developing an algorithm that handles project acceleration efficiently and accurately, recognizing time and space dependencies, calculating LOB quantities, dealing with resource and milestone constraints, incorporating the occasional nonlinear and discrete activities, defining a radically new concept of criticalness, including the effect of the learning curve, developing an optimal strategy to reduce project duration by increasing the rate of production of selected activities, performing cost optimization, and improving the visual presentation of LOB diagrams.

Get full access to this article

View all available purchase options and get full access to this article.

References

Arditi, D., and Albulak, M. Z.(1986). “Line-of-balance scheduling in pavement construction.” J. Constr. Eng. Manage., 112(3), 411–424.
Arditi, D., and Psarros, M. K. (1987). “SYRUS—System for repetitive unit scheduling.” Proc., NORDNET/INTERNET/PMI’87 Conf. on Project Management, Verkefnastjomun, the Icelandic Project Management Society, Reykjavik, Iceland.
Arditi, D., Tokdemir, O. B., and Suh, K.(1999). “Effect of learning on line-of-balance scheduling.” Int. J. Proj. Manage., 15(5), 265–277.
Ashley, D. B.(1980). “Simulation of repetitive-unit construction.” J. Constr. Div., Am. Soc. Civ. Eng., 106(2), 185–194.
Borcherding, J. D. (1989). “Factors that have an adverse effect on productivity,” Discussion Paper of Construction Operation, University of Texas at Austin, Austin, Tex.
Harmelink, D. J., and Rowings, J. E.(1998). “Linear scheduling model: Development of controlling activity path.” J. Constr. Eng. Manage., 124(4), 263–268.
Harris, R. B., and Ioannou, P. G.(1998). “Scheduling projects with repeating activities.” J. Constr. Eng. Manage., 124(4), 269–278.
Hegazy, T., Moselhi, O., and Fazio, P., (1993). “BAL: An anlgorithm for scheduling and control of linear projects.” AACE Transactions, Morgantown, W. Va., 8.1–8.14.
Lumsden, P. (1968). The line-of-balance method, Pergamon, Tarrytown, N.Y.
Lutz, J. D., and Halpin, D. W. (1992). “Analyzing linear construction operations using simulation and line-of-balance.” Proc., Transportation Research Board 71st Annual Meeting, Transportation Research Record 1351, Transportation Research Board, National Academy Press, Washington, D.C., 48–56.
Lutz, J. D., Halpin, D. W., and Wilson, J. R.(1994). “Simulation of learning development in repetitive construction.” J. Constr. Eng. Manage., 120(4), 753–773.
Moselhi, O., and El-Rayes, K.(1993). “Scheduling of repetitive projects with cost optimization.” J. Constr. Eng. Manage., 119(4), 681–697.
Psarros, M. E. (1987). “SYRUS: A program for repetitive projects.” Master’s thesis, Dept. of Civil Engineering, Illinois Institute of Technology, Chicago.
“Scheduled Overtime Effect on Construction Projects.” (1980). A Construction Industry Cost Effectivenes Task Force Report, The Business Roundtable, New York.
Senouci, A. B., and Eldin, N. N.(1996). “Dynamic programming approach to scheduling of nonserial linear project.” J. Comput. Civ. Eng., 10(2), 106–114.
Srigungvarl, P. (1992). “A knowledge-based integrated system for line-of-balance applications in high-rise building construction.” Doctoral thesis, Div. of Structural Engineering and Construction, Asian Institute of Technology, Bangkok, Thailand.
Thabet, W. Y., and Beliveau, Y. J.(1994). “HVLS: Horizontal and vertical logic scheduling for multistory projects.” J. Constr. Eng. Manage., 120(4), 875–892.
Wang, C., and Huang, Y.(1998). “Controlling activity interval times in LOB scheduling.” Constr. Manage. Econom., 16(1), 5–16.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 128Issue 6December 2002
Pages: 545 - 556

History

Received: Oct 24, 2000
Accepted: Nov 28, 2001
Published online: Nov 15, 2002
Published in print: Dec 2002

Permissions

Request permissions for this article.

Authors

Affiliations

David Arditi, M.ASCE
Professor, Illinois Institute of Technology, Dept. of Civil and Architectural Engineering, Chicago, IL 60616.
Onur B. Tokdemir
IT Manager, McDonough Associates, 130 East Randolph St., Suite 1000, Chicago, IL 60601-6214.
Kangsuk Suh
Professor, Honam Univ., Dept. of Civil Engineering, Honam, South Korea.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share