TECHNICAL PAPERS
Sep 1, 1999

Optimal Allocation of Construction Planning Resources

Publication: Journal of Construction Engineering and Management
Volume 125, Issue 5

Abstract

Efficient allocation of resources for construction planning activities requires construction planning resource requirements to be determined on a cost-effective and value-adding basis. However, although some research studies have indicated that increasing resource allocations to construction planning activities will lead to improved project performance, other research studies have indicated that investing in construction planning beyond an optimum point will lead to a deterioration in project performance. This study explored the concept of optimal planning of construction projects by examining 52 building projects undertaken in Australia. The relationships between planning input (ratio of planning costs to total project costs) and the probabilities of achieving poor performance and good performance were modeled using logistic, linear, and curvilinear regression analyses. A probable optimum planning input based on the sample studied was derived. It is suggested that any additional planning efforts beyond this optimum point would be essentially wasted because the additional planning costs would not achieve any savings in project cost but merely add to the overhead costs and therefore increase the overall project cost. A model for optimal planning is presented and discussed.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Ackoff, R. L. (1970). A concept of corporate planning. Wiley, New York.
2.
Arditi, D. (1985). “Construction productivity improvement.”J. Constr. Engrg. and Mgmt., ASCE, 111, 1, 1–14.
3.
Ashley, D. B., Lurie, C. S., and Jaselskis, E. J. (1987). “Determinants of construction project success.” Proj. Mgmt. J., 18(2), 69–79.
4.
Ballard, G., and Howell, G. (1998). “Shielding production: Essential step in production control.”J. Constr. Engrg. and Mgmt., ASCE, 124(1), 11–17.
5.
BCIS. (1988). “Tender sum/final account study.” BCIS News, Building Cost Information Service, Royal Institution of Chartered Surveyors, London, (25).
6.
Erskine-Murray, P. E. ( 1972). “Construction planning—Mainly a question of how.” Occasional Paper No. 2, The Institute of Building, London.
7.
Faniran, O. O., Oluwoye, J. O., and Lenard, D. (1994a). “Effective construction planning.” Constr. Mgmt. and Economics, 12, 485–499.
8.
Faniran, O. O., Oluwoye, J. O., and Lenard, D. (1994b). “A conceptual process of construction planning for meeting client objectives.” J. Real Estate and Constr., Singapore, 4(1), 48–57.
9.
Faniran, O. O., Oluwoye, J. O., and Lenard, D. (1998). “Interactions between construction planning and influence factors.”J. Constr. Engrg. and Mgmt., ASCE, 124(4), 245–256.
10.
Firdman, H. E. (1991). Strategic information systems: Forging the business and technology alliance. McGraw-Hill, New York.
11.
Hamilton, M. R., and Gibson, G. E. (1996). “Benchmarking preproject planning efforts.”J. Mgmt. in Engrg., ASCE, 12(2), 25–33.
12.
Hosmer, D. W., and Lemeshow, S. (1989). Applied logistic regression. Wiley, New York.
13.
Jaselskis, E. J., and Ashley, D. B. (1991). “Optimal allocation of project management resources for achieving success.”J. Constr. Engrg. and Mgmt., ASCE, 117(2), 321–340.
14.
Kudla, R. J. (1976). “Elements of effective corporate planning.” Long Range Plng., August, 82–93.
15.
Laufer, A., and Cohenca, D. (1990). “Factors affecting construction planning outcomes.”J. Constr. Engrg. and Mgmt., ASCE, 116(1), 135–156.
16.
Laufer, A., and Tucker, R. L. (1987). “Is construction project planning really done its job? A critical examination of focus, role and processes.” Constr. Mgmt. and Economics, 5, 243–266.
17.
Neale, R. H., and Neale, D. E. (1989). Construction planning. Thomas Telford, London.
18.
Norusis, M. J. (1994). SPSS Advanced Statistics 6.1. SPSS Inc., Chicago.
19.
Soetrick, F., and Foster, P. (1976). “Research into time cost performance of building contracts.” Rep. No. R22. Building Research Association of New Zealand, Wellington, New Zealand.
20.
Syal, M. G., Grobler, F., Willenbrock, J. H., and Parfitti, M. K. (1992). “Construction project planning process model for small-medium builders.”J. Constr. Engrg. and Mgmt., ASCE, 118(4), 651–666.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 125Issue 5September 1999
Pages: 311 - 319

History

Received: Nov 3, 1998
Published online: Sep 1, 1999
Published in print: Sep 1999

Permissions

Request permissions for this article.

Authors

Affiliations

Lect. in Constr. Mgmt., School of Arch. and Build., Deakin Univ., Geelong VIC 3217, Australia. E-mail: [email protected]
Sr. Lect. in Constr. Mgmt., School of Arch. and Build., Deakin Univ., Geelong VIC 3217, Australia.
Assoc. Prof. of Constr. Mgmt., Dept. of Build. and Real Estate, Hong Kong Polytechnic Univ., Hung Hom, Kowloon, Hong Kong.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share