TECHNICAL PAPERS
Jun 1, 1997

Planned Schedule Compression Concept File For Electrical Contractors

Publication: Journal of Construction Engineering and Management
Volume 123, Issue 2

Abstract

Planned schedule compression can be thought of as a reduction of the normal experienced time or optimal time for the type and size project being considered. In contrast to other forms of schedule compression, planned schedule compression is anticipated and provisions are made before the start of the construction phase of the project. This paper presents the development of the planned schedule compression concept file for electrical contractors. Each concept attempts to provide a significant, distinct, and executable objective for enhancing the construction process and minimizing the impacts of schedule compression. Twenty-nine different concepts are presented, categorically subdivided into seven sections including the organization, materials, equipment and tools, information, labor, support services, and construction methods. Each of these concepts can be effectively used during planned schedule compression situations. Seven concepts, one each involving employee incentives, material handling, vendor performance, equipment and tools, constructability, setup crews, and construction methods, have been selected from the concept file and are presented in their entirety.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Advisory Service for the Building Industry. (1969). “The principles of incentives for the construction industry.” London, England.
2.
Bell, L. C., and Stukhart, G.(1987). “Cost and benefits of materials management systems.”J. Constr. Engrg. and Mgmt., ASCE, 113(2), 222–233.
3.
Borcherding, J. D., and Sebastian, S. J. (1980). “Major factors influencing craft productivity in nuclear power plant construction.”Trans., Am. Assn. of Cost Engr., AACE, Morgantown, W. Va.
4.
Construction Industry Institute (CII). (1990). “Concepts and methods of schedule compression.”Source Document 55, Univ. of Texas at Austin, Austin, Tex.
5.
Construction Industry Institute (CII). “Constructability implementation guide.” (1993). Spec. Publ. 34-1, Univ. of Texas at Austin, Austin, Tex.
6.
Coskunoglu, O.(1984). “Optimal probabilistic compression of PERT networks.”J. Constr. Engrg. and Mgmt., ASCE, 110(4), 437–446.
7.
Entwistle, A., and Reiners, W. J. (1958). “Incentives in the building industry.”Spec. Rep. No. 28, Nat. Build. Study, H. M. Stationery Ofc., London, England.
8.
Great Britain Department of the Environment (DOE). (1974). “Incentive schemes for small builders.” H. M. Stationery Ofc., London, England.
9.
Heather, P. R. (1989). “Mathews curve—a model for evaluating impact.”Trans. Am. Assn. of Cost Engrs., AACE, Morgantown, W. Va., I.4.1–I.4.6.
10.
Laufer, A., and Borcherding, J. D.(1981). “Financial incentives to raise productivity.”J. Constr. Div., ASCE, 107(4), 745–757.
11.
Laufer, A., and Cohenca, D.(1990). “Factors affecting construction—planning outcomes.”J. Constr. Engrg. and Mgmt., ASCE, 116(1), 135–156.
12.
Laufer, A., and Moore, B. E.(1983). “Attitudes towards productivity pay programs.”J. Constr. Engrg. and Mgmt., ASCE, 109(1), 89–101.
13.
Marriott, R. (1961). Incentive payment systems, Staples, London, England.
14.
Moselhi, O.(1993). “Schedule compression using the direct stiffness method.”Can. J. Civ. Engrg., Ottawa, Canada, 20, 65–72.
15.
Muehlhausen, F. B. (1991). “Construction site utilization: impact of material movement and storage on productivity and cost.”Trans., Am. Assn. of Cost Engrs., AACE, Morgantown, W. Va., L.2.1–L.2.9.
16.
Noyce, D. A. (1995). “The impacts of planned and unplanned schedule compression or acceleration on the labor productivity of contractors,” MS thesis, Univ. of Wisconsin-Madison, Madison, Wis.
17.
O'Connor, J. T., Rusch, S. E., and Schulz, M. J.(1987). “Construction concepts for engineering and procurement.”J. Constr. Engrg. and Mgmt., ASCE, 113(2), 235–248.
18.
Perera, S.(1980). “Linear programming solution to network compression.”J. Constr. Div., ASCE, 106(3), 315–326.
19.
Perera, S.(1982). “Compression of overlapping precedence networks.”J. Constr. Div., ASCE, 108(1), 1–11.
20.
Ritchie, E. (1985). “Network based planning techniques: a critical review of published development.”Further Developments in Operational Research, G. Rand and R. Eglese eds., Pergamon Press Inc., Oxford, England.
21.
Ritchie, E.(1990). “Project compression: a method for speeding up resource constrained projects which preserve the activity schedule.”Eur. J. Operational Res., Montrouge, France, 49(1), 140.
22.
Senouci, A. B., and Hanna, A. S.(1995). “Scheduling of nonserial linear projects with multiple non-overlapping loop structures.”Civ. Engrg. Sys., 11, 1–17.
23.
Thomas H. R., Sanvido, and V. R., and Sanders(1989). “Impact of material management on productivity.”J. Constr. Engrg. and Mgmt., ASCE, 113(3), 370–384.
24.
Vrat, P., and Kriengkrairut, C. (1986). “A goal programming model for project crashing with piecewise linear time-cost trade-off.”Engineering Costs and Production Economics, Vol. 10, 161–172.
25.
Yau, C., and Ritchie, E.(1990). “Project compression: a method for speeding up resource constrained projects which preserve the activity schedule.”Eur. J. Operational Res., 49, 140–152.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 123Issue 2June 1997
Pages: 189 - 197

History

Published online: Jun 1, 1997
Published in print: Jun 1997

Permissions

Request permissions for this article.

Authors

Affiliations

David A. Noyce, Student Member, ASCE
PhD Candidate, Dept. of Civ. Engrg., Texas A&M Univ. System, College Station, TX 77843; formerly, Grad. Student, Dept. of Civ. and Envir. Engrg., Univ. of Wisconsin-Madison, Madison, WI 53706.
Awad S. Hanna, Member, ASCE
Assoc. Prof., Dept. of Civ. and Envir. Engrg., Univ. of Wisconsin-Madison, Madison, WI.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share