Construction Automation and Robotics—Pathway to Implementation
Publication: Journal of Construction Engineering and Management
Volume 121, Issue 1
Abstract
Research in construction automation and robotics has increased in popularity over the past few years. Although interest is high in the research and education communities, sustaining robust programs is difficult due to the diverse interests of constituents associated with the research and development process. The premise of this paper is that there is a need to develop and maintain strong construction automation and robotics programs in the United States. One way to assist in this goal is to address the concerns of the constituencies of research and development by focusing on a process leading to implementation. The interests of the constituents of the research and development process are examined, a process leading to implementation is presented, and results from a recently completed research project are presented as an example of the process. It is concluded that a systematic approach such as the one presented will enhance the success of construction automation and robotics programs as well as lead to faster adoption of advanced technologies for field applications.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Boles, W., Maxwell, D., Heerman, P., Scott, W., Adams, R., Flickinger, C., Gallegos, R., and Mannering, J. (1993). “Applications of robotics and other automated techniques to the construction, maintenance, and in-spection of highway systems.”Final Report Number FHWA/TX-93/1440-1F, Federal Highway Admin., Washington, D.C.
2.
Benekohal, R. F., and Kastel, L. M. (1991). “Evaluation of flagger training session on speed control in rural interstate construction zones.”Transp. Res. Record 1034, Transp. Res. Board, Washington, D.C., 270–291.
3.
Boyer, E. L. (1990). Scholarship reconsidered : Priorities of the professoriate. Princeton Univ. Press, Princeton, N.J.
4.
Crawford, F. S.(1988). “Culvert whistlers revisited.”Am. J. Physics, 56(8), 752–754.
5.
Culvert inspection manual (Supplement to the bridge inspector's training manual). (1986). Nat. Tech. Information Service, Springfield, Va.
6.
Decker, D. A.(1988). “FHWA launches bridge inspection workshops.”Roads & Bridges, 26(11), 30–33.
7.
“Eric takes a look around and around.” (1987). Nuclear Engrg. Int., 12, May, 68.
8.
Farid, F.(1993). “Editorial.”J. Constr. Engrg. and Mgmt., ASCE, 119(2), 193–195.
9.
Ho, R.(1982). “Development of a shaft inspection device.”Transp. Res. News, 102, 11–12.
10.
“Infrared thermography helps identify sewer trouble spots.” (1985). Water/Engrg. & Mgmt., 132(7), 18–19.
11.
Kangari, R., and Halpin, D. (1985). “Potential robotics utilization in construction.”J. Constr. Engrg. and Mgmt., ASCE, 115(1).
12.
Kikuchi, T., and Miura, S. (1993). “Study of a new 3-D measuring method for diaphragm walls.”Proc. 10th Int. Symp. on Automation and Robotics in Constr., Houston, Tex., 455.
13.
Kilger, M. (1992). “Video-based traffic monitoring.”Int. Conf. on Image Processing and Its Applications, Maastricht, Netherlands, 89–92.
14.
Lynch, T. (1993). “The technology reinvestment project—the government and industry as partners.”Advanced Composites, July/Aug.
15.
“Mole speeds tough culvert cleaning job.” (1987). Roads & Bridges, 25(5), 90–91.
16.
Noel, E. C., Dudek, C. L., Pendleton, O. J., and Sabra, Z. A. (1991). “Speed control through freeway work zones: techniques evaluation.”Transp. Res. Record 1163, Transp. Res. Board, Washington, D.C., 31–42.
17.
“Nuclear-sourced pig closes in on span and coating defects.” (1992). Offshore/Oilman, 52(10), 111.
18.
Paulson, B. (1985). “Automation and robotics for construction.”J. Constr. Engrg. and Mgmt., ASCE, 111(3).
19.
“Quartz-timed signs replace flaggers.” (1988). Better Roads, 58(9), 32.
20.
“Remote visual inspection in the nuclear, pipeline, and underwater industries.” (1990). Mater. Evaluation, 48(6), 797–803.
21.
Richards, S. H., Huddleston, N. D., and Bowman, J. D. (1981). “Driver understanding of work zone flagger signals and signaling devices.”Study No. 2-18-78-228, Texas Transp. Inst., College Station, Tex.
22.
“Robots put the finger on oil platform rust.” (1985). The Engr., 262(6761), 36.
23.
“Rotating camera and mirror allow video inspection of borehole.” (1986). Design News, 42(8), 102–104.
24.
Sakai, K., Ito, Y., Negishi, T., Deguchi, M., Nishiyama, K., and Kato, K.(1990). “In-tunnel traffic flow measuring system using an ITV camera.”Sumitomo Electr. Tech. Rev., Japan, 29, 154–160.
25.
“Should portable signals replace flagger.” (1991). Better Roads, 61(4), 39–40.
26.
Skibniewski, M., and Hendrickson, C. (1990). “Automation and robotics for road construction and maintenance.”J. Transp. Engrg., ASCE, 116(3).
27.
Steffes, R. F., Marks, V. J., and Dirds, K. L. (1991). “Video evaluation of highway drainage systems.”Transp. Res. Record 1329, Transp. Res. Board, Washington, D.C., 27–35.
28.
Stokoe, K., Hudson, W., and Miner, B. (1991). “Falling weight deflectometer and analysis of waves test for characterizing pavement moduli: A case study, final report.”Report Number FHWA/TX-91 + 1123-7F, Nat. Tech. Information Service, Springfield, Va.
29.
Sugiyama, I. (1993). “Safety at work zone—Example of safety measures,” presented at the Permanent International Association of Road Congresses, Yokohama, Japan.
30.
“Traffic controls for street and highway construction and maintenance operations.” (1980). Texas manual on uniform traffic control devices for streets and highways
31.
Tucker, R. (1988). “Perfection of the buggy whip.”J. Constr. Engrg. and Mgmt., ASCE, 114(2).
32.
Ullman, G. L., and Levine, S. Z. (1987). “An evaluation of portable traffic signals at work zones.”Transp. Res. Record No. 1148, Transp. Res. Board, Washington, D.C., 30–33.
33.
Uppal, A. S. (1980). Culvert inspection—Parts I and II. Simmons-Boardman Publishing Corp., Bristol, Conn.
34.
“Work zone safety efforts increased.” (1991). Public Works, 122(10), 76–78.
35.
Zhou, T. (1991). “Assessment of the state-of-the-art of robotics applications in highway construction and maintenance.”Final Report FHWA/CA/NT/CSU-91-01, Caltrans, Sacramento, Calif.
Information & Authors
Information
Published In
Copyright
Copyright © 1995 American Society of Civil Engineers.
History
Published online: Mar 1, 1995
Published in print: Mar 1995
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.