Construction Delay Computation Method
Publication: Journal of Construction Engineering and Management
Volume 127, Issue 1
Abstract
Delay is one of the most common problems in the construction industry. This paper presents a method for computing activity delays and assessing their contributions to project delay. The method consists of a set of equations, which can be easily coded into a computer program that allows speedy access to project delay information and activity contributions. The proposed method contrasts the as-planned and as-built schedules. It is not based on critical path analyses; therefore, it does not require the calculation or updating of the critical path, and it is even not necessary to update the as-planned schedule, as required by the traditional delay analysis methods. The results calculated from the proposed method include various variations of activity schedules and their contributions (in days) to the overall project delay. They provide an objective baseline for determining responsibilities of delays. The method can be integrated into any delay analysis system to further improve and automate the construction delay analysis process. Practical examples are used to illustrate the computation mechanism.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Abudayyeh, O. Y. ( 1997). “A multimedia construction delay management system.” Microcomp. in Civ. Engrg., 12, 183–192.
2.
Alkass, S., Mazerolle, M., Tribaldos, E., and Harris, F. ( 1995). “Computer aided construction delay analysis and claims preparation.” Constr. Mgmt. and Economics, 13, 335–352.
3.
Arditi, D., and Robinson, M. A. ( 1995). “Concurrent delays in construction litigation.” Cost Engrg., 37(7), 20–30.
4.
Assaf, S. A., Al-Khalil, M., and Al-Hazmi, M. (1995). “Causes of delay in large building construction projects.”J. Mgmt. in Engrg., ASCE, 11(2), 45–50.
5.
Battikha, M., and Alkass, S. ( 1994). “Cost-effective delay analysis technique.” Trans., Am. Assn. of Cost Engrs., Morgantown, W.Va.
6.
Diekmann, J. E., and Kim, M. P. (1992). “SuperChange: Expert system for analysis of changes claims.”J. Constr. Engrg. and Mgmt., ASCE, 118(2), 399–411.
7.
Kallo, G. G. ( 1996). “The reliability of critical path method (CPM) techniques in the analysis and evaluation of delay claims.” Cost Engrg., 38(5), 35–37.
8.
Knoke, J. R., and Jentzen, G. H. ( 1994). “Facilitate delay claim with as-built schedule databases.” Computing in civil engineering, K. Khozeimeh, ed., ASCE, Reston, Va., 2104–2111.
9.
Kraiem, Z. I., and Diekmann, J. E. (1987). “Concurrent delays in construction projects.”J. Constr. Engrg. and Mgmt., ASCE, 113(4), 591–602.
10.
Logcher, R. D. (1989). “Discussion of `Concurrent delays in construction projects.' ”J. Constr. Engrg. and Mgmt., ASCE, 115(2), 335–337.
11.
Schumacher, L. ( 1995). “Quantifying and apportioning delay on construction project.” Cost Engrg., 37(2), 11–13.
12.
Shi, J., and Deng, Z. ( 2000). “Object-oriented resource-based planning and control method.” Int. J. Proj. Mgmt., in press.
13.
Trauner, T. J. ( 1990). Construction delays, R. S. Means, Kingston, Mass.
14.
Yates, J. K. (1993). “Construction decision support system for delay analysis.”J. Constr. Engrg. and Mgmt., ASCE, 119(2), 226–244.
15.
Zack, J. G., Jr. (1993). “ `Claimsmanship': Current perspective.”J. Constr. Engrg. and Mgmt., ASCE, 119(3), 480–497.
16.
Zack, J. G. ( 1997). “Claim prevention: Offence versus defense.” Cost Engrg., 39(7), 23–28.
Information & Authors
Information
Published In
History
Received: Oct 20, 1999
Published online: Feb 1, 2001
Published in print: Feb 2001
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.