TECHNICAL PAPERS
Dec 1, 1991

Modeling Uncertainty in Operations with Nonstationary Cycle Times

Publication: Journal of Construction Engineering and Management
Volume 117, Issue 4

Abstract

This paper describes an approach for probabilistic analysis of construction operations in which nonstationary cycle times have a major impact on production. A nonstationary cycle time is defined as a cycle time that varies with the passage of time and project progress. Examples of projects in which non‐stationary cycle times affect production include linear operations such as highway construction and tunneling operations. As the project progresses the haul time of the earth‐moving equipment increases. Although the proposed approach is sufficiently general to be used with various types of construction operations, the specific model presented was developed for tunneling operations. The model predicts the muck‐handling requirements of the tunneling operation at the desired level of confidence. Application of the model is shown through a numerical example, and the results are compared with the results of a conventional deterministic analysis.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Ang, A. H.‐S., and Tang, W. H. (1975). Probability concepts in engineering planning and design: Vol. 1, John Wiley and Sons, Inc., New York, N.Y.
2.
Asai, T. (1986). “Scheduling of the main collider tunnel of the SSC project by the CYCLONE simulation system,” report presented to the University of Colorado, at Boulder, Colo., in partial fulfillment of the requirements for the degree of Master of Science.
3.
Halpin, D. W. (1990). MicroCYCLONE user's manual. Purdue University, West Lafayette, Ind.
4.
Riggs, L. S. (1989). “Numerical approach for generating beta random variables.” J. Computing in Civ. Engrg., ASCE, 3(2), 183–191.
5.
Touran, A., and Asai, T. (1987). “Simulation of tunneling operations.” J. Constr. Engrg. and Mgmt., ASCE, 113(4), 554–568.
6.
“Tunnel risk assessment.” (1989). Concept design report, Metcalf and Eddy, Boston, Mass.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 117Issue 4December 1991
Pages: 728 - 735

History

Published online: Dec 1, 1991
Published in print: Dec 1991

Permissions

Request permissions for this article.

Authors

Affiliations

Ali Touran, Member, ASCE
Asst. Prof., 420 Snell Engrg. Ctr., Dept. of Civ. Engrg., Northeastern Univ., 360 Huntington Ave., Boston, MA 02115

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share