Identification and Resolution of Work Space Conflicts in Building Construction
Publication: Journal of Construction Engineering and Management
Volume 128, Issue 4
Abstract
Numerous workers, equipment, material, temporary facilities, as well as permanent structures share the limited space during construction. Since space constraints may affect productivity and the critical path, it is essential to organize the available space efficiently and minimize space conflicts. This study considers space availability due to time and scheduling, productivity loss due to space constraints and path interference, as well as the possibility of alternative space to resolve these conflicts and optimize space usage. Herein, computer-aided design is integrated with scheduling software for the dynamic identification of space conflicts on the jobsite. Follow-up supplemental decision criteria are then provided for conflict analysis and resolution. A prototype decision support system that combines the criteria was developed to solve this significant and complex problem more efficiently and precisely. A case study demonstrates the use and development of this system, which is very helpful to engineers and project managers.
Get full access to this article
View all available purchase options and get full access to this article.
References
Akinci, B., and Fischer, M. (1998). “Time-space conflict analysis based on 4D production models.” Proc., Int. Computing Congress, ASCE, Reston, Va., 342–353.
Akinci, B., Fischer, M., and Zabelle, T. (1998). “A proactive approach for reducing non-value adding activities due to time-space conflicts.” Proc., 8th Annual Conf. of the Int. Group for Lean Construction, 1–16.
Cheng, M. Y., and O’Connor, J. T.(1996). “ArcSite: Enhanced GIS for construction site layout.” J. Constr. Eng. Manage., 122(4), 329–336.
Hegazy, T., and Elbeltagi, E.(1999). “EvoSite: Evolution-based model for site layout planning.” J. Comput. Civ. Eng., 13(3), 198–206.
Li, H., and Love, P. E. D.(1998). “Site-level facilities layout using genetic algorithms.” J. Comput. Civ. Eng., 12(4), 227–231.
Lin, K. L., and Haas, C. T.(1996). “An interactive planning environment for critical operations.” J. Constr. Eng. Manage., 122(3), 212–222.
Riley, D. R. (1998). “4D space planning specification development for construction work spaces.” Proc., Int. Computing Congress, ASCE, Reston, Va., 354–363.
Riley, D. R., and Sanvido, V. E.(1995). “Patterns of construction-space use in multistory buildings.” J. Constr. Eng. Manage., 121(4), 464–473.
Riley, D. R., and Sanvido, V. E.(1997). “Space planning method for multistory building construction.” J. Constr. Eng. Manage., 123(2), 171–180.
Thabet, W. Y., and Beliveau, Y. J.(1994). “Modeling work space to schedule repetitive floors in multistory buildings.” J. Constr. Eng. Manage., 120(1), 96–116.
Tommelein, I. D., and Zouein, P. P.(1993). “Interactive dynamic layout planning.” J. Constr. Eng. Manage., 119(2), 266–287.
Tserng, H. P., Veeramani, D., Kunigahalli, R., and Russel, J. S.(1996). “OPSALC: A computer-integrated operation planning system for autonomous land fill compaction.” J. of Automation in Constr., 5(1), 39–50.
Varghese, K., and O’Connor, J. T.(1995). “Routing large vehicles on industrial construction sites.” J. Constr. Eng. Manage., 121(1), 1–12.
Yeh, I.(1995). “Construction-site layout using annealed neural network.” J. Comput. Civ. Eng., 9(3), 201–208.
Zouein, P. P., and Tommelein, I. D.(1999). “Dynamic layout planning using a hybrid incremental solution method.” J. Constr. Eng. Manage., 125(6), 400–408.
Information & Authors
Information
Published In
Copyright
Copyright © 2002 American Society of Civil Engineers.
History
Received: Jan 23, 2001
Accepted: Aug 7, 2001
Published online: Jul 15, 2002
Published in print: Aug 2002
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.