TECHNICAL PAPERS
Mar 1, 1998

Simulation-Based Scheduling with Continuous Activity Relationships

Publication: Journal of Construction Engineering and Management
Volume 124, Issue 2

Abstract

This paper discusses an approach that was developed to enable effective use of systems simulation in the scheduling of construction projects. The approach was implemented in a software program named SimCon, which enhances current simulation methods through the use of continuous production links for activities that comprise a project. The continuous production links provide construction managers with a flexible representation of activity sequencing. The procedure builds on existing CYCLONE fundamentals through new constructs to connect processes in a simulation-based project plan. These constructs are used to simplify the cyclic interprocess relationships, standardize the techniques for logical linking of simulation processes, provide a better estimate of progress, and model a continuous and smooth flow of construction. Various scheduling alternatives are modeled without the need to change activity sequencing, as is required in current scheduling systems. Examples from an actual construction project show the advantages of the continuous production links. The concepts are implemented using a prototype computer system that integrates object-oriented concepts, event-driven programming, a relational database, and a simulation system.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Carr, R. I., and Meyer, W. L.(1974). “Planning construction of repetitive building units.”J. Constr. Div., ASCE, 100(3), 403–412.
2.
Chehayeb, N. N. (1995). “Simulation-based project control,” PhD/thesis, Univ. of Alberta, Edmonton, Alberta, Canada.
3.
Fiedler, K. (1985). “Special conditions for time scheduling of building modernization projects.”Proc., 8th Conf. on Internet. Dutch Proj. Mgmt. Soc., Vol. 2, 461–468.
4.
Halpin, D. W. (1973). “An investigation of the use of simulation networks for modeling construction operations,” PhD thesis, Univ. of Illinois at Urbana-Champaign, Ill.
5.
Halpin, D. W. (1990a). MicroCYCLONE system manual. Div. of Constr. Engrg. and Mgmt., Purdue Univ., West Lafayette, Ind.
6.
Halpin, D. W. (1990b). MicroCYCLONE user's manual. Div. of Constr. Engrg. and Mgmt., Purdue Univ., West Lafayette, Ind.
7.
Halpin, D. W., and Riggs, L. S. (1992). Planning and analysis of construction operations, 2nd Ed., John Wiley & Sons, Inc., New York, N.Y.
8.
Halpin, D., and Woodhead, R. (1976). Planning and analysis of construction operations, 1st Ed., John Wiley & Sons, Inc., New York, N.Y.
9.
Hendrickson, C., Martinelli, D., and Rehak, D.(1987). “Hierarchical rule-based activity duration estimation.”J. Constr. Div., ASCE, 113(2), 288–301.
10.
Huang, R., Grigoriadis, A. M., and Halpin, D. W. (1994). “Simulation of cable-stayed bridges using DISCO.”Proc., 1994 Winter Simulation Conf., 1130–1136.
11.
Jennett, E. (1983). “Experience with and evaluation of critical path methods.”Projet management: Techniques, applications and managerial issues, E. W. Davis, ed., Inst. of Industrial Engrs., Atlanta, Ga., 156–186.
12.
Khisty, C. J. (1970). “The application of the `line of balance' technique to the construction industry.”Indian Concrete J., July, 297–320.
13.
Liu, L. Y., and Ioannou, P. G. (1992). “Graphical object-oriented system for construction process modeling.”Proc., 8th Conf. on Computing in Civ. Engrg., ASCE, Reston, Va., 1139–1146.
14.
Lumsden, P. (1968). The line of balance method. Pergamon Press, London, England.
15.
MacCrimmon, K. R., and Ryavec, C. A.(1964). “An analytical study of the PERT assumptions.”Operations Res., 12, 16–38.
16.
McCahill, D. F., and Bernold, L. E.(1993). “Resource-oriented modeling and simulation in construction.”J. Constr. Engrg. and Mgmt., ASCE, 119(3), 590–606.
17.
Microsoft. (1993a). Microsoft Access programmer's guide, Version 2.0, Microsoft Corp., Redmond, Wash.
18.
Microsoft. (1993b). Microsoft Visual basic programmer's guide, Version 3.0. Microsoft Corp., Redmond, Wash.
19.
Microsoft. (1993c). Microsoft Visual C++ User's guide, Version 1.0. Microsoft Corp., Redmond, Wash.
20.
Moselhi, O. (1993). “Applied earned value for project control.”CIB W-65, Trinidad, W.I., September, 869–879.
21.
O'Brien.(1975). “VPM scheduling for high-rise buildings.”J. Constr. Engrg. and Mgmt., 101(4), 895–905.
22.
Odeh, A. M., Tommelein, I. D., and Carr, R. I. (1992). “Knowledge-based simulation of construction plans.”Proc., 8th Conf. on Computing in Civ. Engrg., ASCE Reston, Va., 1042–1049.
23.
Paulson, B. C., Jr., Chan, and W. T., and Koo(1987). “Construction operations simulation by microcomputer.”J. Constr. Engrg. and Mgmt., ASCE, 113(2), 302–314.
24.
Pritsker, A. A. B., Sigal, C. E., and Hammesfahr, R. D. J. (1989). SLAM II: Network models for decision support. Prentice-Hall Inc., Englewood Cliffs, N.J.
25.
Pultar, M.(1990). “Progress-based construction scheduling.”J. Constr. Engrg. and Mgmt., ASCE, 116(4), 670–688.
26.
Rahbar, F. F., and Rowing, J. E. (1992). “Repetitive activity scheduling process.”Proc., AACE 36th Annu. Mtg., Orlando, Fla., 0.5.1–0.5.8.
27.
Russell, A. D., and Wong, W. C. M.(1993). “A new generation of planning structures.”J. Constr. Engrg. and Mgmt., ASCE, 119(2), 196–214.
28.
Sarraj, Z. M. A. (1990). Formal development of line-of-balance technique.”J. Constr. Engrg. and Mgmt., ASCE, 116(4), 689–704.
29.
Sawhney, A. (1994). “Simulation-based planning for construction.” PhD thesis, Univ. of Alberta, Edmonton, Alberta, Canada.
30.
Shi, J. (1995). “Automated modeling and optimization for construction simulation.” PhD thesis, Univ. of Alberta, Edmonton, Alberta, Canada.
31.
Shoderbek, P. P., and Digman, L. A.(1967). “Third Generation PERT/LOB.”Harvard Business Rev., 45(5), 100–110.
32.
Suhail, S. A.(1993). “Out of logic progress.”Cost Engrg., Am. Assn. of Cost Engrs., 35(4), 23–28.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 124Issue 2March 1998
Pages: 107 - 115

History

Published online: Mar 1, 1998
Published in print: Mar 1998

Permissions

Request permissions for this article.

Authors

Affiliations

Nader N. Chehayeb
Constr. Mgmt. Engr., Dar Al-Handasah Engrg., Beirut, Lebanon.
Simaan M. AbouRizk, Associate Member, ASCE
Prof., Dept. of Civ. Engrg., Univ. of Alberta, Edmonton, Alberta, Canada T6G 2G7.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share