Development of an Experience Database for Truck Loading Operations

Publication: Journal of Construction Engineering and Management
Volume 126, Issue 3

Abstract

Planning and estimating earthmoving operations rely on the ability to collect field data and analyze operations. Two recent developments have dramatically changed the methods used and the results obtained in this process. The first relates to data collection where instrumentation placed on loading and hauling units can replace stopwatches as a primary source of data. The second relates to analysis where simulation techniques can replace deterministic job studies. This paper reviews these developments and shows that data collection and analysis techniques must complement each other. The use of stopwatches may satisfy the requirements of job studies but does not satisfy those of simulation. Simulation requires knowledge of the variance associated with the activity duration. Obtaining it from a few data points collected using stopwatches is frequently statistically incomplete. Simulation requires a continuous form of data collection to support its modeling process and, hence, offers new challenges to the data collection methods. Instrumented vehicles present a viable opportunity to collect continuous field data. However, the data collected using the instrumented vehicles must be characterized in such a way to reflect the actual job conditions under which they were recorded. As a result, this research extends the concept of data collection to building an experience database. Field data and visualization techniques are presented in this paper to illustrate the concept of the experience database.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
AbouRizk, S. M., and Halpin, D. W. ( 1992a). “Modeling input data for construction simulation.” Proc., Computing in Civ. Engrg. and Geographic Information Sys. Symp., 1147–1154.
2.
AbouRizk, S. M., and Halpin, D. W. (1992b). “Statistical properties of construction duration data.”J. Constr. Engrg. and Mgmt., ASCE, 118(3), 525–544.
3.
Arditi, D., Kale, S., and Tanghar, M. (1997). “Innovation in construction equipment and its flow into the construction industry.”J. Constr. Engrg. and Mgmt., ASCE, 123(4), 371–378.
4.
Benjamin, J. R., and Cornell, C. A. ( 1970). Probability, statistics, and decision for civil engineers. McGraw-Hill, New York.
5.
Björnsson, H. C., and Sagert, P. ( 1994). “Multimedia based system for analyzing production organizations.” Proc., Computing in Civ. Engrg., Vol. 2, ASCE, New York, 1405–1411.
6.
Caterpillar performance handbook. (1997). 27th Ed., Caterpillar, Peoria, Ill.
7.
Day, D. A., and Benjamin, N. B. H. ( 1991). Construction equipment guide. 2nd Ed., Wiley, New York.
8.
Gransberg, D. D. (1996). “Optimizing haul unit size and number based on loading facility characteristics.”J. Constr. Engrg. and Mgmt., ASCE 122(3), 248–253.
9.
Gransberg, D. G. ( 1998). “A review of methods to estimate haul fleet production.” Cost Engrg., 40(3), 31–35.
10.
Halpin, D. W. (1977). “CYCLONE—Method for modeling job site processes.”J. Constr. Div., 103(3), 489–499.
11.
Halpin, D. W., and Riggs, L. S. ( 1992). Planning and analysis of construction operations. Wiley, New York.
12.
Johnson, N. L., Kotz, S., and Balakrishnan, N. ( 1994). Continuous univariate distribution, Vol. 1, Wiley, New York.
13.
Kannan, G. ( 1999). “A methodology for the development of a production experience database for earthmoving operations using automated data collection.” PhD dissertation, Virginia Polytechnic Institute and State University, Blacksburg, Va.
14.
Kannan, G., and Vorster, M. C. ( 1998). “Automated data collection for earthwork estimating.” Proc., Int. Conf. on Computing in Civ. Engrg., K. C. Wang, ed., ASCE, Reston, Va., 457–465.
15.
Kannan, G., Vorster, M. C., and Martinez, J. C. ( 1999). “Developing the statistical parameters for simultaneous variation in final payload and total load time.” Proc., Winter Simulation Conf., San Diego, Calif., 1016–1022.
16.
Knoke, J. R., Liu, L. Y., and Spittler, J. R. ( 1993). “Square foot range estimating.” 1993 Trans. of Am. Assn. of Cost Engrs., Morgantown, W.V.
17.
Latham, G. P., and Baldes, J. J. ( 1975). “The practical significance of Locke's theory of goal setting.” J. Appl. Psychology, February, 122–124.
18.
Law, A. M., and Kelton, D. K. ( 1991). Simulation modeling and analysis, 2nd Ed., McGraw-Hill, New York.
19.
MacMillan, R. A. ( 1994). “New developments in mining truck electronics.” Min. Engrg., June, 513–515.
20.
McCahill, D. F., and Bernold, L. E. (1993). “Resource-oriented modeling and simulation in construction.”J. Constr. Engrg. and Mgmt., ASCE, 119(3), 590–606.
21.
Martinez, J. C., and Ioannou, P. G. (1999). “General-purpose systems for effective construction simulation.”J. Constr. Engrg. and Mgmt., ASCE, 125(4), 265–276.
22.
Oglesby, C. H., Parker, H. W., and Howell, G. A. ( 1989). Productivity improvement in construction. McGraw-Hill, New York.
23.
Paulson, B. C., Jr. ( 1995). Computer applications in construction. McGraw-Hill, New York.
24.
Paulson, B. C., Chan, W. T., and Koo, C. C. (1987). “Construction operations simulation by microcomputer.”J. Constr. Engrg. and Mgmt., ASCE, 113(2), 302–314.
25.
Schexnayder, C., Weber, S. L., and Brooks, B. T. (1999). “Effect of truck payload weight on production.”J. Constr. Engrg. and Mgmt., ASCE, 125(1), 1–7.
26.
Sotoodeh, H., and Paulson, B. C. ( 1989). “Sensors and expert systems in production optimization of earthmoving scrapers.” Proc., 6th Conf. on Computing in Civ. Engrg., Thomas O. Branwell Jr., ed., ASCE, Reston, Va.
27.
Stat:Fit user's guide. (1997). Geer Mountain Software Corp., Inc.
28.
Stewart, L. ( 1998). “How to get value from on-board computers.” Constr. Equipment, January, 45–50.
29.
Touran, A. ( 1981). “Construction operations data acquisition and processing via time-lapse photography interfaced into a minicomputer.” PhD thesis, Stanford University, Stanford, Calif.
30.
Tufte, E. R. ( 1983). The visual display of quantitative information. Graphic Press, Cheshire, Conn.
31.
Woods, W. R., and Kranso, D. S. ( 1994). “A thousand points of data.” Civ. Engrg., ASCE, 64(6), 54–56.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 126Issue 3May 2000
Pages: 201 - 209

History

Received: Jan 4, 1999
Published online: May 1, 2000
Published in print: May 2000

Permissions

Request permissions for this article.

Authors

Affiliations

Members, ASCE
Site Simulation Specialist, Volvo Construction Equipment, One Volvo Dr., Asheville, NC 28803; formerly, Volvo Postdoctoral Fellow, Charles E. Via Jr. Dept. of Civ. Engrg., Virginia Polytechnic Inst. and State Univ., Blacksburg, VA 24061-0105. E-mail: [email protected]
David H. Burrows Prof. of Constr. Engrg. and Mgmt., Charles E. Via Jr. Dept. of Civ. Engrg., Virginia Polytechnic Inst. and State Univ., Blacksburg, VA. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share