Combined Discrete-Event/Continuous Simulation for Project Planning

Publication: Journal of Construction Engineering and Management
Volume 123, Issue 1

Abstract

This paper focuses on the application of “combined simulation modeling” to achieve more accurate and flexible modeling of random processes affecting construction progress. In particular, a model is presented where a project schedule prepared using the critical path method (CPM) is transferred into a process interaction-discrete event simulation model and then combined with a continuous change weather process in the same model. The combined approach provides certain advantages to other methods. It is more effective than deterministically adding the expected delay due to weather to the expected duration of the project estimated from CPM, for example. It is also more accurate than using straight Monte Carlo-simulation of the CPM schedule or discrete event simulation modeling. The paper also provides an overview of the various aspects of implementing the combined model including use of mathematical and statistical methods to model weather processes and trained neural networks to estimate the effects of weather on productivity.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
AbouRizk, S., Halpin, D., and Lutz, J. (1992). “State-of-the-art in construction simulation.”Proc. 1992 Winter Simulation Conf., 1271–1277.
2.
AbouRizk, S., and Wales, R. (1993). “Incorporating weather effects in project simulation.”Proc., 5th Int. Conf. of Computing in Civ. Engrg., ASCE, New York, N.Y., 1990–1997.
3.
Ahuja, H. N., and Nandakumar, V.(1985). “Simulation model to forecast project completion time.”J. Constr. Engrg. and Mgmt., ASCE, 111(4), 325–42.
4.
Atmospheric Environment Service. (1991). Monthly record, 199, Environment Canada, Edmonton, Alta.
5.
Benjamin, N. B., and Greenwald, T. W.(1973). “Simulating effects of weather on construction.”J. Constr. Div., ASCE, 99(1), 175–90.
6.
Carr, R. I.(1979). “Simulation of construction project duration.”J. Constr. Div., ASCE, 105(2), 115–25.
7.
Dabbas, M. A., and Halpin, D. W.(1983). “Integrated project and process management.”J. Constr. Engrg. and Mgmt., ASCE, 108(3), 361–74.
8.
Flood, I., and Kartam, N.(1994). “Neural networks in civil engineering.”J. Computing in Civ. Engrg., ASCE, 8(2), 131–148.
9.
Katz, R. W. (1985). “Probabilistic models.”Probability, statistics, and decision making in the atmospheric sciences, A. H. Murphy and R. W. Katz, eds., Westview Press, Boulder, Colo., 261–285.
10.
Kavvas, M. L., Aksit, A. A., and Tulanay, Y. K. (1977). “A first order nonhomogeneous Markov chain for the daily rainfall occurrences in Ankara.”Proc., Symp. on Modeling Hydro. Process, Water Resources Publications, Littleton, Colo., 44–59.
11.
Koehn, E., and Brown, G.(1985). “Climatic effects on construction.”J. Constr. Engrg. and Mgmt., ASCE, 111(2), 129–137.
12.
Matalas, N. C.(1967). “Mathematical assessment of synthetic hydrology.”Water Resourc. Res., 3(4), 937–45.
13.
McCrimmon, K., and Rayvec, C.(1964). “An analytical study of the PERT assumptions.”Operations Res., 12(1), 16–37.
14.
Microsoft Corporation. (1992). Microsoft project for Windows, Redmond, Wash.
15.
Odeh, A. M., Tommelein, I. D., and Carr, R. I. (1992). “Knowledge-based simulation of construction plans.”Proc., 8th Conf. on Comp. in Civ. Engrg., ASCE, New York, N.Y., 1042–1049.
16.
Portas, J. (1996). “Predicting productivity using neural networks,” MS thesis, Univ. of Alberta, Edmonton, Alta., Canada.
17.
Pritsker, A. A. B. (1986). Introduction to simulation and SLAM II, 3rd Ed., John Wiley & Sons, Inc., New York, N.Y.
18.
Pritsker, A., Sigal, C. E., and Hammesfahr, R. D. J. (1989). SLAM II network models for decision support. Prentice Hall, Inc., Englewood Cliffs, N.J.
19.
Richardson, C. W.(1981). “Stochastic simulation of daily precipitation, temperature, and solar radiation.”Water Resour. Res., 17(1), 182–90.
20.
Sanders, S. R., and Thomas, H. R.(1993). “Masonry productivity forecasting model.”J. Constr. Engrg. and Mgmt., ASCE, 119(1), 163–179.
21.
Smith, G. R., and Hancher, D. E.(1989). “Estimating precipitation impacts for scheduling.”J. Constr. Engrg. and Mgmt., ASCE, 115(4), 552–566.
22.
Wales, R. J. (1994). “Construction project simulation,” MS thesis, Univ. of Alberta, Edmonton, Alta., Canada.
23.
Ward Systems Group. (1991). NeuroWindows—neural network dynamic link library. Frederick, Md.
24.
Woolery, J. C., and Crandall, K. C.(1983). “Stochastic network model for planning scheduling.”J. Constr. Engrg. and Mgmt., ASCE, 109(3), 342–54.
25.
Yevjevich, V. (1972). “Structural analysis of hydrologic time series.”Hydro. Paper 56, Colorado State Univ., Fort Collins, Colo.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 123Issue 1March 1997
Pages: 11 - 20

History

Published online: Mar 1, 1997
Published in print: Mar 1997

Permissions

Request permissions for this article.

Authors

Affiliations

Simaan M. AbouRizk
Alberta Constr. Industry Prof., Dept. of Civ. Engrg., Univ. of Alberta, Edmonton, Alberta, Canada T6G 2G7.
Rod J. Wales
Proj. Coordinator, North American Construction Group, 1674-111 Ave., Edmonton, Alberta, Canada T5M 2S4.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share