Scheduling of Repetitive Projects with Cost Optimization
Publication: Journal of Construction Engineering and Management
Volume 119, Issue 4
Abstract
Existing dynamic programming formulations are capable of identifying, from a set of possible alternatives, the optimum crew size for each activity in a repetitive project. The optimization criterion of these formulations is, however, limited to the minimization of the overall duration of the project. While this may lead to the minimization of the indirect cost of the project, it does not guarantee its overall minimum cost. The objective of this paper is to present a model that incorporates cost as an important decision variable in the optimization process. The model utilizes dynamic programming and performs the solution in two stages: first a forward process to identify local minimum conditions, and then a backward process to ensure an overall minimum state. In the first stage, a process similar to that used in time‐cost trade‐off analysis is employed, and a simple scanning and selecting process is used in the second stage. An example project from the literature is analyzed in order to demonstrate the use of the model and its validity, and illustrate the significance of cost as a decision variable in the optimization process.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Ahuja, H. N. (1984). Project management. John Wiley and Sons, Inc., New York, N.Y.
2.
Al Sarraj, Z. M. (1990). “Formal development of line‐of‐balance technique.” J. Constr. Engrg. and Mgmt., ASCE, 116(4), 689–704.
3.
Arditi, D., and Albulak, M. Z. (1979). “Comparison of network analysis with line of balance in a linear repetitive construction project.” Proc. Sixth INTERNET Congress, Vol. 2, Garmisch‐Partenkirchen, Munchen, Germany, 13–25.
4.
Arditi, D., and Albulak, M. Z. (1986). “Line‐of‐balance scheduling in pavement construction.” J. Constr. Engrg. and Mgmt., ASCE, 112(3), 411–424.
5.
Carr, R. I., and Meyer, W. L. (1974). “Planning construction of repetitive building units.” J. Constr. Div., ASCE, 100(3), 403–412.
6.
Chrzanowski, E. N., and Johnston, D. W. (1986). “Application of linear scheduling.” J. Constr. Engrg. and Mgmt., ASCE, 112(4), 476–491.
7.
Johnston, D. W. (1981). “Linear scheduling method for highway construction.” J. Constr. Div., ASCE, 107(2), 247–261.
8.
Lumsden, P. (1968). The line of balance method. Pergamon, Telgamon Press Ltd., London, England.
9.
Means building construction cost data. (1991). 49th Ed., R. S. Means Co., Inc., Kingston, Mass.
10.
Programming house building by line of balance. (1966). National Building Agency, London, England.
11.
Reda, R. (1990). “RPM: repetitive project modelling.” J. Constr. Engrg. and Mgmt., ASCE, 116(2), 316–330.
12.
Russell, A. D., and Caselton, W. F. (1988). “Extensions to linear scheduling optimization.” J. Constr. Engrg. and Mgmt., ASCE, 114(1), 36–52.
13.
Selinger, S. (1980). “Construction planning for linear projects.” J. Constr. Div., ASCE, 106(2), 195–205.
14.
Vorster, M. C., and Bafna, T. (1992). Discussion of “Formal development of line‐of‐balance technique,” by Z. M. Al Sarraj. J. Constr. Engrg. and Mgmt., ASCE, 118(1), 210–211.
Information & Authors
Information
Published In
Copyright
Copyright © 1993 American Society of Civil Engineers.
History
Received: Jul 9, 1992
Published online: Dec 1, 1993
Published in print: Dec 1993
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.