Cost‐ and Schedule‐Control Integration: Issues and Needs
Publication: Journal of Construction Engineering and Management
Volume 117, Issue 3
Abstract
Cost control and schedule control are two of the most important management functions in the construction industry. Major research efforts are focused on developing procedures for improving the effectiveness of cost and schedule control. As a result, researchers are concerned with the quality, integrity, and timeliness of data that flow through such control systems. A number of data models have been proposed to integrate cost‐ and schedule‐control functions, because such integration is viewed as the, solution to the many problems facing construction projects today. This paper provides an overview of cost‐ and schedule‐control functions, defines the desired control cycle, and discusses the problems and needs of cost‐ and schedule‐control functions. A number of integrated cost‐ and schedule‐control data models, which represent the state of construction research in this area, are discussed. The work‐packaging model is briefly described and is suggested as the most likely existing model to achieve the desired cost and schedule integration. Finally, the conceptual design of a foundational data model for control, based on relational concepts, is provided. The recommended design adopts the conceptual structures of the work‐packaging model.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Adrian, J. J. (1986). Construction accounting. Prentice‐Hall, Englewood Cliffs, N.J.
2.
“Binary blueprints.” (1987). Bechtel Briefs, 42(5) 6–9.
3.
Beliveau, Y. J. (1989). “Automated position and control systems using lasers and electromagnetic signals.” Proc. 1st Constr. Congress, ASCE, 244–251.
4.
Bell, L. C., and McCullouch, B. G. (1988). “Barcode applications in construction.” J. Constr. Engrg. and Mgmt., ASCE, 114(2), 263–278.
5.
Bernold, L. E. (1990). “Bar code‐driven equipment and materials tracking for construction.” J. Comput. in Civ. Engrg., ASCE, 4(4), 381–395.
6.
Bar coding in construction. (1990). Ministry of Transp. of Ontario, System Appl. Section, Ottawa, Ontario, Canada, Nov.
7.
Carlsen, R. D., and McHugh, J. F. (1978). Handbook of construction operations forms and formats. Prentice‐Hall, Inc., Englewood Cliffs, N.J.
8.
Bell, L. C., and Gillis, J. K. (1989). “Bar code implementation guidelines and tutorial part I and part II,” Source Document No. 46, Part I and II, Constr. Industry Inst., Univ. of Texas, Austin, Tex., Mar.
9.
Date, C. J. (1987). An introduction to database systems. Vol. 1, Addison‐Wesley, Reading, Mass.
10.
“Cost and schedule control system criteria for contract performance measurement: Implementation guide.” (1980). Document Number DOE/CR‐0015, U.S. Dept. of Energy, Washington, D.C., May.
11.
Dorris, V. K. (1989). “Treading the paperwork trail.” Engrg. News‐Record, Dec. 7, 36–40.
12.
Halpin, D. W. (1985). Financial and cost concepts for construction management. John Wiley and Sons, New York, N.Y.
13.
Hendrickson, C. T., and Au, T. (1989). Project management for construction: Fundamental concepts for owners, engineers, architects, and builders. Prentice Hall, Englewood Cliffs, N.J.
14.
Ibbs, W. C., Ashley, D. B., Neil, J. M., and Feiler, F. W. (1987). “An implementation strategy for improving project control systems.” Project controls: needs and solutions (Proc. Speciality Conf.), C. W. Ibbs and D. B. Ashley, eds., ASCE, 101–112.
15.
Kim, J. J. (1989). “An object‐oriented database management system approach to improve construction project planning and control,” thesis presented to the University of Illinois, at Urbana, Ill., in partial fulfillment of the requirements for the degree of Doctor of Philosophy.
16.
Kratt, T. J. (1989). “Poor communication of schedule and cost control data between construction site management and field supervision improved by the weekly cost and schedule meeting for direct labor supervisors.” Proc. 1st Constr. Congress, ASCE, 387–390.
17.
Means forms for building construction professionals. (1986). R. S. Means Co., Kingston, Mass.
18.
Moder, J. J., Phillips, C. R., and Davis, E. W. (1983). Management with CPM, PERT, and precedence diagramming. Van Nostrand Reinhold Co., New York, N.Y. 1983.
19.
Neil, J. M. (1983). “A system for integrated project management.” Proc. Conf. on Current Practice in Cost Estimating and Cost Control, ASCE, 138–146.
20.
Pearce, S., and Stukhart, G. (1988). “Uniform bar code standards in construction,” presented at Mater. Mgmt. Task Force Meeting, Austin, Tex., Mar.
21.
“Project control for construction.” (1987). Publication No. 6‐5, Bureau of Engrg. Res., Univ. of Texas, Austin, Tex., Sep.
22.
Rasdorf, W. J., and Herbert, M. J. (1990a). “Automated identification systems—focus on bar coding.” J. Comput. in Civ. Engrg., ASCE, 4(3), 279–296.
23.
Rasdorf, W. J., and Herbert, M. J. (1990b). “Bar coding in construction engineering.” J. Constr. Engrg. and Mgmt., ASCE, 116(2), 261–280.
24.
Riggs, L. S. (1987). “Project control techniques.” Project controls: Needs and solutions (Proc. Speciality Conf.), C. W. Ibbs and D. B. Ashley, eds., ASCE, 11–25.
25.
Songer, A. D., Considine, C., and Ibbs, C. W. (1989). “Integrating voice recognition systems with the collection of project control data.” Proc. 1st Constr. Congress, ASCE, 409–415.
26.
Teicholz, P. M. (1987). “Current needs for cost control systems.” Project controls: Needs and solutions (Proc. Speciality Conf.), C. W. Ibbs, D. B. Ashley, eds., ASCE, 47–57.
Information & Authors
Information
Published In
Copyright
Copyright © 1991 ASCE.
History
Published online: Sep 1, 1991
Published in print: Sep 1991
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.