Impact of Change Orders on Labor Efficiency for Electrical Construction
This article has a reply.
VIEW THE REPLYPublication: Journal of Construction Engineering and Management
Volume 125, Issue 4
Abstract
Change orders are a source of many disputes in today's construction industry. The issue at hand is whether or not the execution of change orders work has a negative impact on overall labor efficiency on a construction project. Previous literature demonstrates evidence that change orders affect labor efficiency. Attempts have been made to quantify these impacts by many researchers, with limited success. Using the electrical construction industry, a research study has been conducted to quantify the impacts of change orders on labor efficiency. In this paper, results of hypothesis testing and regression analysis are presented. A linear regression model that estimates the loss of efficiency, based on a number of independent variables, is also presented. The independent variables used in this model are (1) qualitative and quantitative criteria used to determine whether projects are impacted by changes or not; (2) the estimate of change order hours for the project as a percentage of the original estimate of work hours; (3) the estimate of change order hours for the project; and (4) the total number of years that the project manager had worked in the construction industry. Additional projects were used to validate the model, with an average error rate of 5%. The results of this research study are useful for owners, construction managers, general contractors, and electrical specialty contractors, because they provide a means to estimate the impact of a change order under certain project conditions. This research also identifies factors, which, when understood and effectively managed, may be used to mitigate the impact of a change order on project costs and efficiency.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Barrie, B. S., and Paulson, B. C. (1992). Professional construction management, 3rd Ed., McGraw-Hill, New York.
2.
Fisk, E. R. (1992). Construction project administration, 4th Ed., Prentice-Hall, Englewood Cliffs, N.J.
3.
Hanna, A. S., Russell, J. S., and Bruggink, M. J. (1998). “An investigation into the impacts of change orders on labor efficiency in the electrical construction industry.” Tech. Rep., Electrical Contracting Foundation.
4.
Ibbs, C. W., and Allen, W. E. ( 1995). “Quantitative impacts of project change.” Source Document 108, Constr. Industry Inst., University of Texas at Austin, Austin, Tex.
5.
Leonard, C., Moselhi, O., and Fazio, P. (1991). “Impact of change orders on construction productivity.” Can. J. Civ. Engrg., Ottawa, 18, 484–492.
6.
McDonald, P., and Baldwin, G. (1989). Builders and contractors handbook of construction claims. Prentice Hall, Englewood Cliffs, N.J.
7.
Means illustrated construction dictionary. (1991). R. S. Means Co., Inc., Construction Consultants and Publishers, Kingston, Mass.
8.
Russell, J. S., and Jaselskis, E. J. (1992). “Quantitative study of contractor evaluation programs and their impact.”J. Constr. Engrg. and Mgmt., ASCE, 118(3), 612–624.
9.
Thomack, D. J. ( 1996). “The impact of change orders on electrical construction labor efficiency.” M.S. Civil and Envir. Engr. thesis, University of Wisconsin–Madison, Madison, Wis.
10.
Zink, D. A. (1986). “The measured mile: Proving construction inefficiency.” Cost Engrg., 28(4), 19–21.
11.
Zink, D. A. (1990). “Impacts and construction inefficiency.” Cost Engrg., 32(11), 21–23.
Information & Authors
Information
Published In
History
Received: Mar 30, 1998
Published online: Aug 1, 1999
Published in print: Aug 1999
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.