TECHNICAL PAPERS
Dec 1, 1994

Critical Analysis of Time and Cost of Management and Traditional Contracts

Publication: Journal of Construction Engineering and Management
Volume 120, Issue 4

Abstract

This paper presents some findings of a PhD research program conducted by Naoum in 1989, which sought to investigate whether the means of procurement influenced project performance. Ten factors were identified to measure project performance: (1) Preconstruction time; (2) construction time; (3) total time; (4) speed of construction; (5) unit cost of building; (6) time overrun; (7) cost overrun; and client satisfaction with (8) time, (9) cost, and (10) quality. A theoretical framework was used to assist in comparing project performance in a case study sample of 39 management contracts and 30 traditional contracts. From the evidence available in the writer's study, it must be concluded that in neither the management nor the traditional system lies the solution to all the problems facing the construction industry. To achieve project success, the parties need to match the various organizational forms to the client's characteristics, criteria, and priorities with respect to time, cost, and quality. The statistical analysis suggests that management contracting performs significantly better in some respects than traditional contracting, in particular, when time was the essence of the contract and when the project was highly complex. However, the research did not provide enough evidence to support the view that management contracting can reduce the overall building cost, or that the system can increase the standard of quality.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
ASCE Construction Management Committee. (1991). “Constructability and constructability programs: white paper.” J. Constr. Engrg. and Mgmt., ASCE, 117(1), 67–89.
2.
Barnes, M., et al. (1984). “Management contracting for health building—a comparative study.” Summary Rep., Dept. of Health and Social Security, Martin Barnes and Sons, London, England.
3.
Barrie, D. S., and Paulson, B. C. Jr. (1976). “Professional construction management.” J. Constr. Div., ASCE, 102(3), 425–436.
4.
“Faster building for industry.” (1983). Building research establishment. HMSO, London, England.
5.
Cornes, D. (1989). “The concept of design.” Construction contract policy; improved procedures and practice, J. Uff and P. Capper, eds., Ctr. of Constr. Mgmt., King's College, London, England, 67–73.
6.
Cornick, T. (1987). “Time to sort out management contracting.” Building Mag., No. 2, London, England.
7.
Curtis, B. (1989). “Observations from interviews with senior management in client, professional, and contracting organizations.” Rep.; Roles, responsibilities, risk in management contracts; GR/E 48343, Sci. and Engrg. Res. Council (SERC).
8.
Hayes, R. (1985). “The risks of management contracting.” Chartered Quantity Surveyor, (Dec. 8), 197–198.
9.
Hayes, R., Perry, J., and Thompson, P. (1983). “Management contracting.” Rep. No. 100, Construction Industry Research and Information Assoc. (CIRIA), London, England.
10.
Hillebrant, P. (1984). Analysis of the British construction industry. Macmillan Press Ltd., England.
11.
McKinney, J. (1983). “Management contracting.” Occasional Paper No. 30, Chartered Inst. of Build. (CIOB), Ascot, Berkshire, England.
12.
Mohsini, R. A., and Davidson, C. H. (1992). “Determinants of performance in the traditional building process.” J. Constr. Mgmt. and Economics, Vol. 10, Montreal, Canada, 343–359.
13.
Nahapiet, J., and Nahapiet, H. (1985). “The management of construction projects—case studies from the U.S. and U.K.” CIOB, Ascot, England.
14.
Naoum, S. G. (1989). “An investigation into the performance of management contracts and the traditional method of building procurement,” PhD thesis, Brunel University, England.
15.
Naoum, S., and Langford, D. (1984). “Management contracting: a review of the system.” Vol. 3, Proc., CIB W‐65 Symp. on Organization and Mgmt., Waterloo, Canada.
16.
Naoum, S., and Langford, D. (1987). “Management contracting—the client's view.” J. Const. Engrg. and Mgmt., 111(3), 369–384.
17.
Neate, G. (1982). “Introduction to management contracting.” Midland Study Centre Conf., Mgmt. Contracting, Birmingham, England.
18.
Rad, P. F., and Miller, M. C. (1978). “Trends in use of construction management.” J. Constr. Div., ASCE, 104(4), 515–523.
19.
Sidwell, A. (1984). “The measurement of success of various forms for construction projects.” Vol. 1, Proc., CIB W‐65 Symp. on Organization and Mgmt. Res. Lab., Waterloo, Canada.
20.
Standard form of management contract. (1987). Joint Contracts Tribunal, Building Employer Confederation, London, England.
21.
“Survey on management contracting.” (1985). Rep., Centre for Constr. Market Information, London, England.
22.
Tatum, C. B. (1987). “Improving constructability during conceptual planning.” J. Constr. Div., ASCE, 113(2), 191–207.
23.
Turner, D. (1986). Design and build contract practice. Longman's, London, England.
24.
Ward, S., Curtis, B., and Chapman, C. (1991). “Advantages of management contracting—critical analysis.” J. Constr. Engrg. and Mgmt., 117(2), 195–211.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 120Issue 4December 1994
Pages: 687 - 705

History

Received: Nov 18, 1992
Published online: Dec 1, 1994
Published in print: Dec 1994

Permissions

Request permissions for this article.

Authors

Affiliations

Shamil G. Naoum, Member, ASCE
Sr. Lect., South Bank Univ., Wandsworth Rd., London SW8 2JZ, England

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share