Simplified Simulation System for Construction Projects

Publication: Journal of Construction Engineering and Management
Volume 124, Issue 1

Abstract

A new scheduling system based on statistical simulation is discussed. The system, called project-integrated cyclic analysis of serial system operations (PICASSO), blends and enhances two existing techniques, namely, the critical path method (CPM) and the cyclic operations network (CYCLONE) simulation. A PICASSO project diagram consists of a circle for each modeled resource, a box for each repeated activity, and arrows connecting these elements. The elements can be cycled as many times as required; thus each repetitive activity chain needs to be depicted only once. The massiveness of CPM and similar network techniques when applied to model repetitive projects is avoided altogether. The PICASSO also enhances the quality of the scheduling information normally found in simulation. Its scheduling procedures yield resource utilization statistics and activity chain float. The forward pass procedure computes early start dates and provides data for resource utilization statistics as well as for the backward pass calculations. The latter algorithm provides float information for each activity chain. Application examples illustrate the development and implementation of the method.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Abourizk, S., Halpin, D., and Lutz, J. (1992). “State of the art in construction simulation.”Proc., 1992 Winter Simulation Conf., 1271–1277.
2.
Carr, R. I., and Meyer, W. L.(1974). “Planning construction of repetitive building units.”J. Constr. Div., ASCE, 100(3), 403–412.
3.
Chang, D. Y., and Carr, R. I. (1987). “RESQUE: a resource oriented simulation system for multiple resource constrained processes.”Proc., PMI Seminar/Symp. Milwaukee, Wis., 4–19.
4.
Chrzanowski, E. N., and Johnston, D. W.(1986). “Application of linear scheduling.”J. Constr. Engrg., ASCE, 112(4), 476–491.
5.
Davies, R., and O'Keefe, R. (1989). Simulation modelling with Pascal. Prentice-Hall International, Ltd., Hertfordshire, U.K.
6.
Halpin, D. W. (1973). “An investigation of the use of simulation networks for modeling construction operations,” PhD thesis, University of Illinois, Urbana-Champaign, Ill.
7.
Halpin, D. W., and Riggs, L. S. (1992). Planning and analysis of construction operations. John Wiley & Sons, Inc., New York, N.Y.
8.
Harris, R. B. (1978). Precedence and arrow networking techniques for construction. John Wiley & Sons, Inc., New York, N.Y.
9.
Howell, G., Laufer, A., and Ballard, G.(1993). “Interaction between subcycles: one key to improved methods.”J. Constr. Engrg. and Mgmt., ASCE, 119(4), 714–728.
10.
Huang, R. Y., and Halpin, D. W. (1993). “Dynamic interface simulation for construction operations (DISCO).”Automation and robotics in construction, X. G. Watson, R. Tucker, and J. Walters, eds., 503–510.
11.
Kalk, A. (1980). “INSIGHT—interactive simulation of construction operations using graphical techniques.”Tech. Rep. No. 238, Constr. Inst., Dept. of Civ. Engrg., Stanford Univ., Stanford, Calif.
12.
Koskela, L. (1992). “Application of the new production philosophy to construction.” CIFE Tech. Rep. No. 72, Stanford Univ., Stanford, Calif.
13.
Laufer, A., and Tucker, R. L. (1987). “Is construction project planning really doing its job? A critical examination of focus, role and process.”Constr. Mgmt. and Economics, (5), 243–266.
14.
Martinez, J., Ioannou, P., and Carr, R. (1994) “State and resource based construction process simulation.”Proc., 1st Congr. on Computing in Civ. Engrg., ASCE, Washington, D.C. 177–184.
15.
Peer, S.(1974). “Network analysis and construction planning and control.”J. Constr. Div., ASCE, 100(3), 203–210.
16.
Primavera project planner 5.0 reference manual. (1992). Primavera Systems, Inc., Bala Cynwyd, Pa.
17.
Pritsker, A. A. (1986). Introduction to simulation and SLAM II. John Wiley & Sons, Inc., New York, N.Y.
18.
Reda, R. M.(1990). “RPM: repetitive project modeling.”J. Constr. Engrg. and Mgmt., ASCE, 116(2), 316–330.
19.
Riggs, L. S. (1989). “Risk management in CPM networks.”Microcomputers in civil engineering. Elsevier Applied Science, New York, N.Y., 229ndash235.
20.
Senior, B. A.(1995a). “Late-time computation for task chains using discrete event simulation.”J. Constr. Engr. and Mgmt., ASCE, 121(4), 397–403.
21.
Senior, B. A. (1995b). “Simulation and critical path method software connectivity.”Proc., 2nd Congr. on Computing in Civ. Engrg., ASCE, Atlanta, Ga., 1412–1419.
22.
Senior, B. A., and Halpin, D. W. (1994). “An integrated approach to repetitive construction planning.”Proc., 1st Congr. on Computing in Civ. Engrg., ASCE, Washington, D.C., 25–32.
23.
Tavakoli, A., and Riachi, R.(1990). “CPM USE in ENR top 400 contractors.”J. Mgmt. in Engrg., ASCE, 6(3), 282–295.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 124Issue 1January 1998
Pages: 72 - 81

History

Published online: Jan 1, 1998
Published in print: Jan 1998

Permissions

Request permissions for this article.

Authors

Affiliations

Bolivar A. Senior
Asst. Prof., Dept. of Manufacturing Technol. and Constr. Mgmt., Colorado State Univ., Fort Collins, CO 80523.
Daniel W. Halpin, Members, ASCE
Prof. and Head, Div. of Constr. Engrg. and Mgmt., Purdue Univ., West Lafayette, IN 47907.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share