Models for Assessing Hoisting Times of Tower Cranes
Publication: Journal of Construction Engineering and Management
Volume 125, Issue 6
Abstract
Accurate assessment of hoisting times is crucial for planning construction activities. The objective of this paper is to develop reasonably accurate prediction models to assess hoisting times of tower cranes. Twenty variables considered attributable to the hoisting time are evaluated. In modeling the hoisting movements, the upward hoisting and downward hoisting of a hoisting cycle are classified as the supply hoisting and the return hoisting. Multiple regression techniques are used for analyzing and building up the models. The hoisting of precast concrete facades and concrete skips are studied. The significance of the variables are discussed and compared. Finally, the paper presents an example of applying the models.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Al-Tabtabai, H., Kartam, N., Flood, I., and Alex, A. P. (1997). “Expert judgement in forecasting construction project completion.” Engrg., Constr. and Archit. Mgmt., 4(4), 271–293.
2.
Anson, M., and Wang, S. Q. (1994). “Hong Kong performance yardsticks for concrete placing during building construction.” Trans., Hong Kong, August 1994, 1–18.
3.
Beliveau, Y., Dixit, S., and Dal, T. (1993). “Dynamic damping of payload motion.”J. Constr. Engrg. and Mgmt., ASCE, 119(3), 631–644.
4.
Chan, D. W. M., and Kumaraswamy, M. M. (1995). “A study of the factors affecting construction duration in Hong Kong.” Constr. Mgmt. and Economics, 13(4), 319–333.
5.
Choi, C. W., and Harris, F. C. (1989). “A model for determining optimum crane position.” Proc., Inst. of Civ. Engrs., 90, June, 627–634.
6.
Dickie, D. E. (1981). Crane handbook. Construction Safety Assoc. of Ontario, Toronto, Ont., 288–292.
7.
Furusaka, S., and Gray, C. (1984). “A model for the selection of the optimum crane for construction sites.” Constr. Mgmt. and Economics, 2, 157–176.
8.
Gray, C., and Little, J. (1985). “A systematic approach to the selection of an appropriate crane for a construction site.” Constr. Mgmt. and Economics, 3, 121–144.
9.
Rodriguez-Ramos, W. E., and Francis, R. L. (1983). “Single crane location optimisation.”J. Constr. Engrg. and Mgmt., ASCE, 109(4), 387–397.
10.
Zhang, P., Harris, F. C., and Olonolaiye, P. O. (1996). “A computer-based model for optimizing the location of a single tower crane.” Build. Res. and Info., 24(2), 113–123.
Information & Authors
Information
Published In
History
Received: Jun 17, 1997
Published online: Dec 1, 1999
Published in print: Dec 1999
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.